Baltimore City Department of Transportation F.A.P. NO. STP ...

[Pages:6]Baltimore City Department of Transportation

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

TABLE OF CONTENTS

A. Website Description The Baltimore City Department of Transportation (BCDOT) will be providing RFQ and RFP documents to perspective design-build teams through the City's website which can be accessed via this URL , by visiting the Department of Transportation page on the City's website and then clicking "Projects" followed by "Central Avenue Design-Build" or by clicking here.

For clarity the information provided by the City will be in several folders and subfolders. Section B below outlines the main folders and Section C below that details each folder's data. The date refers to when it was added to the website. Except for information provided under "2. Project Contract Documents", the information provided is for informational purposes below and BCDOT is not providing any warranty or guarantee on the contents. Project updates, perspective bidder questions and BCDOT responses, etc will be provided in "2. Project Contract Documents" as well. More data may be added during the RFP phase.

B. Website Folders

1. City/State Design Standards 2. Project Contract Documents 3. CADD files 4. NEPA and Non-SWM Permits 5. Utility Records, Old Plan, Inspection Reports etc. 6. Futures and Concurrent Designs by others 7. Subsurface Explorations Test Holes 8. Project Design Documents and Studies 9. Stormwater/Erosion Control Check lists, Forms, and Permits, Etc. 10. Bridge Inspections 11. Others

C. Website Documents

Friday, 21 March 2014 Page No. 1

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

Baltimore City Department of Transportation

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

No. File Name

1. City State and Fed Design Standards Description

Date

Notes

1 ADDENDUM - RED LINE REVISION

BCDOT Addendum, Red Line and Green Line standards.

STANDARDS.doc

2 BCDOT Bridge Checklist.PDF

3 Checklist for Landscape Plans.doc

4 Checklist for Plans_Aug 2011.pdf

5 Federal Aid Process for Design Projects.doc

6 FINAL DB Policy BOE Approved.pdf

Project to be compliant with this document

7 LED Sole Source Cobra Heads and Shoe Boxes.pdf

8 Lighting Design Guide.pdf

9 Lighting Requirements.doc

10 storm drain checklist.pdf

11 Street Light Energization Process.pdf

12 Submission Packages.doc

13 Traffic Signal Design Checklist.docx

14 Traffic Signal Design Guidance.docx

15 Utility Legend.pdf

BCDOT drafting standards

01/10/14

01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14

BCDOT will not generally provide State/Federal Standards. Click here for some commonly referenced Maryland State Highway Administration's (SHA's) standards and specifications.

Friday, 21 March 2014 Page No. 2

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

Baltimore City Department of Transportation

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

2. Project Contract Document

No. File Name

Description

Date

Notes

1 Central Avenue Phase II Draft Plans -NOT FOR

PROJECT Related ? Draft Plans. For RFQ phase only. Final

01/10/14

CONSTRUCTION.pdf

revised version will be provided to DB teams on the RCL.

2 Central Avenue Phase II Draft RFP - NOT FOR PROJECT Related ? Draft RFP. For RFQ phase only. Final revised 01/10/14

CONSTRUCTION.pdf

version will be provided to DB teams on the RCL

3 CENTRAL AVENIUE II DB DESIGN BUILD RFQ PROJECT Related - RFQ

01/10/14

FINAL 1 14 14.pdf

4 RFQ Blank Forms

RFQ Forms that need to be filled out

03/21/14 Revised per

Addendum 1

5 100%Submission.pdf

Newly added Sanitary work in the process of being integrated

01/14/14

6 TR12317 Central Ave II Design RFQ Phase Perspective bidder questions and City responses. Subject to 3/21/2014 File added after

Questions and Responses 2014 March 21.pdf

updates.

RFQ release

7 Addendum 1 TR12317.pdf

Notes four modifications

3/20/2104 File added after

RFQ release

8 BOE Meetings & Protests Resolution(1.22.14).pdf Baltimore City Board of Estimates policy effective 2/5/2014

3/21/2014 File added after

RFQ release

No. File Name Are not being provided during the RFQ phase

3. CADD Files Description

Date

Notes

Friday, 21 March 2014 Page No. 3

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

Baltimore City Department of Transportation

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

No. File Name 1 31576_Central Ave-PhII Phase I ESA Update-

FINAL.pdf 2 CAC Letter - Central Avenue.pdf 3 Central Avenue Phase II Re-eval 11.7.2013.pdf 4 CentralPhase II_DNRERP_response_7-27-12.pdf 5 CentralPhase II_DNRWHS_response_7-19-12.pdf 6 CentralPhase II_MHT_response_8-10-12.pdf 7 Trilogy July 2012.pdf

4. NEPA and Non-SWM Permits Description PROJECT related

Does not address the new bridge NEPA recert ? does not include the bridge

No. File Name 1 By RKK 7-1-03 (Folder) 2 Plans 3052 (Folder) 3 Plans 2750 (Folder) 4 1001 fleet st cooling tower drainage line.pdf 5 DA# 0815.pdf 6 Existing Bridge Plans_pt 1.pdf 7 Existing Bridge Plans_pt 2.pdf 8 Telephone Data.pdf 9 TR99037 (caroline st only).pdf 10 Verizon AA Pix.docx

5. Utility Records, Old Plans, Reports Description Project was bid but never awarded. Veolia related

At Aliceanna Street, shows shallow installation depth

Date

Notes

01/10/14

01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14

Date 01/10/14 01/10/14 01/10/14

01/10/14 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14

Notes

Friday, 21 March 2014 Page No. 4

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

Baltimore City Department of Transportation

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

6. Futures and Concurrent Designs By others

No. File Name

Description

1 TR08310 Central Ave Phase 1 Contract Docs (Folder)

Currently under construction, plans, specs, and addendum

2 2013-02-06-SPRC 2nd Submittal.zip

Private development at Fleet Street and Central Avenue

3 constrn@rkk com_20120801_130432.pdf

Harbor Point development related

Please see MTA regarding their proposed "Red Line" project.

Date 01/10/14 01/10/14 01/14/2014

Notes

7. Subsurface Explorations Test Holes

No. File Name

Description

1 BORINGS (Folder)

2 Central Ave Limited Phase II Subsurface Investigation for BCDOT Addendum, Red Line and Green Line standards.

Contaminated Soil and Groundwater.pdf

3 Test Hole Request_10-17-2012.pdf

PROJECT Related

4 Test Holes Survey Dec 12.PDF

PROJECT Related

5 Veolia Test Holes.pdf

Date

01/10/14

01/10/14 01/10/14 01/10/14

Notes

No. File Name 1 Cent Ave Phase II ESA FINAL 12-20-2013 A.pdf 2 Central Avenue Phase II Design Report.pdf

8. Project Design Documents and Studies Description PROJECT Phase II ESA Repprt PROJECT TS&L Study

Date 1/14/14 1/14/14

Notes

Friday, 21 March 2014 Page No. 5

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

Baltimore City Department of Transportation

CENTRAL AVENUE STREETSCAPE AND HARBOR POINT CONNECTOR BRIDGE (DESIGN-BUILD)

F.A.P. NO. STP-3057(6)N S.H.A. NO. BC-410005

BALTIMORE CITY NO. TR12317

9. Stormwater, Erosion Control list, Forms, and Permits

No. File Name

Description

1 SWM (Folder)

Various checklists and requirements.

2 DPW DOT SWM MOU Nov 12.pdf

Important agreement between BCDOT and DPW

3 E&S CHKLIST.DOC

4 ESD Summary Tables0001.pdf

BCDOT Addendum, Red Line and Green Line standards.

5 Instructions for NPDES Summary Form.doc

6 NPDES Form 2012.pdf

Date 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14

Notes

No. File Name 1 BC 1255.pdf 2 BC 1555.pdf 3 BC 8018.pdf 4 BC 8019.pdf 5 BC 8020.pdf

10. Bridge Inspections Description 2009 - Box cells between Aliceanna and Fleet Street 2009 - Box cells between Aliceanna and Lancaster Street 2009 - Lancaster Street Bridge 2009 ? Aliceanna Street Bridge 2009 ? Fleet Street Bridge

Date 01/10/14 01/10/14 01/10/14 01/10/14 01/10/14

Notes

No. File Name Intentionally blank.

11. Other Description

Date

Notes

Friday, 21 March 2014 Page No. 6

File = "TR12317 Central Ave II Design Build Website 2014 3 21.pdf"

................
................

In order to avoid copyright disputes, this page is only a partial summary.