87 99,ioo.oo 359 - Texas Department of Transportation

[Pages:59]March 30, 1955

Minutes of the Four Hundred and Seventy-Ninth Meeting, a Regular Meeting, of the State Highway Commission held i n the State Highway Building at Austin with the following members presents

E. H. Thornton, J r . Herbert C. Petry, J r . D. C. Greer

Chairman Member State Highway Engineer

377^3 37744

IT IS ORDERED that a Regular Meeting of the State mission be opened at 9:30 A.M., March 30, 1955.

An I n i t i a l construction appropriation of $10,594,770.00 i s herehy made f o r the construction of the following l i s t e d projects which have heen previously authorized.

COUNTY

PROJECT NO.

Travis, etc. C 114-2-17, etc.

HIGHWAY NO. U.S. 290, etc.

AMOUNT $ 133,500.00

Denton

C 135-10-9, etc.

St. 24, etc.

123,300.00

Dallas, etc. C 8-8-31, etc.

U.S. 80, etc.

249,400.00

Howard

C 68-7-6, etc.

Freestone

R 612-1-4

Travis, etc. R 1234-1-1, etc.

U.S. 87

F.M. 80 F.M. 1100

157,300.00 29,300.00

99,ioo.oo

Wheeler

Van Zandt, etc.

R 2051-1-1, etc. S 891(3)

F.M. 2167, etc. St. 110

149,200.00 124,800.00

Coleman

P 303(4), etc.

San P a t r i c i o , F 429(19), etc. etc.

Spur 284, etc.

St. 359

637,400.00 34,800.00

Travis

Live Oak, etc.

F 1068(8), etc. 8 1875(1)

U.S. 183, etc. F.M. 623

125,800.00 84,800.00

Frio

S 403(2)

Taylor

C 407-6-6

Concho, etc. C 35-2-15, etc.

Parmer, etc. C 52-1-14, etc.

F.M. 394 U.S. 277 U.S. 83, etc. U.S. 84, etc.

194,200.00 101,200.00 237,900.00 272,900.00

Denton Madison Jim Wells

C 81-3-14, etc. C 1223-2-1, etc. R 1470-1-2, etc.

U.S. 377 F.M. 2036, etc. F.M. 1540, etc.

22,700.00 104,800.00

52,200.00

(Continued on next page)

HZ

37744 Cor timied

COUNTY Ellis

PROJECT NO. C 92-3-17, etc.

Collin

c 135-2-17

Anderson

R 891-2-4

Bowie, etc. C 10-12-17, etc.

Mason

C 150-1-8

Ellis

C 48-4-20, etc.

Reeves, etc. C 3-5-15, etc.

Wilson

R 1009-2-3

Ellis

R 596-4-6, etc.

Harris

IN 1052(23)

Upshur

F 152(2), etc.

Nueces Travis

F 342(3) P 173(3), etc.

Jackson, etc. P 543(10)

Winkler, etc. S ll6o(2), etc.

Goliad

S 1939(1), etc.

Kent

S 490(2), etc.

Nacogdoches S ii64(4)

Galveston

C 307-5-7, etc.

Grimes

R 643-4-3

Parker

S 1533(2), etc.

Navarro

C 93-1-20, etc.

Washington C 114-9-13, etc.

Hidalgo

C 342-1-16

Brazoria Potter

C 847-3-7 R 2081-1-1

Jones

C 33-4-21

Bexar

M 15-V-9

Montgomery R 1986-1-3

March 30, 1955

HIGHWAY NO.

AMOGNT

U.S. 75

$ 94,400.00

St. 24

74,300.00

F.M. 323

96,000.00

U.S. 67, etc.

108,600.00

st. 29

128,600.00

U.S. 77

159,000.00

U.S. 80, etc.

270,900.00

F.M. 537

73,200.00

F.M. 878, etc.

71,500.00

St. 73

1,050,500.00

u.s. 271

370,900.00

U.S. 77

59,400.00

u.s. 290

173,800.00

U.S. 59

344,200.00

St. 82

383,600.00

F.M. 2043

79,200.00

F.M. 643, etc.

314,900.00

St. 7

86,800.00

St. 87

402,300.00

F.M. 244

94,400.00

F.M. 1707

221,500.00

U.S. 75

161,700.00

u.s. 290

112,400.00

st. 107

54,300.00

F.M. 521

283,800.00

F.M. 2176

103,300.00

G.S. 83

199,300.00

Resident Engineer's Office Building

3,300.00

F.M. 1314

5,o4o.oo

(Continued on next page)

HH

March 30, 1955

37744 Cor tinued - -

COUNTY

PROJECT NO.

HIGHWAY NO.

AMOUNT

Newton

R 1300-1-11

F.M. I4l4

$ 15,400.00

I

Dallam

M 4-K-7

Resident Engineer's Office Building

6,400.00

LaSalle

C 2022-2-2

F.M. 863

4,900.00

Cherokee

M 206-4-12

U.S. 79

21,000.00

Lee

M 334-3-6

F.M. 112

37,900.00

Howard

M 5-5-20

U.S. 80

38,200.00

Nolan

M 6-3-28

G.S. 80

37,700.00

Angelina Bexar

M 336-3-11 M 291-IO-16

St. 103 St. 16

3,500.00 34,000.00

Carson

M 275-2-10, etc.

U.S. 66

9,700.00

Ellis

M 48-3-23

U.S. 77

4,300.00

Fannin

M 174-3-18

St. 34

28,000.00

Galveston

M 500-1-31

U.S. 75

15,000.00

I

Harris

M 177-7-10

U.S. 59

3,500.00

Jefferson

M 307-1-46

st. 87

6,800.00

Madison

M 475-3-12

OSR

20,000.00

Morris

M 222-2-11, etc.

St. 11, etc.

4,300.00

Nacogdoches M 118-6-21

St. 21

5,100.00

Orange

M 28-14-6

U.S. 90

14,600.00

Polk

M 388-1-15

St. 146

3,200.00

Polk

M 177-1-23

U.S. 59

3,800.00

Roberts Titus

M I69-8-6 M 10-6-16

U.S. 60

u.s. 67

6,000.00 20,000.00

Wise

M 134-6-12

St. 24

9,900.00

Upshur

M 392-2-15

St. 26

64,500.00

I

Irion Gillespie

M 77-2-7 M 14-F-12

U.S. 67 At Fredericksburg

50,000.00 9,500.00

Lamar

M l-C-12

At Paris

5,000.00

Wichita

M 3-G-8

At Wichita F a l l s

12,200.00

(Continued on next page)

37744 Cor binned -- COUNTY Deaf Smith Hamilton Coryell Gillespie Aransas Aransas Leon Leon Dallas Dallas McCulloch Lampasas Cottle Motley Lamar Harris Erath Parker Somervell Briscoe Childress Wheeler Burleson Leon Leon Milam Washington Wichita Rusk Liberty

PROJECT NO. Authorization 13 M 9-Z-8 M 9-W-8 M 14-G-12 M 16-A-9 M 16-B-9 M 17-v-8 M 17-W-8 Authorization 13 M 18-U-9 M 23-T-5 M 23-U-5 M 25-R-5 M 25-K-5 M 688-2-12 M 508-1-17 M 79-4-15 M 8-3-23 M 385-5-12 M 541-1-5 M 31-5-9 M 275-13-18 M 186-3-12 M 205-3-12 M 166-4-19 M 204-7-13 M 114-9-16 M 544-1-6 M 545-2-5 M 28-3-33

March 30, 1955

HIGHWAY NO. At Glen Rio At Hamilton At Gatesville At Fredericksburg At Rockport At Rockport At Buffalo At Buffalo At Dallas At Dallas At Brady At Lampasas At Paducah At Matador F.M. 79 St ? 73

u.s. 67

U.S. 80 st . 144 s t . 256 U.S. 62, etc.

u.s. 66

st . 36 U.S. 79

u.s. 75

U.S. 79 u.s. 290 st . 258 st. 259 u.s. 90

AMOUNT $ 1,500.00

3,000.00 3,000.00 1,500.00 6,000.00 9,000.00 7,750.00 6,800.00 8,000.00 4,000.00 3,000.00 6,000.00 7,000.00 9,800.00 53,000.00 2,000.00 3,800.00

700.00 3,500.00 2,000.00 2,500.00 3,500.00 2,000.00 2,000.00 1,000.00 1,000.00 2,000.00 50,000.00 29,800.00 26,000.00

(Continued on next page)

37744 Cor tinued --

COUNTY

PROJECT NO.

Newton

M 305-1-11, etc.

Newton

M 305-2-12, etc.

Newton

M 214-3-4

Hardin

M 601-1-10

Hardin

M 200-9-20

Jasper

M 65-10-9

Jefferson

M 28-6-15

Liberty

M 177-3-16

Orange

M 28-11-46

Jasper

M 244-3-20

Cameron

M 331-3-3

Real

M 36-3-11

Dimmit

M 37-5-15

Real

M 36-6-7

Uvalde

M 36-7-IO, etc.

Val Verde

M 22-5-10

Val Verde

M 22-6-18

Val Verde

M 22-8-12

Val Verde

M 22-9-22, etc.

Zavala

M 276-3-8

Zavala

M 37-3-23

Liberty

M 593-1-12

Newton

R 1300-1-11

Nueces

M 326-1-10, etc.

Nueces

M 101-6-20

San Patricio M 180-6-13

San Patricio M 101-4-16

Freestone

M 456-1-8

Freestone

M 612-1-5

March 30, 1955

HIGHWAY NO.

St. 87 St. 87 St. 63 St. 326 U.S. 69 Loop 68 U.S. 90 U.S. 59

U.S. 90 U.S. 190 F.M. 1421

U.S. 83 U.S. 83 U.S. 83 U.S. 83

U.S. 90 U.S. 90 U.S. 90 U.S. 90

St. 76 U.S. 83

St. 321 F.M. 1414 St. 286 U.S. 181

St. 35

U.S. 181 F.M. 27 F.M. 80

(Continued on next page)

AMOUNT $ 12,000.00

12,000.00 11,000.00 30,000.00 6,000.00 8,000.00 22,400.00 30,000.00 21,500.00 40,000.00 12,200.00 19,900.00

3,600.00 22,500.00 82,000.00 35,000.00 20,300.00 32,000.00 36,000.00 41,000.00 18,700.00 30,130.00 15,400.00

5,400.00 2,000.00 1,900.00 9,000.00 5,500.00 16,500.00

Ul

yjjkh Continued -

COUNTY

PROJECT NO.

Freestone Freestone

M 456-3-3 M 426-2-2

Brazos Grimes

M 540-5-5 M 944-1-4

Grimes

M 1517-1-2

Nueces

M 102-1-17, etc.

Victoria

M 144-1-8, etc.

Bell

M 752-2-2, etc.

Rockwall

M 1015-2-3

McLennan

M 162-1-25

Cameron

M 39-9-16

Goliad

M 88-2-15

Karnes

M 348-3-12

San Patricio M 180-6-14

Brazoria

M 586-1-9

Cameron

M 1505-1-2

Frio

M 748-1-6

Haskell

M 982-2-5

Hidalgo

M 219-1-3

Hidalgo

M 219-2-2

Jefferson

M 932-2-7

Navarro Orange

M 995-1-5 M 689-2-7

Orange

M 883-2-8

Orange

M 883-2-9

Young

M 1711-1-4

Young

M 655-1-9

Llano

M 396-9-3

Wilson

M 15-U-10

March 30, 1955

HIGHWAY NO. F.M. 80 F.M. 489 F.M. 159 F.M. 362 F.M. 1748 St. 44 U.S. 87 F.M. 1237 F.M. 1139 U.S. 84 U.S. 77, etc. U.S. 59 St. 80 St. 35

F.M. l46o

F.M. 510 F.M. 140 F.M. 1081 F.M. 1016 F.M. 1016 F.M. 365 F.M. 637 F.M. 105 F.M. 105 F.M. 4o8 F.M. 1769 F.M. 61 F.M. 152 Floresville

(Continued on next page)

AMOUNT $ 6,000.00

15,000.00 28,000.00 42,000.00

6,700.00 30,000.00 48,000.00

400.00 1,700.00 5,000.00 26,100.00 1,000.00 2,000.00 5,000.00 7,700.00 6,400.00 30,600.00

7,4oo.oo

1,850.00 1,050.00 7,500.00 3,500.00 5,550.00 3,700.00 1,350.00 20,000.00 17,500.00 30,000.00

500.00

U9?>

March 30, 1955

37741+ cor tinned.

COUNTY

PROJECT NO.

HIGHWAY NO.

AMOUNT

Wichita

Authorization 13

At Wichita F a l l s $ 7,000.00

Throckmorton M 3-1-8

Throckmorton

14,000.00

Throckmorton M 3-J-8

Throckmorton

3,300.00

Winkler Winkler

M 6-Q-8 M 6-R-8

Kermit Kermit

6,300.00 1,500.00

San Patricio M 16-C-9

Mathis

2,800.00

San Patricio M 16-D-9

Mathis

3,450.00

Aransas

M 16-E-9

Rockport

3,000.00

McCulloch

M 23-T-5

Brady

1,800.00

Cottle

M 25-8-5

Paducah

24,000.00

Bexar

M 613-1-6

8t. 346

16,700.00

Blanco

M 113-3-7, etc.

G.S. 290

24,000.00

Brazoria

M 178-3-27

St. 35

61,000.00

Brown

M 127-4-8

G.S. 183

23,000.00

Calhoun Collin

M 180-1-18 M 280-2-15

St. 35 st. 78

12,000.00 38,600.00

Haskell

M 106-7-8

u.s. 380

10,000.00

Howard

M 693-1-8

s t . 350

4,400.00

Hunt

M 202-5-11

u.s. 69

12,000.00

Hunt Mitchell

M 203-1-9 M 5-7-14

u.s. 69 U.S. 80

16,000.00 5,000.00

Morris

M 83-10-9

St. 11

31,500.00

Potter

M 41-5-16

G.S. 87

11,200.00

Titus Wehh

M 83-9-H M 37-9-8, etc.

St. 11 U.S. 83

4,700.00 22,800.00

TOTAL

$10,594,770.00

State Funds chargeable for a l l projects designated as "R" or "RV" projects or marked with an Asterisk (*) are to be charged to the "Farm to Market Road Fund Account", from S.B. 28?.

^

March3C, 1955

The following agreements supplemental to contracts previously approved and entered into having teen examined and tbe terms and conditions having been found satisfactory, and i t appearing tbat an additiona l appropriation w i i i not be required, are hereby approved:

FAF^BCCUNTyonFAF^TCMABEFTBCAD17C7, projectS1533(2), Spencer Construction Company, inc., contractors, provides for adding 52 linear feet of CorrugatedCalvanizedMetaiFipe, DesignSize 2, to tbe contract at the agreed price of $3-65 per linear foot; estimated i n crease i n project cost $189.8C.

BCBFBTSCCUNTy onSTATFB1CBWAy7C, project S1212(1C), Frost Construction Company, contractors, provides for additional surface rubbing on approximateiy 3,251.5 square feet of exposed faces of curbs at the agreed price of 10 1 ^ per square foot; estimated increase i n project cost $34i.4i.

DAWSON, MABTiNANOBOWAF^^ ARB 2212,projectsC1749-1-2,B2064-2-i,B2091-1-1,Vl642-1-2 and B 2064-3-1, Ernest loyd, contractor,provides for tbe substitution of 1504 cubic yards of Type A, Orade 3 Aggregate for a l i k e quantity of Type A, Crade i Aggregate sbown on tbe o r i g i n a l pians for the two course surface treatment at the agreed price of $4.65 per cubic yard for Aggregate (Type A, 0rade3), which i s tbe same as the contract price for Aggregate ( T y p e A , O r a d e l ) ; no changein project cost.

STEBilNOANDOOKECOONTIESonO. S. HIOBWAy 67,project F 563(3), Cage Brothers, contractors, provides for substituting 27,155 gaiions of BC-2 Asphait for a l i k e quantity of OA-175 Aspbait sbown on the o r i g i n a l pians for the one course surface treatment at tbe agreed price of 14.3^ per gaiion for the BC-2 Asphait, wbicb i s tbe same as contract price on OA-175 Asphalt; no changein project cost.

TOM OFEENCOONTyonFAF^ TO MABi^FT BOAD 2064, projectS1130 ( l ) , W. 1. Barnes, contractor, provides for substituting 2i,96C gaiions of MC-1 Asphait for a l i k e quantity of Fmuisified Asphalt-BVMS sbown on the original pians for base preservative at tbe agreed price of i4 1^2^ per gaiion for MC-i Asphait, wbicb i s 1^2^ per gaiion iess tban the contract price on the Fmuisified Asphait-BVMS; estimated reduction i n project cost $109.60.

MITCBEIhCOONTyonO. S. BlOBWAy 60, project iW 525(4), C i i vin-Terriii, inc., contractors,provides for substituting cuhic yards of Type A Crade 5 Aggregate for the 695 cubic yards of Type A Crade3Aggregateoriginaiiy specified for the one coursesurface treatment of shoulders and the substitution of 66 cubic yards of Type A Crade 5 Aggregate to be stockpiled for tbe 77 cubic yards of Type A Crade3Aggregate (Stockpiled) sbown on the o r i g i n a l pians; tbe agreed prices of $5.00 per cubic yard for Type A Crade 5 Aggregate and $4.25 per cubic yard for TypeACrade 5Aggregate (Stockpiled) aretbesame as contract prices; estimated reduction i n project cost $551.75.

TAyiOBOOONTy on ABIIENEAiBFOBCE BASE ACCESS BOAD, project 0-AO 9(2), J . B. Fanning, contractor, provides for enlarging the higbway f a c i l i t y from the two-iane design as sbown on tbe original pians to a four-ianetraveiwaytbroughincreasedquantitiesof contract items, a i i work to be performed at contract prices, estimated increase i n project cost $i6,3C5.C3.

BABBISOOONTyonO. S. BlOBWAy 59, p r o j e c t F 5i4(i6), Ouif B i t u l i t h i c Company and F. M. Beeves and Sons of Austin, contractors, provides for adding tbe item of "42" Fipe Sewers (over 9^ depth)", to

(Continued on next page)

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download