TABLE OF CONTENTS

I. INTRODUCTION 3

II. RATING PROCEDURE 4

A. Risk Assessment Model 4

B. Assumptions and Limitations 9

C. Risk Reduction 10

III. FIELD EVALUATION 11

IV. DATABASE AND REPORTING 12

A. Computer System and Database 12

B. Reports 12

V. PROGRAMMING OPTIONS 13

VI. UPDATING THE DATABASE 15

REFERENCES 16

APPENDIX 17

A. Derivation of the Active and Passive Condition Human Exposure Factors A-1

B. Field Procedures for Rating Rock Slopes B-1

C. Guidelines for Determining Risk Reduction C-1

D. Sight Distance Tables (from NYSDOT Highway Design Manual) D-1

I. INTRODUCTION

In the winter of 1988, NYSDOT resident maintenance engineers were asked to send the Geotechnical Engineering Bureau lists of rock slope locations in their areas of responsibility that might conceivably be considered potential rockfall problem sites, screening them by the following criteria (listed in order of importance):

1. Areas with rockfall histories,

2. Posted rockfall zones,

3. Obviously unstable rock masses,

4. Overhanging rocks,

5. Highly fractured and jointed oversteepened slopes (those higher than the setback from the shoulder edge),

6. Areas of ice buildup on slopes,

7. Fallen rock in ditches,

8. New cracks or gaps in the rock,

9. Areas with soil deltas at the toes of rock slopes, and

10. Rock slabs on slopes inclined toward the roadway.

A total of 1741 sites were identified and then evaluated by geologists from the Geotechnical Engineering Bureau, using an initial rating system based on a procedure originally developed for the Federal Highway Administration (FHWA) by Duncan C. Wyllie of the geotechnical consulting firm of Golder Associates. This procedure was considered state-of-the art at the time, and was included in FHWA's Rock Slopes manual1. Although the Department used this system in developing a rock slope ranking, no implementation policy was established. Also, identification of potential rockfall sites is an open-ended process, because sites may be added at any time. NYSDOT has now devised a revised system believed to have these three distinct advantages:

( It isolates three components of a possible rockfall-vehicle accident as independent factors,

( It more objectively addresses the question of how much risk is associated with a falling rock hitting a vehicle, as well as the risk of a vehicle hitting a fallen rock, and

( It considers not only risk posed by an existing rock slope, but level of risk remaining after remediation.

The proposed rating procedure for rock slopes was presented to the Assistant Commissioner and Chief Engineer, approved, and a working draft issued in May 1993.

II. RATING PROCEDURE

This procedure outlines the creation of "factors" -- geologic, section, and human exposure -- for computing relative risk of a rockfall-related accident occurring at any site listed in the statewide rock slope inventory. The product of these factors is defined as "total relative risk." The risk assessment model computes relative -- not absolute -- risk of rockfall accidents occurring along various rock slopes adjoining state highways. That is, the values created by this model do not actually establish how much risk is posed at a particular site, but indicate only whether risk at a given rock slope is more or less than that posed by other rock slopes.

The rating system does not indicate risks associated with rock slopes as roadside hazards, nor does it provide a means of comparing risks posed by rockfalls with other dangers to traffic. It does not consider possible catastrophic slope failures -- when predictable, those situations are addressed and treated with appropriate urgency.

A. RISK ASSESSMENT MODEL

This rating procedure has been developed to establish appropriate relationships among the following three separate factors in assessing comparative risks of accidents being caused by rockfalls:

1. Geologic properties of the rock slope,

2. Ditch configurations and slope offset from the pavement edge (or shoulder edge where one exists) and

3. Traffic volume and stopping sight distance on the highway approaching the site.

The following analysis of relative risk to the public at any particular rock slope site is based on the concept that geologic, cross-sectional, and traffic-related factors at a particular site can increase or reduce risk. Each factor is assumed to be independent of the others. The factors can be combined (multiplied) to create a number representing total relative risk of a rockfall causing a vehicular accident at each rock slope on the statewide inventory.

For the following discussion, these factors are defined as follows:

1. Geologic Factor (GF)

This number represents the risk of rock(s) falling, based on the slope's specific geologic and physical characteristics.

2. Section Factor (SF)

This number represents the relative risk of fallen rocks reaching the highway's travel lanes. It is related to ditch and shoulder geometry and to rock slope offset.

3. Human Exposure Factor (HEF)

This number represents the relative risk of a traffic accident occurring, given that a rockfall occurs and rock comes to rest on the roadway.

Definitions and procedures to be used in establishing the numerical values are as follows:

1. Geologic Factor (GF)

This is a factor representing risk of a consequential rockfall occurring. "Consequential" means one of a size that may reasonably be expected to cause personal injury if it reaches the pavement, landing on or in front of an approaching vehicle.

The numerical value for GF consists of the sum of points assigned to each of the following categories divided by 10. The division by 10 is done solely to reduce its numerical value. Each category is scored on a scale ranging from 1 to 81, with 1 the lowest risk and 81 the highest (see Appendix B):

( Geology of fractures in the rock structure,

( Geology of bedding planes,

( Block size,

( Rock friction,

( Water and ice conditions,

( Rockfall history, and

( Condition of the backslope above the rock cut.

2. Section Factor (SF)

This represents the risk that fallen rock(s) would actually reach the pavement, by comparing actual ditch geometry and rock slope offset with the widely accepted "Ritchie Ditch Criteria" (Fig. 1). Ditch geometry meeting these criteria will reduce the number of rocks escaping the catchment area to a maximum of 15 percent.

SF is computed as the ratio of the required Ritchie criteria to actual dimensions, yielding a number representing the risk that a rock, if it falls, will reach the pavement. The SF numerical value is computed as follows:

SF = (DR + WR)/(DA + WA); where (1)

DR = ditch depth in feet (meters) (from the Ritchie graph),

WR = ditch width in feet (meters) (from the Ritchie graph),

DA = actual ditch depth in feet (meters), measured in the field, and

WA = actual offset distance in feet (meters), (minimum value of 3 ft. (1 m)) from the toe of the rock slope to the pavement edge (or shoulder edge where one exists).

This numerical value ranges from 1 or less in the best circumstances, to about 11 in the worst, such as a curbed section with a high rock slope immediately adjoining the curb. The Ritchie criteria do not take massive rockfalls into consideration -- a voluminous rockfall could overfill a ditch meeting or exceeding the referenced Ritchie criteria.

[pic]

Figure 1a. Ritchie ditch criteria – Ditch Design Chart [Figure 12.10 from FHWA's

(US Customary Units) Rock Slopes manual1].

For example, for a 50 ft. high, 3V/1H cut slope (71.6( slope angle), the Ritchie criteria would call for a 6 ft. deep, 18 ft. wide ditch.

[pic]

Figure 1a. Ritchie ditch criteria – Ditch Design Chart [Figure 12.10 from FHWA's

(International System Rock Slopes manual1] converted by New York State D.O.T.

of Units)

For example, for a 15.2 m high, 3V/1H cut slope (71.6( slope angle), the Ritchie criteria would call for a 1.8 m deep, 5.5 m wide ditch.

[pic]

Figure 1b. Ritchie ditch criteria – Rock Falls on Slopes [Figure 12.10 from FHWA's Rock Slopes manual1]

3. Human Exposure Factor (HEF)

If rock does fall and reaches the roadway, a vehicle is threatened with impact by two separate mechanisms: 1) the falling rock will hit a vehicle or land so close to an approaching vehicle that it runs into the rock, or 2) the vehicle will hit a previously fallen rock that has come to rest on the roadway. The rock in the first situation may be considered to be in an "active" condition, because it is falling as the vehicle approaches or passes under the point of impact. The second situation could be termed a "passive" condition, because the rock has landed before the vehicle approaches, and is then hit by the vehicle.

a. Active Condition

This is defined as the situation occurring when the approaching driver either has no perception of the rock falling, or perceives it only as being in the process of falling. Two conditions exist.

The first is when a moving vehicle is hit by falling rock. In the second, an approaching vehicle runs into rock that has just fallen. The driver sees the rock falling but is unable to stop the vehicle in time to avoid a collision.

It can be demonstrated (see Appendix A) that for these two active condition cases, the probability of a vehicle being hit by a falling rock or running into one can be expressed by this equation:

Fa = AADT x [(L + SSD)/(V x 24,000)]; where (2)

Fa = active condition factor,

AADT = average annual daily traffic (two-way for two-lane undivided highways, or one-way for divided highways).

L = length of rockfall zone in feet (meters),

SSD = stopping sight distance in feet (meters) [from the NYSDOT Highway Design Manual2],

V = travel speed in mph (km/h),

b. Passive Condition

This passive condition analysis applies for a single accident, and does not address the possibility of subsequent vehicles colliding with the first vehicle or the fallen rock. The rockfall has occurred and come to rest in the travel lane at some time before any vehicle approaches the rockfall zone. If the highway section has adequate stopping sight distance (SSD) as defined by tables in Chapter 2 of the NYSDOT Highway Design Manual (reproduced here in Appendix D) it is assumed that no accident would occur. A driver may perceive the problem, and react to avoid hitting the rock. Conversely, if SSD is less than adequate, collision with the fallen rock is likely. The governing factors in this situation are taken as the SSD required, as compared to that available. From an engineering viewpoint, this situation is objective for analysis purposes, because both the available decision sight distance (DSD) and required SSD can be confidently determined by the established AASHTO method3 and the NYSDOT Highway Design Manual. If SSD is adequate, an accident will probably not occur (passively). If SSD is inadequate, however, an accident probably will occur when the next vehicle enters the rockfall area.

It can be demonstrated (see Appendix A) that for the passive condition, relative risk of a vehicle hitting an already-fallen rock can be expressed by the following equation:

Fp = log10 (AADT) x log10 (L)[a/(SSD - a)]; where (3)

a = max [(SSD - DSD),0], and

Fp = passive condition factor.

The HEF number is then defined as the sum of the active and passive risk values divided by 3, representing total relative risk of an accident occurring if a consequential rockfall reaches the highway, or

HEF = (Fa + Fp) /3

The sum is divided by 3 solely to reduce its numerical value.

The following information is then needed to compute HEF values for each rock slope site:

( Average Travel Speed: This value will be established by the regional staff.

( AADT: these values are readily available.

( DSD: actual available sight distance must be measured in the field for each site. Record plan information often does not suffice, because in many instances vertical sight distance will control.

4. Total Relative Risk

Relative risk of an accident occurring at a rock slope site can now be established. If the Section Factor is 1 or less, Total Relative Risk is set at 1. Otherwise, it is equal to the product of the three factors:

Total Relative Risk = GF x SF x HEF

B. ASSUMPTIONS AND LIMITATIONS

Several assumptions and simplifications have been made in this analysis. Raters should be aware of them, and gage their effects on ratings computed for actual field situations:

1. First, the analysis assumes that falling rock will come to rest on both travel lanes of a two-lane, two-way highway, or on all lanes in one direction on a multi-lane highway. If, in the latter case, a rockfall does not come to rest on all the lanes, the analysis model would be faulty because traffic volume is assumed to be equally distributed over all lanes. Simply assuming that the rockfall would in all cases extend across all travel lanes probably induces less error, and is certainly less complicated than analyzing the probability of the outer travel lanes being occupied.

2. The model used to generate active and passive HEFs has been based on daylight stopping sight distance.

3. It has also been assumed that all rockfall accidents would be equal in severity. No attempt was made to distinguish non-injury situations from personal injury or fatal accidents. The likelihood of serious personal injury or fatality was taken to be equal at all rockfall locations.

4. Catastrophic rock slope failure, where an entire slope might fall and cover the highway, is not modeled in this procedure. Where a massive failure is predicted, the Department would take appropriate action.

C. RISK REDUCTION

Computation of total relative risk for a rock slope has just been described. The resulting values are useful in gauging the risk posed by one rock slope as compared to others, but of limited value as decision tools when addressing the issue of the possible benefit of undertaking a specific treatment at a site. For that purpose, the concept of "risk reduction" is more useful, defined as the benefit provided by one of several possible treatments applicable to a given rock slope. If the amount of total relative risk expected after a slope is treated is called "residual risk," then

Risk Reduction = Total Relative Risk - Residual Risk

A residual risk target value can be computed by recalculating total relative risk, based on GFs, SFs, and HEFs associated with a recut slope meeting the Ritchie ditch criteria. This level of remediation can be viewed as the "optimum" residual risk. Improvements of total residual risk beneath this optimum value would be impractical in most cases, unless the slope was completely removed or the highway relocated. Optimum residual risk value should not be treated as a goal that must be achieved, but as a gage of what can be accomplished. Other remedial treatments -- such as rock scaling, rock bolting, use of a rock catchment fence, etc. -- will result in some risk reduction. These treatments will only reduce the risk associated with the geologic factor. Guidelines for determining risk reduction for various remedial treatments are given in Appendix C.

III. FIELD EVALUATION

All sites in the inventory and any subsequently identified will be rated according to this new procedure. Appendix B is the field manual to be used in collecting required data.

Prime responsibility for rating sites lies with engineering geologists of the Geotechnical Engineering Bureau. A site selected for re-evaluation will be inspected by a team including Main Office engineering geologists and a designated regional representative. The first step will be determining if the site should actually be considered "significant," based on determination by the geologists as to whether a rockfall could reasonably be expected to come to rest on the pavement (travel lane). This determination is based on the SF criteria presented earlier and on judgment of the raters. If they find that a rockfall is unlikely to reach the pavement, the site would be deemed "not significant."

If deemed "significant," the rating team will obtain all field data needed to compute total relative risk. While at the site, they will also establish which specific remedial treatments are applicable. Data needed will be obtained to compute residual risk associated with each applicable treatment. In addition, Geotechnical Engineering Bureau staff will estimate quantities for slope-remediation components of each applicable treatment, and the regional staff will estimate quantities of non-rock slope components (traffic maintenance and protection, highway work, right-of-way, etc.) associated with each treatment. The Regional Geotechnical Engineer will be responsible for coordinating all required input. When necessary, the region will provide proper work-zone safety equipment and/or personnel to protect the field evaluators.

The Geotechnical Engineering Bureau will use field data, along with current traffic volumes supplied by the regions, to compute total relative risk at each significant site, and also to compute risk reductions provided by remediation treatment(s). These values will be submitted to the regions for their information.

IV. DATABASE AND REPORTING

A. COMPUTER SYSTEM AND DATABASE

The database listing of all required data will be maintained at one central location. The Engineering Geology Section (called "Geology" here for brevity) of the Geotechnical Engineering Bureau will maintain and have prime control and full responsibility for the integrity of the data and the system.

1. Current Operations

Geology will obtain, input, and update data on a computer file, including site description, geological rating, contract work history, and maintenance work history. The region will provide records or summaries of relevant remedial work performed by maintenance forces or other operations to Geology through the Regional Geotechnical Engineer. Rockfall reports from the regions will be incorporated into the database. Reports containing rock slope information may be obtained by any requesting group. The point of contact for all regional groups will be the Regional Geotechnical Engineer, who in turn will request data from the Highway Design and Construction Section of the Geotechnical Engineering Bureau. Main Office groups may obtain reports through the same Bureau section.

2. Future Operations

Eventually, the Geology computer will be tied into the Network Database Server (NDS), allowing direct access for each region. Through the Regional Geotechnical Engineer, regions will be able to access, input, and obtain reports from the NDS through their computers. Only Geology will be able to change rating information. Both the regions and Geology will be able to update information. The regions will update remedial work records - both contract and maintenance.

B. REPORTS

These will be accessible in many formats. Information can include data sheets for specific rock slope sites, date(s) last inspected, and the following:

1. Rock Slope Location Listing: by region or statewide, county, residency, and route.

2. Statewide, Region, County, Residency, and Route Listing: by total relative risk, residual risk, risk reduction, and benefit/cost ratio (risk reduction divided by estimated cost).

V. PROGRAMMING OPTIONS

Sites having special or unique circumstances relating to human exposure may be subjectively adjusted in ranking order at the Regional Director's discretion. In such cases, the region will document the facts and reasons for adjustment. This allows consideration of conditions not reflected in the model presented earlier in Chapter II, such as:

( High volumes of pedestrian or bicycle traffic exposed to a rockfall hazard, or

( Essential, high-volume highways where a detour might present more risk than the disruption caused by a rockfall, or

( Occupied dwellings/buildings or other public facilities exposed to risk.

No specific guidelines are proposed here regarding exact criteria for regional decision-makers in programming rock slope remediation. Instead, various strategies are outlined, and the role of decision tools presented in Chapter II is explained. The ability to quantify risk reduction facilitates establishing goals. A region could base programming decisions on a goal of reducing rockfall risk by a certain amount over some period of years. The following programming strategies are suggested:

1. Target the Highest Total Relative Risk

This gives highest priority for repair work to rock slopes presenting greatest risk, without considering the cost of remediation, risk reduction, or cumulative risk of other rock slopes.

2. Target the Greatest Risk Reduction

This gives highest priority to sites where greatest amount of risk can be eliminated. In many cases, this may give a ranking identical or similar to that based on total relative risk. Sites would be ranked on the basis of greatest risk being eliminated. Costs of remediation and cumulative risk reduction of other rock slopes would not be considered.

3. Target the Greatest Reduction Per Unit Cost

This bases decisions on eliminating the greatest amount of rockfall risk at any funding level. Sites would be ranked by benefit/cost ratio of remediation. (Regions may estimate remediation cost based on quantities estimated by rating teams. Sites with highest total relative risk might not have highest priority.)

4. Combine Rock Remediation With Other Highway Work

This would allow decision-makers to examine risk levels of all significant sites within their region, and judge whether to include rock slope remediation in some future highway project containing the site, saving the cost of administering a separate, smaller project.

5. Group Locations

This can be advantageous where several separate sites are within a given geographical area. When combined as one project, lower unit costs can usually be obtained.

In the future, total relative risk values generated by this rating procedure may also be used to gage when other actions are appropriate. Ranges of total relative risk values may be established that correspond to various actions, such as:

( Doing nothing.

( Visual monitoring by maintenance patrols.

( Re-inspection by geologists at various intervals.

( Monitoring with instrumentation.

( Repairing by contract 1) immediately, 2) by special contract, 3) by combining with the next scheduled contract, or 4) by inclusion in the five-year program.

( Closing the highway intermittently until repaired.

VI. UPDATING THE DATABASE

To meet program objectives, existing data must be updated periodically, with information originating from the regions or the Geotechnical Engineering Bureau.

The regions may add new slopes to the program at any time by notifying the Geotechnical Engineering Bureau. Adding a slope will prompt Geology to perform a rating. Any remedial work to slopes already in the program -- by construction contract, maintenance contract, or maintenance forces -- should be recorded by the region and reported, when completed, to the Geotechnical Engineering Bureau through the Regional Geotechnical Engineer, triggering the re-evaluation process. Actual rockfalls of any magnitude should be reported in a timely manner to the Geotechnical Engineering Bureau on the Rockfall Report Form (completed by the Transportation Maintenance Division) or other means.

The Geotechnical Engineering Bureau will periodically update cost of the work and traffic information, and revise the database to include the new information.

REFERENCES

1. Rock Slopes (:) Design, Excavation, Stabilization. Seattle: Golder Associates, (for the Federal Highway Administration, U.S. Department of Transportation), May 1988 (4th ed.).

2. "Design Criteria." Chapter 2 in the Highway Design Manual, Design Quality Assurance Bureau, New York State Department of Transportation, July 1994.

3. A Policy on Geometric Design of Highways and Streets. Washington: American Association of State Highway and Transportation Officials, 1984, pp. 158-59.

4. Manual of Uniform Traffic Control Devices. New York State Department of Transportation, July, 1, 1983.

5. Barrett, R.K., Bowen, T., Pfeiffer, T., and Higgins, J. Rockfall Modeling and Attenuator Testing. Report CDOH-DTD-ED3/CSM-89-2, Colorado Department of Highways and Colorado School of Mines, March 1989.

6. Pfeiffer, T. Rockfall Analysis Using ROCKFALL Computer Simulations. Geotechnical Services Unit, Oregon Department of Transportation, August 1993.

APPENDIX

DERIVATION OF ACTIVE AND PASSIVE HUMAN-EXPOSURE FACTORS (HEFs)

HEF is the relative risk of an accident happening, after a rock actually falls onto the highway. Because rockfall accidents have never been a specific category for routine reporting, historical data are extremely limited. Derivation of the HEF formula as described here is thus based on engineering judgment. To calculate HEF, consider two separate possibilities for a rockfall accident -- the "active" and "passive" conditions.

The Active Condition

This involves a falling rock hitting a traveling vehicle, or landing so close to an approaching vehicle that the driver cannot avoid striking the rock. It differs from the "passive" condition in that the rockfall must occur while the vehicle is within a specific approach distance from the rockfall. Calculation of the Active Condition Factor Fa is based on the time during which the vehicle is at risk. To calculate time-at-risk, one separately analyzes two scenarios for an active-condition accident:

1. A Moving Vehicle is Hit by a Falling Rock

A vehicle is at risk of being hit by a falling rock during the following time (in days):

ti = L/(V x 126,720) for US Customary Units (1a)

where L is length of the rock cut (in feet) from which a rock may fall and reach the pavement, and V is the traveling speed limit (in mph) assumed to govern drivers in the zone. The coefficient 126,720 (conversion factor of 5280 ft./m x 24 hr/day) expresses the result in days.

ti = L/(V x 24,000) for International System of Units (1b)

where L is length of the rock cut (in meters) from which a rock may fall and reach the pavement, and V is the traveling speed limit (in km/h) assumed to govern drivers in the zone. The coefficient 24,000 (conversion factor of 1000 m/km x 24 hr/day) expresses the result in days.

2. A Moving Vehicle Strikes a Rock That Has Just Fallen

The driver sees it falling but cannot stop the vehicle in time to avoid collision. In this scenario, the vehicle is already at risk once within the SSD (stopping sight distance) from the rockfall zone. The time-at-risk (in days) thus is:

tii = (L + SSD)/(V x 126,720) for US Customary Units (2a)

tii = (L + SSD)/(V x 24,000) for International System of Units (2b)

It is assumed that the second scenario would occur much more often than the first, and one thus finds a conservative value for time-at-risk by using Eq. 2. To find risk for an entire highway section, one takes traffic volume into account by multiplying this time-at-risk by an AADT value. (AADT should be the two-way value for a two-lane undivided highway, or the one-way value for a divided highway.) The Active Condition Factor thus is equal to

Fa = AADT [(L + SSD)/(V x 126,720)] for US Customary Units (3a)

Fa = AADT [(L + SSD)/(V x 24,000)] for International System of Units (3b)

The Passive Condition

This occurs after a rock has landed on the pavement, and sometime later a vehicle approaches. The driver may then avoid collision if the rock is spotted in enough time to stop or safely maneuver around it. It thus is assumed that the driver and rockfall will not interact -- no accident will occur -- if the driver has sufficient SSD (as defined in Chapter 2 of the NYSDOT Highway Design Manual2). Conversely, if the available stopping sight distance - here called Decision Sight Distance or DSD, and field-measured as outlined by AASHTO -- is inadequate, collision with the fallen rock would be likely. The governing factor here is the SSD required, as compared to that available (i.e., DSD). Derivation of Eq. 4 for the Passive Condition Factor Fp is much more subjective than derivation of the Active Condition Factor, Fa, but the Fp values calculated for rockfall zones in New York State seem consistent with sound engineering judgment. The following formula is suggested for the Passive Condition Factor:

Fp = (log10 AADT) (log10 L) [a/(SSD -a)] (4)

where a is the larger of the two numbers: (SSD - DSD) or 0, and L is length of the rockfall zone in feet (meters). Eq. 4 is meant to represent the influence of factors affecting relative risk of an accident. Note that the factor a/(SSD - a) reflects the increased risk when the DSD is less than the required SSD. Traffic volume AADT may seem inconsequential when determining risk for the passive condition -- an accident will probably occur sooner or later when other vehicles enter the rockfall area. However, the factor log10(AADT) reflects the limited possibility of maneuvering or stopping safely in congested traffic, and also the limited time available for removing the rock from the pavement once it is noticed. The factor log10(L) would be replaced by L if one could assume that the measured DSD is relevant for the entire length of the rockfall zone. Data now available include the DSD values measured at the worst areas of rockfall zones, which means that significant portions of long rockfall zones may have adequate SSD. To suppress the undesirable effects of large values of L, one uses the logarithm function log10(L).

The active and passive condition factors now are combined to calculate the Human Exposure Factor:

HEF= (Fa + Fp)/3 (5)

FIELD PROCEDURES FOR RATING ROCK SLOPES

These procedures establish a uniform statewide procedure for obtaining field information required in determining total relative risk of a rock falling from a slope, reaching the pavement, and hitting or being struck by a vehicle. Total relative risk is defined as the product of the Geologic Factor, multiplied by the Section Factor, multiplied by the Human Exposure Factor. All three factors require field observations or measurements, recorded on Form GE 470 MET (see pages 29 & 30). In addition, possible remedial treatments must be determined while in the field, and those generally acceptable are covered here. All field evaluators must be accompanied by designated Regional representatives.

Safety

Rock slope rating surveys take place in potentially hazardous locations. Dense, high-speed traffic areas are particularly dangerous. Consequently, attention to safety is essential when evaluating rock slopes. Evaluators should assess the risks, and consult the appropriate Regional Safety Coordinator to plan and arrange backup support where necessary.

Geotechnical Engineering Bureau employees often must work close to vehicular traffic. In some instances, this work involves long-term operations and the Transportation Maintenance Division forces should establish work-zone protection. At other times, work may take place at the roadside for short periods, but these can be equally dangerous. When the work is of brief duration and the crew may consist of only a few inspectors traveling in a passenger vehicle, it is not practical or possible to set up a signed work zone as in maintenance operations. Nevertheless, several guidelines should be followed to ensure safety while working on highways for short periods.

When work or inspection is to be completed on the shoulder or in an area adjoining the highway, pull the vehicle as far off the road as possible and turn on the four-way flashers. If the evaluators must be on the shoulder, station a lookout facing traffic to warn co-workers of approaching vehicles.

If inspecting in the traffic lane, use extreme caution. A flagger should be stationed a substantial distance preceding the operation at a location based on sight distance, speed limit, traffic volume, road conditions, type of work, and the obstacle that the work presents. The flagger should be alert at all times and stand facing oncoming traffic. Refer to MUTCD4 for specific information on work-zone protection and traffic control procedure.

Equipment

1. Hard hats

2. State car with bubble light (may need Maintenance backup)

3. 100 ft. (30 m) cloth tape

4. Brunton compass or inclinometer

5. Range finder

6. Range/height finder

7. Measuring wheel

8. Field rating sheets (laptop computer optional) and pertinent data

9. Clipboard

10. Camera

11. 6 in. (150 mm) sight-distance target and 3 ft. (1.0 m) rod [eye height according to AASHTO Design Policy3]

Requirement:

Each site must be photographed during the field evaluation.

FIGURE 2. CATEGORIES FOR GEOLOGIC FACTOR

| | | | | | | |

|1A |GEOLOGY |Massive, no fractures |Discontinuous fractures, random |Fractures that form wedges |Discontinuous fractures |Continuous fractures dipping out of|

| |(Xtal.) |dipping out of slope |orientation | |dipping out of slope |slope |

| | | | | | | |

|1B |GEOLOGY |Horizontal to slightly |Raveling, occasional small blocks |Small overhangs or columns, |Overhangs, some large unstable|Bedding or joints dipping out of |

| |(Sed.) |dipping | |numerous small blocks |blocks, high columns |slope, over- steepened cut face |

| | | | | | | |

|2 |BLOCK SIZE |6 in. (150 mm) |6 in. to 12 in. |1 ft. to 2 ft. |2 ft. to 5 ft. |5 ft. or more |

| | | |(150 mm to 300 mm) |(0.3 m to 0.6 m) |(0.6 m to 1.5 m) |(1.5 m or more) |

| | | | | | | |

|3 |ROCK FRICTION |Rough, irregular |Undulating |Planar |Smooth, slickensided |Clay, gouge-faulted |

| | | | | | | |

|4 |WATER/ICE |Dry |Some seepage |Moderate seepage |High seepage/ brush |High seepage with long |

| | | | | | |backslope/brush |

| | | | | | | |

|5 |ROCK FALL |No falls |Occasional minor falls |Occasional falls |Regular falls |Major falls/slides |

| | | | | | | |

|6 |BACKSLOPE ABOVE CUT |Flat to gentle slope |Moderate slope (15( - 25() |Steep slope |Very steep slope (>35() or |Very steep slope (>35( ) with |

| | |(up to 15 () | |(25( - 35() |steep slope (25( -35() with |boulders |

| | | | | |boulders | |

THE GEOLOGIC FACTOR (GF)

Physical conditions directly affect stability of a rock slope. GF is determined by summing the categories in Figure 2 numbered 1A or 1B and 2 through 6, and dividing by 10. Categories are assigned 1, 3, 9, 27, or 81 points. The rater selects only from these values -- no intermediate values may be used. Assigned 1 point to the best condition and up to 81 points to the worst. The categories are 1A. Geology (crystalline) or 1B. Geology (sedimentary), 2 Block Size, 3 Rock Friction, 4 Water/Ice, 5 Rockfall (history), and 6 Backslope Above Cut.

1A. Geology (Xtal. or crystalline)

Stability of rock slopes composed of hard, weathered, crystalline bedrock is determined mainly by the structure of discontinuities. Fractures may be natural features or result from past blasting effects. Joint orientations and inclinations must be considered in assessing rock slope stability. Rock slopes exhibiting mostly wedge-type failures and flat-lying or dipping into the slope should be rated 9. A slope with a prominent joint set dipping out of slope (toward the road) with average length of less than 10 ft. (3 m) should receive 27 points. Any slope with a prominent joint set or sets greater than 10 ft. (3 m) should receive 81 points. If a crystalline rock slope contains weak weathered zones causing unstable conditions, sedimentary rock categories (1B) may be more appropriate for rating.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|1A |GEOLOGY |Massive, no |Discontinuous |Fractures that form wedges |Discontinuous |Continuous fractures out of |

| |(Xtal.) |fractures dipping |fractures, random | |fractures dipping out |slope |

| | |out of slope |orientation | |of slope | |

Item 1B. Geology (Sed. or sedimentary)

Sedimentary rock slope stability is strongly influenced by rock type and bedding orientation. Slopes containing different stratigraphic layers may have differential weathering or erosional problems, leading to overhangs and unstable rock conditions within the slope. Steeply dipping beds in any orientation also may pose problems when joints and discontinuities are present. The rating for sedimentary rock slopes may be higher in points if structural conditions are considered. If structural features dominate slope stability, categories for crystalline rock slopes (1A) should be used.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|1B |GEOLOGY |Horizontal to |Raveling, occasional |Small overhangs or columns,|Overhangs, some large |Bedding or joints dipping out |

| |(Sed.) |slightly dipping |small blocks |numerous small blocks |unstable blocks, high |of slope, over- steepened cut |

| | | | | |columns |face |

2. Block Size

These categories should be estimated by maximum dimension of the largest unstable block on the slope, or the largest rocks in the ditch. Often a more massively bedded rock slope may receive a higher rating because of the potential for larger unstable blocks.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|2 |BLOCK SIZE |6 in. |6 in. to 12 in. |1 ft. to 2 ft. |2 ft. to 5 ft. |5 ft. or more |

| | |(150 mm) |(150 to 300 mm) |(0.3 to 0.6 m) |(0.6 m to 1.5 m) |(1.5 m or more) |

3. Rock Friction

This is estimated by roughness of the surface of bedding and joint planes. Rockfall potential may be greater for slickensided, clay-gouged, weathered rock, and mineralized surfaces such as biotite or serpentine layers. Potential failure surfaces should be carefully inspected because many of these features may not be readily apparent.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|3 |ROCK FRICTION |Rough, irregular |Undulating |Planar |Smooth, slickensided |Clay, gouge-faulted |

4. Water/Ice

This category may fluctuate daily or seasonally, making a rating decision difficult, and the slope should be examined with this variability in mind. Presence of ice and/or brush on the slope indicates a potential water problem. A long backslope will bring a large quantity of water to the slope even if none is apparent during inspection. A rock slope cut off and isolated on all sides from higher slopes will have few water problems.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|4 |WATER/ICE |Dry |Some seepage |Moderate seepage |High seepage/ brush |High seepage with long |

| | | | | | |backslope/brush |

5. Rockfall

This category covers the history of rockfalls at the site. The rater should review the rockfall history database currently maintained in the Engineering Geology Section's computer. Examination of the ditch will reveal past rockfalls if it has not been cleaned. Roadway and shoulder sections may also show evidence of rockfall damage. If maintenance personnel are present during the evaluation, they may provide useful historical information.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|5 |ROCK FALL |No falls |Occasional minor falls |Occasional falls |Regular falls |Major falls/slides |

6. Backslope Above Cut

This is a slope existing above a rock cut. It may be composed of bedrock, bedrock and soil, or soil and boulders. The backslope above the rock cut may contribute to rockfall potential. Even if no rock is on the backslope, water cascading down the surface may contribute to instability of the rock cut. The steeper the slope, the greater will be the potential for water and debris to fall down the rock cut face.

1 Point 3 Points 9 Points 27 Points 81 Points

| | | | | | | |

|6 |BACKSLOPE ABOVE CUT|Flat to gentle |Moderate slope (15( - |Steep slope |Very steep slope |Very steep slope (>35( ) with|

| | |slope |25() |(25( - 35() |(>35() or steep slope |boulders |

| | |(up to 15 () | | |(25( -35() with | |

| | | | | |boulders | |

THE SECTION FACTOR (SF)

The section factor is obtained using parameters measured in the field.

Slope Height

Vertical slope height should be measured from the pavement to the highest point on the rock slope from which rock is expected to fall. The highest point may be part of the cut face or the natural slope. Slope height can be determined using a range/height finder or a range finder in combination with a Brunton compass or inclinometer. Determine the angle to the top of the rock slope from the edge of roadway and the distance (angled distance) to top of slope (from the same point from which the angle was measured). Use these two values to calculate slope height as follows:

Slope Height = angled distance x sin (angle to top of rock slope) + instrument height

Instrument Height = height of a standing raters eye

For example (US Customary Units):

If the angle to top of the rock slope = 30(, the angled distance = 40 ft., and the instrument height = 5 ½ ft., the slope height (SH) is 25 ½ ft.

SH = (40 x sin 30() + 5.5 ft.

SH = (40 x 0.5) + 5.5

SH = 20 + 5.5 = 25.5 ft.

For example (International System of Units):

If the angle to top of the rock slope = 30(, the angled distance = 12 m, and the instrument height = 1.68 m, the slope height (SH) is 7.68 m.

SH = (12 m x sin 30() + 1.68 m

SH = (12 x 0.5) + 1.68

SH = 6 + 1.68 = 7.68 m.

Slope Angle

Existing slope angle can be measured using an inclinometer or Brunton compass. Some slopes have areas with near-vertical and/or near-horizontal sections. The rater should stand in the ditch and measure average overall slope inclination to determine slope angle. For an existing presplit slope, the instrument can be placed against several representative drill hole traces and the slope angle determined from the average of these measurements.

Ditch Width

This is measured from the toe of the slope to the pavement edge or shoulder edge where either exists.

It should be measured at the location of maximum slope height. If ditch width at the maximum height of cut exceeds average ditch width, average width should be recorded. Average ditch width should be determined by sighting down the length of the rock cut and approximating the distance from the average projected toe of slope to pavement edge or shoulder edge where either exists.

Ditch Depth

This may vary considerably along the length of the rock cut, as well as along the width of the ditch. It should be measured at the location of maximum slope height, from the pavement edge elevation to the ditch bottom about 3 ft. (1 m) out from the projected toe of slope. One way to measure this depth is to extend a tape from the pavement edge to the toe of slope, level the tape, and measure to the ditch bottom with a ruler. Another method is to use a hand level (or inclinometer) and measure a ruler placed at the pavement edge and again when placed at the ditch bottom. Subtracting these two readings will give ditch depth.

Ritchie Width and Ritchie Depth

First, determine slope height and overall slope angle. Based on those measurements, Ritchie width and depth can be determined using the Ritchie design chart:

[pic]

Figure 3a. Ritchie ditch criteria – Ditch Design Chart [Figure 12.10 from FHWA's

(US Customary Units) Rock Slopes manual1].

For example, for a 40 ft. high slope with a 3V/1H slope angle requires a ditch 17 ft. wide and 5 ft. deep ditch.

[pic]

Figure 3b. Ritchie ditch criteria – Ditch Design Chart [Figure 12.10 from FHWA's

(International System Rock Slopes manual1] converted by New York State D.O.T.

of Units)

For example, for a 12 m high slope with a 3V/1H slope angle requires a 5.1 m wide, 1.5 m deep ditch.

THE HUMAN EXPOSURE FACTOR (HEF)

Several field measurements are necessary to determine this factor.

Cut Length (L)

This is the measured length of the rock cut where a rockfall might occur that could reach the pavement. It may be determined using a measuring wheel or measuring tape.

Decision Sight Distance (DSD)

This is the length of roadway where a 6 in. (150 mm) sight distance target located on the roadway edge line first becomes visible to the approaching driver. Sight distance along a rock cut may vary considerably, due to curves (horizontal) and rises (vertical) as well as trees, road signs, and other objects. Referring to AASHTO standards3, a 6 in. (150 mm) sight distance target must be placed along the roadway edge line, and sighted from the center of the lane at an eye height of 3 ft. (1 m). DSD is the measured distance to the point where the object disappears from sight, and may be obtained using:

1. A 6 in. (150 mm) sight-distance target,

2. A 3 ft. (1 m) rod, and

3. A measuring wheel or measuring tape.

Target location may have to be adjusted and measurements taken at several points along the slope before minimum distance can be determined. This length and any factors limiting sight distance should be recorded. If sight distance is greater than 550 ft. (170 m) it need not be measured, but should be recorded as "greater than 550 ft. (170 m)" on the field form.

Number of Lanes

Total travel lanes in one direction adjacent to the rock slope should be recorded, including entrance ramps, exit ramps, and acceleration lanes, but not paved shoulders.

Stopping Sight Distance

The appropriate minimum adequate stopping sight distance can be determined from the NYSDOT Highway Design Manual2.

COMMON REMEDIAL TREATMENTS

The back of the site field evaluation sheet (Form GE 470 MET) lists typical rock slope problems and possible remediation treatments. Before any remedial measures can be determined for the rock slope, existing problems at the site must be understood. Mechanics of slope failure and treatment are thoroughly analyzed in the FHWA Rock Slopes1.

Remedies

Some common rock slope remediation treatments are listed on the field sheet. Determine the most appropriate treatment(s) based on sound engineering judgment. Sometimes a combination of two or more treatments may be necessary. For example, a rock slope may require a recut and a fence or barrier. A recut should be considered when a slope has a high SF or HEF. A scaling contract for a slope having these characteristics will not reduce these factors, and the scaled slope will still have a high relative risk. However, if a slope's high Total Relative Risk results mainly from a high GF, it may be a good candidate for scaling. Recutting this slope may reduce its Total Relative Risk little more than scaling. See Appendix C for guidelines on risk reduction.

After-Remediation Geologic Factors

The new GF can be estimated only after recommending treatment(s) for remediation. Based on the character of the new remediated rock slope, a new GF can be determined using the rating procedure. The new GF is the optimal GF that can be economically attained. For example, recutting a slope might reduce its block size and rockfall-potential categories, but might not affect the back slope above the cut.

Recutting

Once it has been decided that the appropriate remediation is to recut the slope, one must determine the recut angle, recommended setback, and estimated quantity to be removed.

Recut Angle

This should be designed at the steepest possible angle that will result in a stable, maintenance-free slope. A stable rock slope design may match the angle of major discontinuities or bedding surfaces. Use a Brunton compass to measure orientation of bedding, foliation, fractures, and joints. Consideration should be given to other factors that may affect the recut angle such as right-of-way, required sight distance, or constructability.

Recommended Setback

The setback of the re-designed slope should conform to the currently accepted standard. The plane of the new presplit slope should be located a minimum 5 ft. (1.5 m) behind the most recessed part of the existing slope to provide sufficient burden for effective presplit blasting.

Scaling

Scaling quantities should be the estimated amount of rock (cubic meters) expected to be removed, and not just the amount of loose rock on the slope. Removing a loose piece of rock may undermine the slope, requiring that the upper part of the slope be scaled farther back. If scaling with blasting is anticipated, this should be noted. Scaling volume can be roughly estimated using the following formula:

Surface area of existing rock cut face (ft2 (m2)) x weathering depth (ft. (m))

For example (US Customary Units):

Given a rock slope surface area 20 ft. high and 500 ft. long, with an estimated 3 ft. weathering depth (which is an appropriate weathering estimate for most rock slopes), the following scaling quantity is estimated:

20 ft. x 500 ft. = 10,000 ft2 surface area

10,000 ft2 x 3 ft. = 30,000 ft3 / 27 = 1111 yd3 volume.

For example (International System of Units):

Given a rock slope surface area 6 m high and 152 m long, with an estimated 1 m weathering depth (which is an appropriate weathering estimate for most rock slopes), the following scaling quantity is estimated:

6 m x 152 m = 912 m2 surface area

912 m2 x 1 m = 912 m3 volume.

Rock Bolting

This may be the sole treatment or may be used in combination with other remedial treatments. Blocks of unstable rock must be large enough to be bolted, and the rock slope composed of sufficiently competent rock to provide a suitable anchor. Rock bolts should be installed a minimum of 3 ft. (1 m) past the weathered zone or discontinuity into competent rock.

Mesh

A rock mesh screen may be considered for entire slopes, or only for areas containing numerous small (6 in. to 10 in. (150 to 250 mm) diameter) loose rocks, or where recutting or scaling is not feasible or may create right-of-way problems.

Fence

Rock fence installation may be considered for the top of slope, on a rock bench, or at the toe of slope. Design of optimal height and fence location can be aided by using the Colorado Rockfall/Simulation Program (CRSP)5, Oregon DOT Rockfall Program6, or other suitable rockfall programs. Accurate cross-sections are necessary for reliable results.

Barrier System

This may be the sole treatment or may be used in combination with other remedial measures. Barrier systems commonly considered are 1) an earth or broken-rock berm, 2) gabions, or 3) Jersey barrier or barriers with fence.

Estimating Recut Quantity

The recut estimate section on the field sheet (Form GE 470 MET) is for estimating the quantity of rock for the proposed slope recut, including the ditch section. This information can be used to determine rock removal volumes via computer programs.

Site Evaluation Field Sheet – US Customary Units

[pic]

Site Evaluation Field Sheet – US Customary Units

[pic]

Site Evaluation Field Sheet – International System of Units

[pic]

Site Evaluation Field Sheet – International System of Units

[pic]

GUIDELINES FOR DETERMINING RISK REDUCTION

Risk Reduction

It is assumed that "optimal" Risk Reduction may be achieved by 1) presplitting the rock slope at a properly designed angle, and 2) providing catchment in accordance with the accepted NYSDOT criteria. To determine "optimal" risk reduction, the section factor is set equal to 1, which represents equality with the currently accepted criteria. Typical rock slope remediation measures are presented here with a guideline for Risk Reduction.

Recut with Presplitting

Presplitting the rock slope usually results in greatest risk reduction. This is normally the preferred treatment for a hazardous rock slope with limited offset. Presplitting may potentially reduce risk values for all three factors -- GF, SF, and HEF. The GF may be reduced in the categories of geology, block size, rockfall, and backslope above the cut. The SF changes to reflect the new ditch dimensions of the "as-built" slope. Recutting the slope to meet currently accepted criteria makes SF equal to 1. The HEF may be reduced if there was formerly a sight-distance problem.

Rock Bolting

Areas of the rock slope may be stabilized by rock bolting to reduce the quantity of unstable material. Bolting may reduce the point values assigned to geology, block-size, rock-friction, and rockfall categories of the GF.

Rock Scaling

Scaling may be recommended for specific blocks or locations, or for an entire slope. Scaling may reduce the point values assigned to the GF categories: geology, block size, rockfall, and backslope above cut.

Mesh

Mesh may be recommended for rock slope remediation where small (< 2 ft. (0.6 m) diameter) blocks are raveling off the slope. Mesh may reduce point values in the GF categories of geology (sedimentary or crystalline with sedimentary characteristics) and block size.

Rock Catchment Fence

Rock catchment fences may be used on a slope, at its top, or at its toe. Depending on location, catchment fences may reduce the point values of GF category "backslope above cut" as well as the Section Factor (SF).

Risk Reduction Table

Table 1 shows Geologic Factor category reductions corresponding to specific remediation treatments.

TABLE 1. RISK REDUCTION

TREATMENTS:

P = RECUT WITH PRESPLITTING (Other than to improve the Section Factor)

B = ROCK BOLTING

S = ROCK SCALING

M = MESH

F = FENCE OR BARRIER

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 1A - GEOLOGY | | | | | |

|(Xtal.) | | | | | |

| | | | | | |

| |Massive, no |Discontinuous fractures, |Fractures that form |Discontinuous fractures|Continuous fractures dipping |

| |fractures dipping out |Random orientation |wedges |dipping out of slope |out of slope |

| |of slope. | | | | |

| | | | | | |

|TREATMENT | |B, S |B, S |B, S |B, S |

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 1B - GEOLOGY | | | | | |

|(Sed.) | | | | | |

| | | | | | |

| |Horizontal to slightly |Raveling, Occasional |Small overhangs or |Overhangs, Some large |Bedding or joints dipping out|

| |dipping. |small blocks. |columns, Numerous small |unstable blocks, High |of slope, Over steepened cut |

| | | |blocks. |columns |face |

| | | | | | |

|TREATMENT | |P, S, M |P, B, S, M |P, B, S |P, B, S |

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 2 – BLOCK SIZE | | | | | |

| |6 in. |6 in. to 12 in |1 ft. to 2 ft. |2 ft. to 5 ft. |5 ft. or more |

| |(150 mm) |(150 mm to 300 mm) |(0.3 m to 0.6 m) |(0.6 m to 1.5 m) |(1.5 m or more) |

| | | | | | |

|TREATMENT | |P, S, M |P, B, S, M |P, B, S |P, B, S |

| | | | | | |

|CATEGORY 3 - ROCK |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|FRICTION | | | | | |

| | | | | | |

| |Rough, |Undulating |Planar |Smooth, |Clay, gouge- |

| |Irregular | | |Slickensided |faulted |

| | | | | | |

|TREATMENT | |B |B |B | |

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 4 - WATER/ | | | | | |

|ICE | | | | | |

| | | | | | |

| |Dry |Some seepage |Moderate seepage |High seepage/brush |High seepage with long |

| | | | | |backslope/ |

| | | | | |brush |

| | | | | | |

|TREATMENT | |No change |No change |No change |No change |

| | | | | | |

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 5 - ROCK | | | | | |

|FALL | | | | | |

| | | | | | |

| |No Falls |Occasional |Occasional falls |Regular falls |Major falls/ slides |

| | |minor falls | | | |

| | | | | | |

|TREATMENT | |P, B, S, F |P, B, S, F |P, B, S,F |P, B, S, F |

| | | | | | |

| |1 POINT |3 POINTS |9 POINTS |27 POINTS |81 POINTS |

|CATEGORY 6 - BACKSLOPE | | | | | |

|ABOVE CUT | | | | | |

| | | | | | |

| |Flat to gentle slope |Moderate slope |Steep slope |Very steep (>35() or steep|Very steep (>35() slope with |

| |(up to 15() |(15(-25() |(25( - 35() |(25(-35() with boulders |boulders |

| | | | | | |

|TREATMENT | |P, F |P, F, S |P, F, S |P, F, S |

[pic]

[pic]

[pic]

[pic]

[pic]

[pic]

[pic]

................
................