LTI Power Systems
ProUPS CONFIGURATION SHEET
AC INPUT
|Nominal Voltage (AC) |600V, 480V, 400V, 380V, 208V, or _____ V |
|Input Range (%) |+10%/-15% w/o discharging battery |
|Phase |3 Ø |
|Wire |3 wire |
|Frequency (Hz) | 60Hz or 50Hz |
|Fault Current Protection | 25kA or 65kA |
DC INPUT
|Nominal Bus Voltage |120V (60 cells lead acid/96 cells NiCad) |
| |240V (120 cells lead acid/192 cells NiCad) |
| |360V (180 cells lead acid/288 cells NiCad) |
| |480V (240 cells lead acid/384 cells NiCad) |
| |_____ V ( ___ cells ________) |
|Battery Type | 20 year Wet (Lead Acid) |
| |20 year Valve Regulated (Lead Acid) |
| |10 year Valve Regulated (Lead Acid) |
| |20 year Nickel Cadmium (NiCad) |
| |Other ____________________________ |
|Float Voltage | 2.25 Volts per cell (Lead Acid Batteries) |
| |1.45 Volts per cell (NiCad Batteries) |
|Equalize Voltage | 2.33 Volts per cell (Lead Acid Batteries) |
| |1.50 Volts per cell (NiCad Batteries) |
|Battery End Voltage | 1.75 Volts per cell (Lead Acid Batteries) |
| |1.09 Volts per cell (NiCad Batteries) |
|Fault Current Protection |10kA – 120VDC Bus and 25kA 240VDC and above |
AC OUTPUT
|KVA Rating of Inverter |_____KVA |
|Load Power Factor | 0.8 or 1.0 |
|AC Output Voltage |120V, 220V, 230V, 240V, 120/208V, |
| |277/480V, 347/600V or ____/____ V |
|Phase | SingleØ 2-wire, SingleØ 3-wire, ThreeØ 4-wire |
|Frequency (Hz) | 60Hz or 50Hz |
|Fault Current Protection | 25kA or 65kA |
BYPASS INPUT
|Input Voltage |_____KVA |
|Phase | SingleØ 2-wire, SingleØ 3-wire, ThreeØ 4-wire |
|Fault Current Protection | 25kA or 65kA |
ProUPS CONFIGURATION SHEET
INTERNAL SYSTEM OPTIONS
| |
|Conformal Coating of PCBs |
|Enclosure Gasketing |
|Ground Fault Detector |
|Copper Ground Bus |
|Heat Shrink Tubing on Wire Labels |
|Cold Start – Enables DC startups |
|Circuit Breaker Status Panel |
|Blocking Diode |
|Lockable Circuit Breaker Shrouds |
|Lockable Enclosure Door Latches |
|Terminal Block Covers |
|Load Test Terminal Block |
|EPO – Emergency Power Off |
|Phenolic Nameplates |
EXTERNAL/BALANCE OF SYSTEM OPTIONS
| |
|Bypass Isolation Transformer: _____KVA, Pri. Voltage______, Sec. Voltage______ |
|Electrostatic Shield Copper Windings K-Factor Rating _______ |
|Maintenance Bypass Switch – Remote wall-mounted rotary switch |
|Two Position Three Position Auxiliary Contacts |
|Maintenance Bypass Switch – Remote wall-mounted 3-breaker style switch |
|Auxiliary Contacts |
|DC Disconnect Breaker – Remote wall-mounted |
|Shunt Trip Pad Lockable Auxiliary Contacts Nema 3R |
|Spare Parts Kit – Level I Startup Spares |
|Spare Parts Kit – Level II Emergency Spares |
|Spare Parts Kit – Level III Depot Spares |
|Touch Up Paint |
|10yr VRLA Battery Plant - _____ Minutes of Runtime |
|20yr VRLA Battery Plant - _____ Minutes of Runtime |
|20yr Flooded Battery Plant - _____ Minutes of Runtime |
|20yr NiCad Battery Plant - _____ Minutes of Runtime |
SERVICE OPTIONS
| |
|Start-up and Familiarization |
|Factory Acceptance Testing |
|Factory Training |
|Preventative Maintenance |
|Yearly Bi-yearly Quarterly |
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- why are crm systems important
- economic systems examples
- crm systems comparison
- crm systems definition
- customer relationship management systems pdf
- customer management systems florida
- power systems analysis pdf grainger
- electrical power systems international
- power systems engineer job description
- power systems electrical engineer
- power systems engineering inc
- high power dc power supplies