24-Hour Slice of Day
AUGUST 31, 2022
24-Hour Slice of Day
LSE Showing Flexibility
Public
Resource Showing Flexibility
Storage resources can discharge in any hour
? Assuming sufficient excess capacity during the 24-hour period to meet the charging needs of storage resources, LSEs have discretion to allocate energy storage discharge in the LSE's 24-hr slice-of-day showing.
LSEs have flexibility in showing generation (or discharge) from uselimited resources
? Within a resource's operating or contractual restraints (e.g., generate 5 hours per day, unspecified when), LSEs have discretion to allocate generation in any hour of the 24-hour showing.
Storage can charge from co-located energy only generation
? 24-hr showing should count generation from energy-only (e.g., intermittent renewable) generation for co-located hybrid storage resources in determining sufficient excess capacity for storage resources.
2 Public
Example 24-Hour Slice of Day LSE Showing
Example LSE RA Portfolio
Resource
Shown NQC MW
Duration
Available Hours
Geothermal 100
Hydro
200
Thermal
400
Biomass
15
Solar
400
Wind
300
DR
50
Storage 1
100
Storage 2
50
24
24
24
24
24
24
24
24
24
24
24
24
5
16-21
4
24
4
24
N.B. Generation portfolio and load shape are illustrative but not meant to represent the position of any specific LSE
3 Public
Representing LSE RA Portfolios in the 24-Hr Showing
Resource Type Dispatchable Resources Solar and Wind Resources
Storage Resources
Use-limited Resources
RA Showing Characteristic
Capacity shown to maximum capability of the resource in each hour
Capacity shown to maximum generation shape in each hour as determined using an exceedance methodology Generation available up to maximum discharge capacity and duration, provided sufficient excess capacity to charge.
LSE has discretion to allocate hours of storage discharge up to maximum capability of the resource, continuously or non-continuously Capacity shown to maximum capability of the resource within use limitations (e.g., operating hours, maximum daily run time)
4 Public
Thank you
John Newton Principal Regulatory Analyst jnewton@ (510) 641-0807
5 Public
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- dd licensed 24 hour residential setting medicaid pay oregon
- instructions for 24 hour urine collection dallas nephrology associates
- o reilly s low voc brake cleaner 14 oz
- certified auto repair 24 month 24 000 mile nationwide limited repair
- o reilly automotive inc reports fourth quarter and full year 2021 results
- protective supervision 24 hours a day coverage plan
- 24 hour residential programs and settings for children and oregon
- instructions for 24 hour urine collection university of rochester
- laboratory services instructions for 24 hour urine collection
- material safety data sheet lead acid battery wet filled with acid