1 Technical Requirements - PG&E, Pacific Gas and Electric

Steam turbine main stop valves and reheat stop/intercept valves shall be shop-tested at 1.5 times the design inlet steam pressures. The generator and its appurtenances shall conform in all respects to the ANSI standards for synchronous machine (ANSI C50.10) and to the ANSI standard for cylindrical rotor synchronous generators (ANSI C50.14 ... ................
................