Supplier.huntingtoningalls.com



GENERAL ARCHITECTURAL ANDMULTI-DISCIPLINE ENGINEERING SERVICESSTATEMENT OF WORK=================FURNISH ALL MATERIAL, LABOR, SUPERVISION AND EQUIPMENT NECESSARY TO PROVIDE ENGINEERING SERVICES FOR VARIOUS DESIGN PROJECTS FOR NEWPORT NEWS SHIPBUILDING. THESE SERVICES COULD INCLUDE THE PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS, RESEARCH FOR ENGINEERING STUDIES OR OTHER SERVICES OFFERED BY THE ENGINEERING FIRM AND SPECIFIED IN THE OUTLINE AGREEMENT RELEASE.THE DESCRIPTION OF WORK REQUESTED WILL BE ISSUED ON EACH SEPARATE RELEASE.ALL PRELIMINARY DRAWINGS SUBMITTED WILL BE FORMATTED IN A MANNER SUCH THAT THEY CAN BE USED DURING THE FINAL DESIGN PHASE OF THAT PROJECT. ALL DRAWINGS SUBMITTED WILL BE IN ACCORDANCE WITH PLANT ENGINEERING CAD REQUIREMENTS. COPIES OF ALL CALCULATIONS WILL BE SUBMITTED TO NEWPORT NEWS SHIPBUILDING. ENGINEERING DRAWING/SKETCHES AND PROJECT MANUALS (SPECIFICATIONS) WILL BE ASSEMBLED IN A CONCISE DOCUMENT.ENGINEERING STUDIESNNS UTILIZES ENGINEERING STUDIES TO IDENTIFY, EVALUATE, AND SELECT ALTERNATIVE MEANS OF ACCOMPLISHING DESIGN/CONSTRUCTION WORK TO SUPPORT THE COMPANY’S INITIATIVES. ENGINEERING STUDIES ARE USED BY THE OWNER TO FINALIZE A COMPREHENSIVE PROJECT PLAN AND MUST ADDRESS SCOPE, BUDGET, AND SCHEDULE REQUIREMENTS OF THE POTENTIAL PROJECT. ENGINEERING STUDIES SHALL INCLUDE THE FOLLOWING:· EXECUTIVE SUMMARY.· EXECUTIVE OVERVIEW ON POWERPOINT SLIDES.· NARRATIVE DISCUSSING PROJECT SCOPE, MAJOR ASSUMPTIONS, DESIGN BASIS, LIFE CYCLE CONSIDERATIONS, ALTERNATIVES EVALUATED, PROJECT RISK, GOVERNING CODES/STANDARDS AND REGULATIONS, UNIQUE ACCEPTANCE TESTING AND/OR QUALITY DETERMINATION CRITERIA AND RECOMMENDATIONS.· MS PROJECT IMPLEMENTATION SCHEDULE FOR ACCOMPLISHING THE IDENTIFIED SCOPE OF WORK FROM INITIAL PROJECT FUNDING TO COMMISSIONING AND THROUGH FINAL CLOSEOUT, UNLESS OTHERWISE NOTED. SCHEDULE SHALL INCLUDE MAJOR TASKS/MILESTONES SUCH AS PROJECT FUNDING, DESIGN CONTRACT AWARD, ENGINEERING, PERIODIC DESIGN REVIEWS (25%, 50%, 75%, 90%, UNLESS OTHERWISE NOTED), FINAL (100%) ENGINEERING SUBMITTAL, BID, CONSTRUCTION CONTRACT AWARD, MOBILIZATION, FIELD WORK, SUBMITTAL REVIEWS, LONG LEAD MATERIAL PROCUREMENT, CONSTRUCTION, START-UP, ACCEPTANCE TESTING, IN-SERVICE DATE, AS-BUILT DRAWINGS PREPARATION, PREVENTATIVE MAINTENANCE (PMS) PROCEDURE DEVELOPMENT, FINAL DOCUMENTATION SUBMITTAL, TRAINING, SPARE PARTS PROCUREMENT, PROJECT CLOSEOUT, ETC.· ROUGH-ORDER-MAGNITUDE (ROM) COST ESTIMATE INCLUDING MATERIAL, LABOR, EQUIPMENT, OVERHEAD, SPARES, CONTINGENCY, ETC.· PROJECTED CASHFLOW FOR THE PROJECT.· CONCEPTUAL DRAWING(S) SHOWING GENERAL ARRANGEMENT, ELEVATIONS, PROCESS FLOW, ETC.· APPENDICES INCLUDING PERTINENT DATA SUCH AS CALCULATIONS, VENDOR CATALOG SHEETS, PHOTOGRAPHS, BACKGROUND INFORMATION, CORRESPONDENCE, MEETING MINUTES, ETC.ENGINEERING STUDIES SHALL BE PREPARED UTILIZING MS OFFICE SOFTWARE (WORD, EXCEL, PROJECT, ACCESS, POWERPOINT) WITH THE EXCEPTION OF CONCEPTUAL DRAWINGS THAT SHALL BE PREPARED IN AUTOCAD. THE OWNER SHALL BE PROVIDED WITH FOUR (4) BOUND HARDCOPIES AND AN ELECTRONIC VERSION OF THE DOCUMENTS. THE FINAL ENGINEERING STUDY DELIVERABLE SHALL BE REVIEWED FOR APPROVAL AND SO NOTED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF VIRGINIA. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download