STORMWATER MANAGEMENT / EROSION & SEDIMENT …
STORMWATER MANAGEMENT / EROSION & SEDIMENT CONTROL CONCEPT PHASE- DESIGN PLAN CHECKLISTThe reasons for this check list are:To guide the designer with developing a concept level design drawings. To guide the Baltimore City SWM/ESC Plans Review Section reviewers in their review. PROJECT NAME:PROJECT ADDRESS:LEGEND FOR REVIEW CHECKLISTDesigner’s Submittal (D):C – CompleteNA – Not ApplicableReviewer’s Response (R):Y - AcceptableInc- IncompleteN- Not AcceptableR – Required, Not SubmittedRDContent DescriptionDrainage Area Map Sheet No. View area = min. 100 ft outside project and 100 ft downstream of outfall (preferred scale: 1” = 200’)Limit of disturbance (LOD), denote areas exempt from SWM requirementsDrainage area(s) limit and point(s) of dischargeTitle block(1)General plan items (2)Existing Conditions Plan Sheet ography with maximum two foot contoursExisting natural featuresWater, streams, wetlands, wetland buffers and other sensitive resourcesDrainage patterns to each design pointBuildings, roads, parking, and all other impervious areaExisting underground utilities (within 100 ft adjacent peripheral strip.)Highly erodible soils (Kf > 0.35)Bedrock outcropsSteep Slopes (> 15%)100-year floodplain boundaryCritical Area boundaryTitle block(1)General plan items (2)Proposed Conditions Plan Sheet No. Gray / screened copy of Existing Conditions Plan Proposed grading contours (maximum 2 ft)Proposed buildings, roads, parking, and other impervious areaLimit of disturbance (LOD), denote areas exempt / waived from SWM Notes: LOD area, cut and fill volumesAll other proposed site featuresTitle block(1)General Plan Items (2)Conceptual SWM Plan(3) Sheet No.All items listed above for Proposed Conditions PlanStormwater management requirement summary tableStormwater management notesSoil types including hydrologic classificationsLocations of all BMPs and delineation of drainage areaLocations of all discharge points from site Title block(1)General plan items (2)NOTE:(1) Title block should include:project name and address, owners name and address, applicant’s name and address, and designer’s name, address and phone number(2) General Plan Items:vicinity map at 1” = 2,000’ scaleparcel number (W, S, B, L)scale and scale barnorth arrowlegendparcel boundary: distances and bearings (3) Conceptual Stormwater Management Plan may be combined with Proposed Conditions Plan, depending on complexity of plan. FOR CITY USE ONLYSWMD Reviewer Name (signature):SWMD Reviewer Name (print):(Date) ................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- stormwater management bmps
- stormwater management handbook
- stormwater management plan sample
- stormwater management plan template
- examples of stormwater management plans
- stormwater management plan
- stormwater management plan pdf
- epa stormwater management plan template
- colorado stormwater management plan template
- stormwater management conference 2020
- stormwater management training courses
- stormwater management systems