1



Position Held : Pavement cum Material Engineer

Name of Firm : Euroestudios S.L.

Name of Staff : Ajay Kumar Dixit

Profession : Civil Engineering

Date of birth : 30.03.1967

Nationality : Indian

Membership of Professional Societies : Indian Roads Congress, India

Mobile No. : 09470359153, 09431373609, 09771434494, 09434344799

Detailed Task Assigned:

o Development Phase

• Review all soil and material investigations and pavement design submission;

• Setting up of various procedures for quality control and testing;

• Oversee setting up of a material testing laboratory and calibration of testing equipment;

• Assist in the review of pavement design;

• Review and approve material sources, mix designs etc;

• Review construction methodologies and control test specifications;

o Construction Phase

• Monitor quality assurance and quality control tests;

• Inspection and supervision of all layers of pavement construction;

• Solving pavement related technical and construction issues;

• Intervene to ensure correct application of modern pavement construction technology and materials;

o O&M Phase

• Attend to any material issues related to maintenance activities;

Key Qualifications :

Mr. A. K. Dixit is a Graduate Civil Engineer having 19 years of professional experience in the field of highways for project management, construction supervision, quality assurance programs and plans, quality control of material and contract execution of major roads, highways and bridges involving strengthening, widening, rehabilitation works for flexible and rigid pavements. He has worked as Quality cum Material Engineer on a number of construction supervision and maintenance supervision projects of National Highways/State Highways including projects funded by Asian Development Bank & World Bank under FIDIC conditions of contract and codal Specifications of IRC, MOST, BIS, ASTM and other relevant specifications. Has extensive experience in testing of construction materials to ensure quality control of work at different stages of construction as per specification of contracts, reviewed test results of bore holes, quarry and borrow area, established / assisted laboratory set up, supervised the setting up of bituminous mixing plant. During his various assignments, he has specialize in field and laboratory testing of construction materials, review of bituminous and concrete mix designs and laying procedure, preparation of quality manuals, inspection and approval of all material sources like borrow areas for soil, quarries of aggregates, quality of materials according to the acceptance criteria on the basis of IRC / MORTH specifications. He has good communication skills both written and oral. He has vast knowledge and understanding of “present modern highway construction techniques with modern equipments” for construction supervision projects of large infrastructure projects.

Some of my Relevant Projects are:

o Consultancy Services for Rehabilitation and Upgradation of Existing 2-lane to 4-lane of 250 Kms for Package-III in the state of Madhya Pradesh and Uttar Pradesh Civil Works. (ADB LOAN – 2029-IND).

o Construction Supervision for 4-laning of 78.75 Kms of barwadda to gorhar of V – C Package on NH-2 between km. 320.00 to km. 398+750. (World Bank Funded)

o Widening to 4-Lane And Rehabilitation of Existing 2-Lane carriage of Pune –Satara (NH-4) from (Km797.000 to Km 825.500), Package –III under NHAI, Under FIDIC conditions of contract.

o 4-laning of Andhra Pradesh State Highways Project of Consultancy Service for Construction Supervision of widening, strengthening and rehabilitation (under World Bank loan assistance).

o Bihar Plateau Development Project (World Bank Funded).

o Construction of Rural Roads and Bridges at Lapung under Bihar Plateau Development Project (World Band Funded).

o Strengthening and widening of Ranchi Airport runway.

o Construction of earthwork for canal under Sardar Sarovar Narmada Nigam Limited, Ahmedabad in canal work

Education:

• B.E. (Civil) from Bangalore University, in 1995

• M-Tech (Transportations), from KSOU,in 2013

EMPLOYMENT RECORD:

From Jan, 2014 to till date

Position: Pavement cum Material Engineer

Employer: Euroestudioes S.L.

Project: Consultancy Services Construction Supervision of Improvement of roads in Uttarakhand under USRIP-Project 3, Funded by ADB, CSC-4, Project Length 180.215 Km. road in district Dehradun and Uttarkashi,Project Cost:

INR 165 crores,Client:PWD,Uttarakhand.

From Jan, 2012 to Dec,2013

Position: Senior Quality cum Material Expert

Employer: URS Scott Wilson India Pvt. Ltd.

Project: Four-Laning of Farakka-Raiganj section of NH -34 from Km 295.00 to Km 398.000 in the State of West Bengal on Design, Build, Finance, Operate and Transfer (The “DBFOT”) toll basis under NHDP–III. Project Cost: INR 1200 crores, Client: NHAI.

From Jan, 2010 to Jan, 2012

Position: Senior Quality cum Material Engineer, Jan.2010 to March 2010 worked as Resident Engineer

Employer: MSV International Inc.

Project: Improvement works of Ranchi Ring Road(section III Ch. Km.0.600 to ch. Km.13.350 and Section IV Ch. Km. 0.000 to Ch.6.335) (19.685Km) package ID RRR-I & ( section V Ch- Km. 0.000 to Ch. Km. 10.007 & Section VI ch. Km. 0.000 to Ch. Km. 7.100)(17.107 Km.) Package ID: RRR-II of INR 477.00 Crores funded by JRPICL on PPP basis.

Client: IL & FS (JRPICL)

From Nov2008 to Dec.2009

Position: Pavement cum Material Engineer

Employer:Egis-Bceom consulting india(p)ltd

Project: Uttrakhand state Road improvement Programme(USRIP)-Phase-01 consultancy services for construction supervision.Funded by ADB under PWD(Uttrakhand)of project cost of INR 45Crores.

Responsible for the quality control of construction materials and implementation of quality assurance plan for the field and laboratory testing on all embankments, sub-base, base for the pavement, concrete and asphalt mix. Responsible for the quality assurance and the construction standards related to the pavement structures, Pavement Design. Checking and approval of Quality Assurance plan, procedures, Quarries for Rock, Soil, and GSB etc. Mix design for Concrete, GSB, WMM and Bituminous Works. Routine testing for all the works. Setup of Laboratory. Interaction and correspondence with Client, Contractor, Suppliers and External agencies. Checking and approval of QC records and matching with requirement of the contract.

From December 2005 to Oct.2008

Position: Material /Pavement Engineer

Employer: Renardet S.A.

Project: Consultancy Services for Rehabilitation and Upgradation of Existing 2-lane to 4-lane of 250 Kms for Package-III in the state of Madhya Pradesh and Uttar Pradesh Civil Works. (ADB LOAN – 2029-IND) Cost of Project: INR 1260 Crores, Client: NHAI

Responsible for the quality control of construction materials and implementation of quality assurance plan for the field and laboratory testing on all embankments, sub-base, base for the pavement, concrete and asphalt mix. Responsible for the quality assurance and the construction standards related to the pavement structures, Pavement Design. Checking and approval of Quality Assurance plan, procedures, Quarries for Rock, Soil, and GSB etc. Mix design for Concrete, GSB, WMM and Bituminous Works. Routine testing for all the works. Setup of Laboratory. Interaction and correspondence with Client, Contractor, Suppliers and External agencies. Checking and approval of QC records and matching with requirement of the contract

From July 2002 to December 2005

Position: Field Engineer (Roads)

Employer: SMEC International Pty. Ltd. New Delhi

Project: Construction Supervision for 4-laning of Barwadda to Gorhar of V – C Package on NH-2 between km. 320.00 to km. 398+750. (World Bank Funded) Project Length: 78.75 Km, Project Cost: INR 420 crores, Client: NHAI.

Construction of earthwork, which includes testing of field densities, proper alignment of road, keeping records of total number of layer laid at different chainages as per line, grades, side slopes of uniform thickness 200mm compacted, omc measured & within limits (+ 1% above & 2% below omc ). Compaction tests performed on each layer. Finishing operations-formation- surface tolerances +20mm to –25mm for both embankment cut, fill & sub grade. On preparation of sub grade as of three layers of 200mm, 150mm, &150mm, vegetation &extraneous matter removed, surface watered & rolled with two passes of smooth drum roller. On prepared sub grade Geotextile fabric placed ensuring no folds & wrinkles, corrected overlap of 1.00mt longitudinally & 30cm transversally. On prepared sub grade (laid Geotextile) Granular material is laid in two layers of 150mm each which is tested, approved & is free of organic & other deleterious matter & gradation as per specifications. GSB should be completed, compacted surface closed, free from movement under compaction equipment, cracks & loose material & no segregation there. After finished, surface irregularity under 3mt straight edge should be checked as max 8mm & horizontal alignment of +- 25mm. On prepared GSB, WMM material is laid in two layers of 125mm each & controlled by depth blocks & as per drawing. Max dry density should be 98%.On prepared WMM layer, prime coat is done by sprayer of rate 6-8 kg/10m2 or as per design & it should be dry for min. 24 hrs, then a tack coat is sprayed at the rate of 2.5 to 3.5 kg/10m2 as per design & DBM of 100mm each of two layers are laid. Temperature of mix at completion of rolling should be minimum of 100c.At the time of laying it should be 120c to 160c. At last 40mm bituminous concrete is laid as per drawing

Responsible for formulation and establishing quality assurance plan and system / programmer and ensuring its implementation in the fieldwork, Geo-technical investigations, collection of samples according to specifications, review and acceptance of quarry sites, borrow areas, inspection and quality control of materials, soil, aggregates, bitumen. Responsible for quality production of WMM material from WMM plant, DBM/BM mix from hot mix plant with approved materials and composition of layers. Inspect layout of centerline, layout of curves, alignment, level and profile. Review / establish relevant asphalt mix design of DBM/ BM/ BC mix, ensuring works are executed as per contract specifications.

Also responsible for assistance in setting up of field laboratory for carrying out field and laboratory tests and maintaining record of test results, calibration of contractor’s equipments and also monitoring, construction Methodology. Inspect works, workmanship, materials, material sources at various stages of work related to highway i.e. sub-grade, GSB, WMM, DBM, BC. Attend field & laboratory tests conducted by Contractor & conduct independent tests.

From June 2000 to June 2002

Position: Field Engineer (Roads)

Employer: Span consultants Pvt. Ltd.

Project: Widening to 4-Lanes and Rehabilitation of Existing Two Lane carriage of Pune –Satara (NH-4) from (Km797.000 to Km 825.500), Package –III under NHAI, Under FIDIC conditions of contract Project Length: 28.500 Km. Project Cost: INR 90 crores, Client: NHAI.

Includes the proper alignment of road, keeping records of total number of layers laid in different chainages. Testing of fields’ density at each layer of filling earth. Dumping & Dozing Gradation, taking moisture content, if W>OMC, it is dried and compact till tolerance limit as W=OMC (+2%), if W ................
................

In order to avoid copyright disputes, this page is only a partial summary.