a. Project A has average risk and a return of 9.5 percent. b. Project C has above-average risk and a return of 10.5 percent. c. Project B has below-average risk and a return of 8.5 percent. d. Project A and C should be accepted. e. None of the projects above should be accepted. Project A, 9.5 ................
................