Cisco NCS 560-4 Router Hardware Installation Guide

Cisco NCS 560-4 Router Hardware Installation Guide

First Published: 2019-05-24 Last Modified: 2023-02-16

Americas Headquarters

Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA Tel: 408 526-4000

800 553-NETS (6387) Fax: 408 527-0883

? 2019?2023 Cisco Systems, Inc. All rights reserved.

CONTENTS

CHAPTER 1 CHAPTER 2

Cisco NCS 560-4 Router Overview 1 Cisco NCS 560-4 Router Features 1 System Specifications 3 Cisco NCS 560-4 Router Conformal Coating 4 Fan Trays 4 Interface Modules 9 Digital Optical Monitoring 12 RSP Modules (N560-4-RSP4 and N560-4-RSP4E) 13 GNSS Module (A900-CM-GNSS) 14 Power Supply 15 Network Timing Interfaces 19 Online Insertion and Removal 19 Regulatory Compliance 21

Preparing for Installation 23 Safety Guidelines 23 Standard Warning Statements 23 Safety Guidelines for Personal Safety and Equipment Protection 25 Safety With Electricity 25 Power Supply Considerations 29 Preventing ESD Damage 29 Site Planning 30 General Precautions 30 Site Planning Checklist 30 Site Selection Guidelines 31 Environmental Requirements 31

Cisco NCS 560-4 Router Hardware Installation Guide iii

Contents

CHAPTER 3

Physical Characteristics 31 Assembly Guidelines 31 Air Flow Guidelines 31 Air Flow Guidelines for Enclosed Rack Installation 33 Floor Loading Considerations 33 Site Power Guidelines 34 Electrical Circuit Requirements 35 Site Cabling Guidelines 35 Asynchronous Terminal Connections 36 Interference Considerations 36 Rack-Mounting Guidelines 37 Precautions for Rack-Mounting 37 Rack Selection Guidelines 37 Cabinet Selection Guidelines 38 Equipment Rack Guidelines 39 Rack Compatibility 40 Rack Types 40 Installation Checklist 42 Creating a Site Log 43 Receiving the Cisco NCS 560-4 Router 43 Chassis-Lifting Guidelines 45 Tools and Equipment 45 Unpack and Verify Shipped Contents 46

Installing the Cisco NCS 560-4 Router 49 Prerequisites 49 Installing the Router in a Rack 49 Assembling the Plenum (N560-4-F2B-AIR-U=) 52 Installing the Plenum on the Rack When Router is Not Installed on the Rack 55 Installing the Plenum on the Rack When Router is Installed on the Rack 62 Installing the Cisco NCS 560 Router Vertically 65 Attaching the Cable Management Brackets 72 Installing the Chassis Ground Connection 73 Installing the Power Supply 75

Cisco NCS 560-4 Router Hardware Installation Guide iv

Contents

Preventing Power Loss 76 Power Connection Guidelines 77 Guidelines for DC-Powered Systems 77 Guidelines for AC-Powered Systems 78 Installing the N560-PWR1200-D-E DC Power Supply Module 78 Installing the A900-PWR1200-D DC Power Supply Module 80 Activating the DC Power Supply 82 Removing and Replacing the DC Power Supply 82 Installing the AC Power Supply Module for A900-PWR1200-A (1200 W) 84

Recommended Power Cables 85 Activating the AC Power Supply 85 Removing and Replacing the AC Power Supply 86 Installing the Fan Trays 87 Removing and Replacing the Dust Filter 89 Dust Filter Maintenance 90 Removing and Replacing the Fan Trays 90 RSP Installation 92 Installing an RSP Module 92 Removing an RSP Module 94 Removing the IM Center Brackets 95 Interface Module Installation 96 Installing an Interface Module 97 Removing an Interface Module 98 Hot-Swapping an RSP or Interface Module 98 Installing Dust Caps 99 Securing the Cables Around the Cable Management Brackets 99 Connecting the Router to the Network 101 Connecting Console Cables 101 Connecting to the Serial Port using Microsoft Windows 101 Connecting to the Console Port using Mac OS X 103 Connecting to the Console Port using Linux 104 Installing the Cisco Microsoft Windows USB Device Driver 104 Installing the Cisco Microsoft Windows XP USB Driver 105 Installing the Cisco Microsoft Windows 2000 USB Driver 105

Cisco NCS 560-4 Router Hardware Installation Guide v

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download