L C C L - NCDOT
NORMAL OUTSIDE SHOULDER SLOPES
ROADWAY
CL
E.O.P. UP TO 10'
UNPAVED SHOULDER
EDGE OF TRAVEL LANE
-0.08
EDGE OF TRAVEL LANE
UP TO 10' SHOULDER 2' & 4' PAVED E.O.P.
-0.08
NOTE: ON LOW SIDE OF SUPERELEVATED PAVEMENT USE NORMAL SHOULDER SLOPE UNLESS NORMAL SHOULDER SLOPE IS FLATTER THAN SUPERELEVATION, THEN USE SUPERELEVATION RATE ON SHOULDER.
NOTE: "ROLL-OVER" ALGEBRAIC DIFFERENCE IN RATES OF CROSS SLOPE NOT TO EXCEED 0.06 AS SHOWN. IF SUPERELEVATION IS REVOLVED ABOUT CENTER LINE OF PAVEMENT, SAME APPLIES. ON DIVIDED ROADWAYS, GRADE POINT TO BE AT THE MEDIAN EDGE OF TRAVEL LANE.
RALEIGH, N.C.
DIVISION OF HIGHWAYS
NORTH CAROLINA
STATE OF
NORMAL MEDIAN SHOULDER SLOPES
ROADWAY
CL
EDGE OF TRAVEL LANE
GRADE POINT (4 LANE)
UP TO 10' SHOULDER 2' & 4' PAVED E.O.P. -0.04
1-18
EDGE OF TRAVEL LANE
GRADE POINT (4 LANE)
UP TO 10' SHOULDER 2' & 4' PAVED E.O.P. -0.08
CONDITION #1: EDGE OF TRAVEL LANE FOR UNPAVED SHOULDER
CONDITION #2: EDGE OF TRAVEL LANE FOR 2' & 4' PAVED SHOULDER
E.O.P.
UP TO 10'-0" SHOULDER 2' & 4' PAVED
UP TO 10'-0" UNPAVED SHOULDERS
+0.04 MAX. PER FT. OF SUPERELEVATION +0.03
SUPERELEVATION
ROADWAY
FT.
CL+0.10
FT.
PER
+0.09 +0.08
+0.07
+0.06
+0.05
+0.04
+0.03
+0.02
+0.01 0.00
-0.01 -0.02
+0.02
+0.01
0.00
-0.01
-0.02 -0.03 -0.04 -0.05 -0.06 -0.07 -0.08
SHEET1OF 1
560.01
ROADWAY STANDARD DRAWING FOR
METHOD OF SHOULDER CONSTRUCTION
HIGH SIDE OF SUPERELEVATED CURVE METHOD I (SHOULDERS UP TO 10')
DEPT. OF TRANSPORTATION
NORMAL OUTSIDE SHOULDER SLOPES
ROADWAY
CL
EDGE OF TRAVEL LANE
10' SHOULDER & ABOVE 2' & 4' PAVED
E.O.P. -0.08
NOTE: ON LOW SIDE OF SUPERELEVATED PAVEMENT USE NORMAL SHOULDER SLOPE UNLESS NORMAL SHOULDER SLOPE IS FLATTER THAN SUPERELEVATION, THEN USE SUPERELEVATION RATE ON SHOULDER.
NOTE: "ROLL-OVER" ALGEBRAIC DIFFERENCE IN RATES OF CROSS SLOPE NOT TO EXCEED 0.06 AS SHOWN. IF SUPERELEVATION IS REVOLVED ABOUT CENTER LINE OF PAVEMENT, SAME APPLIES. ON DIVIDED ROADWAYS, GRADE POINT TO BE AT THE MEDIAN EDGE OF INSIDE TRAVEL LANE.
RALEIGH, N.C.
DIVISION OF HIGHWAYS
NORTH CAROLINA
STATE OF
NORMAL MEDIAN SHOULDER SLOPES
ROADWAY
CL
EDGE OF TRAVEL LANE
GRADE POINT (4 LANE)
10' SHOULDER & ABOVE 2' & 4' PAVED E.O.P. -0.04
EDGE OF TRAVEL LANE
GRADE POINT (4 LANE)
10' SHOULDER & ABOVE 2' & 4' PAVED E.O.P. -0.08
1-18
EDGE OF TRAVEL LANE
10'-0" SHOULDER AND ABOVE (2' & 4' PAVED)
E.O.P. 2' & 4' PAVED
+0.04
+0.03
SUPERELEVATION
ROADWAY
FT.
CL+0.10
FT.
PER
+0.09 +0.08
+0.07
+0.06
+0.05
+0.04
+0.03
+0.02
+0.01 0.00
-0.01 -0.02
+0.02
+0.01
0.00
-0.01
-0.02
-0.03
E.O.P.
-0.04
-0.05 -0.06 -0.07 -0.08
SHEET1OF 2
560.02
ROADWAY STANDARD DRAWING FOR
METHOD OF SHOULDER CONSTRUCTION
HIGH SIDE OF SUPERELEVATED CURVE METHOD II (SHOULDERS 10' AND ABOVE)
DEPT. OF TRANSPORTATION
NORMAL OUTSIDE SHOULDER SLOPES
ROADWAY
CL
SHOULDER WIDTH PAVED SHOULDER
EDGE OF TRAVEL LANE NC
-0.04
NOTE: ON LOW SIDE OF SUPERELEVATED PAVEMENT USE NORMAL SHOULDER SLOPE UNLESS NORMAL SHOULDER SLOPE IS FLATTER THAN SUPERELEVATION, THEN USE SUPERELEVATION RATE ON SHOULDER.
NOTE: "ROLL-OVER" ALGEBRAIC DIFFERENCE IN RATES OF CROSS SLOPE NOT TO EXCEED 0.06 AS SHOWN. IF SUPERELEVATION IS REVOLVED ABOUT CENTER LINE OF PAVEMENT, SAME APPLIES. ON DIVIDED ROADWAYS, GRADE POINT TO BE AT THE MEDIAN EDGE OF TRAVEL LANE.
PAVED SHOULDERS
TRAVEL LANE SUPERELEVATION
RATE
*SHOULDER
SUBGRADE SLOPE
-0.02 -0.01
0.00 +0.01 +0.02 +0.03 +0.04 +0.05 +0.06 +0.07 +0.08 +0.09 +0.10
-0.02 -0.02 -0.02 -0.02 -0.02 -0.01
0.00 +0.01 +0.02 +0.03 +0.04 +0.05 +0.06
*SHOULDER SUBGRADE SLOPE SAME AS
FINISHED SHOULDER SLOPE WHEN USING THROUGH LANE PAVEMENT ON SHOULDERS
RALEIGH, N.C.
DIVISION OF HIGHWAYS
NORTH CAROLINA
STATE OF
NORMAL MEDIAN SHOULDER SLOPES
ROADWAY
CL
EDGE OF TRAVEL LANE
GRADE POINT (4 OR MORE LANES)
NC
SHOULDER WIDTH PAVED SHOULDER
-0.04
1-18
EDGE OF TRAVEL LANE
GRADE POINT (4 LANES)
NC
SHOULDER WIDTH PAVED SHOULDER
-0.04
ROADWAY STANDARD DRAWING FOR
METHOD OF SHOULDER CONSTRUCTION
HIGH SIDE OF SUPERELEVATED CURVE METHOD II (ASHPALT & CONCRETE SHOULDER)
EDGE OF TRAVEL LANE
ROADWAY
CL
+0.10
SUPERELEVATION+ +0 0. .0 09 8 +0.07 +0.06 +0.05 +0.04 +0.03
+0.02
+0.01
0.00 -0.01 -0.02
SHOULDER WIDTH PAVED SHOULDER
+0.04 +0.03 +0.02 +0.01 0.00 -0.01 -0.02 -0.03 -0.04
-0.04 -0.04 -0.04 -0.04
-0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04 -0.04
SUPERELEVATION RATE (SEE CHART)
FINISHED SHOULDER SLOPES ( SEE CHFAORRT SUBGRADE SLOPES)
SHEET2OF 2
560.02
DEPT. OF TRANSPORTATION
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- ljduhwwh krohvdohuv 1 0 5 66 7 67 3
- physics 100a homework 4 chapter 5 newton s first law a
- 760 720 640 600 6 8 0 0 88408809209601000 8 9 7 5 60 0 8
- lou malnati s g pepperoni 132 6 340 20 8 0 40 560 26 0 3
- 2 1 2 0 5 a
- chapters 6 8 review
- engine technologies for nonroad tier 3 and tier 4
- department of revenue wh1603 withholding tax tables
- nand nor implementation digital logic design eee 241
- deep depth tji 360 560 and 560d joist installation guide