TOWER QR1 .gov

150

140

130

120

110

100

90

80

70

60

50

40

30

20

10

0

10

20

30

40

50

60

70

80

90

100 110 120 130 140 150

642.94

FILE NAME = \\svr202\public\proj\0003384.00\6_high_mast\design\Xsections\3384_6_High_Mast-xssht04.dgn

645 640 635

640 635

1:3 640.18

2.0%

6.0%

1:4

6.0%

1:4

1:3

PROPOSED UNIT DUCT

637.87

PLANS SHOW THE FUTURE RECONSTRUCTION AND WIDENING OF THE I-80 AT US ROUTE 30 INTERCHANGE FOR INFORMATION PURPOSES ONLY

ESTIMATED BEDROCK ELEVATION

637.55 639.15

1:3 636.34

2.0%

6.0%

6.0%

1:4

1:4

PLANS SHOW THE FUTURE RECONSTRUCTION AND

1:3

WIDENING OF THE I-80 AT US ROUTE 30 INTERCHANGE

FOR INFORMATION PURPOSES ONLY PROPOSED UNIT DUCT

635.11

ESTIMATED BEDROCK ELEVATION

645 640 635

30+00.00

640 635

28+50.00

625 620 615

622.05

2.0%

2.0%

2.0%

2.0%

4.0%

1:3 1:3

4.0% 2.0%

620.72

2.0%

2.0%

4.0%

PLANS SHOW THE FUTURE RECONSTRUCTION AND WIDENING OF THE I-80 AT US ROUTE 30 INTERCHANGE FOR INFORMATION PURPOSES ONLY

ESTIMATED BEDROCK ELEVATION

2.0% 1:3

621.89 621.55

625

620

615

21+50.00 TOWER QR1

150 140 130 120

Ciorba Group, Inc.

5507 North Cumberland Avenue, Suite 402

Chicago, Illinois 60656

Tel. 773.775.4009

Fax 773.775.4014

110 100

90

80

USER NAME = rrado

DESIGNED -

DRAWN

-

PLOT SCALE = 20.0000 ' / IN.

CHECKED -

PLOT DATE = 2/13/2012

DATE

-

70

WBL WBL JMV 02-14-2012

60

REVISED REVISED REVISED REVISED

50

-

40

30

20

10

0

10

20

STATE OF ILLINOIS DEPARTMENT OF TRANSPORTATION

30

40

50

60

70

80

90

100 110 120 130 140 150

F.A.I. ROUTE 80 AT U.S. ROUTE 30 LIGHTING

CROSS SECTIONS RAMP BD PROPOSED HIGH MAST LIGHTING LOCATIONS

F.A.I. RTE.

80

SECTION 2011-046-L

COUNTY

TOTAL SHEET SHEETS NO.

WILL

106

104

CONTRACT NO. 60P56

SCALE:

SHEET NO. OF SHEETS

STA2. 1+50.00 TO STA. 30+00.00

FED. ROAD DIST. NO. _ ILLINOIS FED. AID PROJECT

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download