%684% %684% Page 1 of 2 --Project Name Item Number Unit (f) Quantity ...
%684% %684% Opened --Project Name
(VersionID/Aksas/Ref. Std. ID)-----15 Listed
Item Number Description (f)
2009 10
2009 10
2010 04
2009 10
2009 10
2009 10
2009 10
2009 10
2009 10
2009 10
2009 10
2016 09
2010 06
2010 09
Ketchikan Viaducts Rehab 684(1)
(22692)
Basic Continuity Check
4 Bids Tendered
Ketchikan Viaducts Rehab 684(1)
(22692/68571/0)
Basic Continuity Check
4 Bids Tendered
KTN Water Street
684(2)
Sidewalk (26238/69345/0) Establish Continuity
3 Bids Tendered
Ketchikan Viaducts Rehab 684(2)
(22692/68571/0)
Girder End Continuity
4 Bids Tendered
Ketchikan Viaducts Rehab 684(3)
(22692/68571/0)
Establish Continuity
4 Bids Tendered
Ketchikan Viaducts Rehab 684(4)
(22692/68571/0)
Install Structure
4 Bids Tendered
Negative Connections
Ketchikan Viaducts Rehab 684(5)
(22692/68571/0)
Reference Electrodes
4 Bids Tendered
Ketchikan Viaducts Rehab 684(6)
(22692/68571/0)
Main Junction Box
4 Bids Tendered
Ketchikan Viaducts Rehab 684(7)
(22692/68571/0)
Install Primary Anode
4 Bids Tendered
Terminal Plates
Ketchikan Viaducts Rehab 684(8)
(22692/68571/0)
Rewire Tongass Ave.
4 Bids Tendered
and Water St.
Bent/Spans
Ketchikan Viaducts Rehab 684(8)
(22692)
Rewire Tongass Ave.
4 Bids Tendered
and Water St.
Bent/Spans
Homer Beluga Float Plane P-684a
Facilities Improvements Floating Silt Curtain
(46154//4922)
7 Bids Tendered
Kipnuk Airport Relocation - P-684a
Phase II
Floating Silt Curtain
(28834/57796/4922)
5 Bids Tendered
Lake Hood Seaplane Base P-684a
Lake Hood Bank
Floating Silt Curtain
Stabilization
(31333/50920/4922)
8 Bids Tendered
Unit (f)
Lump Sum (Alt) Lump Sum Each
Each
Each
Each
Each
Each
Each
Lump Sum
Lump Sum (Alt) Linear Foot
Linear Foot
Linear Foot
Quantity (f)
Eng Est
Min Bid Low Bidder % of Bid
1.0
20,000.00
30,500.00 20,000.00
Avg Bid 2nd Low Bidder % of Bid
217,500.00
180,000.00
Page 1 of 2
Project
Max
Low Bid
Bid Amount (f)
3rd
Low
Bidder
% of
Bid
600,000.00 600,000.00
7,484,600
0.49%
0.27%
2.01%
3.00%
1
20,000.00 217,500.00 600,000.00
7,484,600
30,500.00 20,000.00 180,000.00 600,000.00
0.49%
0.27%
2.01%
3.00%
175
75.00 126.33 154.00 1,752,375
600.00 75.00 150.00 154.00
5.11% 0.75% 1.31% 1.04%
85
200.00 2,750.00 8,000.00 7,484,600
380.00 1,000.00 1,800.00 8,000.00
0.51% 1.14% 1.71% 3.40%
400
100.00 306.25 600.00 7,484,600
312.00 100.00 225.00 600.00
1.99% 0.53% 1.00% 1.20%
300
500.00 925.00 1,500.00 7,484,600
312.00 1,000.00 500.00 1,500.00
1.49% 4.01% 1.67% 2.25%
13
5,000.00 8,000.00 15,000.00 7,484,600
6,500.00 15,000.00 5,000.00 5,000.00
1.35% 2.61% 0.73% 0.33%
109
500.00 1,300.00 1,800.00 7,484,600
400.00 500.00 1,400.00 1,500.00
0.69% 0.73% 1.70% 0.82%
210
720.00 1,030.00 1,500.00 7,484,600
310.00 1,500.00 900.00 1,000.00
1.04% 4.21% 2.11% 1.05%
1
140,000.00 628,750.00 1,825,000.00
7,484,600
256,080.00 250,000.00 140,000.00 1,825,000.00
4.08%
3.34%
1.56%
9.13%
1.0
140,000.00 628,750.00 1,825,000.00
256,080.00 250,000.00 140,000.00 1,825,000.00
4.08%
3.34%
1.56%
9.13%
7,484,600
450
20.00 44.71 75.00
100.00 40.00 50.00 20.00
1.92% 1.03% 1.11% 0.42%
1,754,971
250
50.00 71.20 100.00 13,477,354
100.00 56.00 50.00 100.00
0.14% 0.10% 0.08% 0.15%
825
30.00 86.94 180.00
100.00 46.50 59.00 180.00
3.85% 1.82% 1.89% 5.58%
2,111,536
%684% %684% Opened --Project Name
(VersionID/Aksas/Ref. Std. ID)-----15 Listed
Item Number Description (f)
2012 06
2014 05
2012 09
Unalaska Airport Improvements 2012 (38122/53443/0) 5 Bids Tendered Kodiak Airport RSA Extension & Devils Creek Culvert Repair (42772/53587 57474/4922) 3 Bids Tendered Kotzebue Airport And Safety Area Improvements - Stage I I I (38453/63851/0) 3 Bids Tendered
P-684a Floating Silt Curtain
P-684a Floating Silt Curtain
P-684a.n1 Floating Silt Curtain
Page 2 of 2
Unit (f) Quantity Eng
Project
(f)
Est Min Avg Max
Low Bid
Bid Bid Bid Amount (f)
Low 2nd 3rd
Bidder Low Low
% of Bidder Bidder
Bid % of % of
Bid Bid
Linear Foot
2,300
160.00 1.38%
17.00 55.00 0.64%
42.40 40.00 0.46%
60.00 17.00 0.19%
19,645,356
Linear Foot
4,100
70.00 50.00 100.00 0.38% 0.70%
81.67 70.00 0.48%
100.00 75.00 0.47%
58,222,248
Linear Foot
4,000
50.00 0.63%
25.00 50.00 0.65%
45.00 25.00 0.32%
60.00 60.00 0.76%
30,931,995
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- tsm for u s transportation department of major
- answers and solutions to section 2 1 homework problems s f ellermeyer
- installation instructions pressure balancing valve as newport brass
- chapter684 684 14 relationtoelectronicsignatures 1 voidabletransactions
- section 684 layer 2 field hardened ethernet switch
- scope of work provisions for electrician inside wireman all shifts
- multiplying decimals big ideas learning
- item quantity s684 sentry series electric restaurant range
- dead end clamps aluma form inc
- guidelines for voluntary use of the ship energy efficiency gmn
Related searches
- amazon item number search
- 1 of 2 page numbering
- 1 or 2 number generator
- 1 to 2 number generator
- 1 through 2 number generator
- 1 12 2 item generator
- 1 or 2 912 912 1 0 0 0 1 example of present tense
- 1 or 2 577 577 1 0 0 0 1 example of epic story
- 1 or 2 606 606 1 0 0 0 1 example of present tense
- 1 or 2 869 869 1 0 0 0 1 example of epic story
- 1 or 2 169 169 1 0 0 0 1 example of epic story
- 1 or 2 142 142 1 0 0 0 1 example of present tense