UMBC
UMBC
AN HONORS UNIVERSITY IN MARYLAND
REQUEST FOR PROPOSAL FOR
DESIGN/BUILD CONTRACTOR WITH GMP FOR THE
PATAPSCO HALL ADDITION PROJECT AT
THE UNIVERSITY OF MARYLAND, BALTIMORE COUNTY
RFP #BC-20632-T
ISSUED: OCTOBER 8, 2009
PRE-PROPOSAL MEETING:
Monday, October 19, 2009 at 3:00 p.m. Engineering Lecture Hall #5 University of Maryland, Baltimore County (See ) (Note: The site visit will be conducted in conjunction with this meeting.)
TECHNICAL PROPOSAL
Monday, November 2, 2009, on or before 4:00 p.m. UMBC PROCUREMENT OFFICE 1000 Hilltop Circle, Room 301- Administration Building Baltimore, Maryland 21250
PROCUREMENT/ISSUING OFFICE:
UMBC Procurement Office University of Maryland, Baltimore County 1000 Hilltop Circle, Room 301 Administration Building Baltimore, Maryland 21250
PROJECT MANAGEMENT:
UMBC Office of Facilities Management University of Maryland, Baltimore County
1000 Hilltop Circle Baltimore, Maryland 21250
NOTE: All Addenda to this procurement will be posted on the UMBC Procurement website. All potential proposers must notify the Procurement Office of their interest in order to be kept informed of any and all information regarding this procurement. Please contact Terry Cook via e-mail at tcook@umbc.edu and provide the Name of your firm, Address, Contact Person, Phone Number and E-mail Address.
Page 1
REQUEST FOR PROPOSAL FOR
DESIGN/BUILD CONTRACTOR WITH GMP FOR THE
PATAPSCO HALL ADDITION PROJECT AT THE UNIVERSITY OF MARYLAND, BALTIMORE COUNTY
RFP #BC-20632-T
TABLE OF CONTENTS
SECTION #
DESCRIPTION
00100
INSTRUCTIONS TO PROPOSERS
00200
INFORMATION AVAILABLE TO PROPOSERS
00300
PROPOSALS, EVALUATION AND FORMS
00400
SCOPE OF WORK
00500
UMB PROCEDURE MANUAL FOR PROFESSIONAL SERVICES ON DESIGN/BUILD PROJECTS DATED 2/99
00600
UMBC Project Program dated 10/4/09
00601
UMBC Project Specific Design Standards dated 10/2/09
00700
UMBC STANDARD GENERAL CONDITIONS FOR CONSTRUCTION MANAGEMENT WITH GMP DATED 10/15/97
00800
AMENDMENTS TO UMBC STANDARD GENERAL CONDITIONS DATED AUGUST 30, 2004.
00830
PREVAILING WAGE RATES (to be furnished by Addendum)
ATTACHMENT A
The following forms are to be submitted by each proposer as indicated in the RFP documents herein: -MBE Attachment A Form -MBE Attachment B Form -Bid/Proposal Affidavit -DB Team Organization Form -Working Relationships of DB Firms -Key Personnel Form -DBC Matrix of On Site Staff Hours -DBC Experience Form -AE Experience Form -DBC Annual Sales Volume/Number of Projects Form -DBC Current Workload Form -Acknowledgement of Receipt of Addenda Form (if applicable)
Page 2
TABLE OF CONTENTS - CONTINUED
SECTION #
DESCRIPTION
ATTACHMENT B: The following forms are to be submitted/signed by the successful firm:
University Contract Performance and Payment Bonds Contract Affidavit Form MBE Attachment C Form MBE Attachment D Form
ATTACHMENT C: General Conditions Listing for non-personnel items
ATTACHMENT D: University Shop Drawings/Submittal Flow Chart
ATTACHMENT E MBE Instructions
ATTACHMENT F Price Proposal Forms (To be furnished by Addendum)
ATTACHMENT G Maryland Board of Public Works Meeting Schedule for 2010.
ATTACHMENT H UMBC CAD Standards dated August 2005
Page 3
SECTION 00100
I. INSTRUCTIONS TO PROPOSERS SECTION 00100
I. INSTRUCTIONS TO PROPOSERS FOR THE DESIGN/BUILD WITH GMP CONTRACT
A. SUMMARY:
1. The University of Maryland, Baltimore County (herein referred to as University or UMBC) desires to contract with an experienced Design/Build Contractor (DBC) for the design and construction of a 190-bed addition to the Patapsco Residence Hall (Patapsco Addition Project) with some renovation work in the existing hall at University of Maryland, Baltimore County and as described in the RFP documents inclusive of the Project Program. The scope of work also includes two add alternates which are (1) the addition of an elevator at Susquehanna Hall and athletic courts and (2) a plaza and associated hardscape between Patapsco Hall Addition and Susquehanna Hall. The project will be designed & built under a guaranteed maximum price as fully set forth in Section 00400 of the RFP.
2. The objective of this Request For Proposal (RFP) to select a Design/Build Contractor (DBC) team o provide professional design, management and construction services for the design and the construction of the Patapsco Addition Project (Project) fully set forth in Section 00400 of the RFP, the Project Program (Section 00600) and Project Specific Design Standards (Section 00601).
3. The Design/Build with Guaranteed Maximum Price (D/B with GMP) contract centers on utilization of a Design/Build Contractor (DBC), who assembles and leads the Design/Build Team (DBT) consisting of the Design/Build Contractor, the Architect/Engineer, other consultants as required including, but not necessarily limited to, Mechanical/Electrical/Plumbing/Structural/Civil/Engineers, construction trade contractors (all under contract to or under the Design/Build Contractor) as well as University representatives.
During the Pre-Construction/Design Phase, the DBC will cause the production of required design documents by the Architect/Engineer under contract to the DBC and will utilize his skills and knowledge of construction to manage the design process and provide pre-construction services (i.e., develop schedules, prepare construction cost models/estimates, bid trade packages, etc.).
During the Construction Phase, the DBC will manage the A/E in his provision of services as well as provide construction services and manage the project (inclusive of the award and management of all trade contracts) throughout the construction phase.
(See Section 00400 for details in regard the DBC's with GMP`s scope of services.)
Page 4
4. The project will be an "open book" job whereby the University may attend any and all meetings, have access to any and all DBC records (whether DBC records or the records of those under contract to the DBC) on the project and whereby any and all cost savings revert to the University. The University will pay the DBC for (i) its fixed fees inclusive of all inclusive A/E fees for both preconstruction/design and construction services, (ii) approved, applicable reimbursable costs under the General Condition allowance (on site personnel and non-personnel items) for actual expenditures only without any DBC markup of any type, and (iii) construction trade work inclusive of approved change orders without any DBC mark-up of any type.
5. It will be the responsibility of the Design/Build Contractor to provide the necessary services/work which includes, but is not limited to, the following:
(a) Develop a complete Project design and provide all required A/E services in accordance with (i) RFP #BC-20632-T inclusive of the University Procedure Manual (Section 00500), UMBC Project Program dated 10/4/09 (Section 00600), UMBC Project Specific Design Standards dated 10/2/09 (Section 00601), and all applicable codes and regulations through the engagement of licensed professional A/E design firm(s) approved by UMBC;
(b) provide all design and construction services necessary to implement the goals of the project inclusive of, but not limited to, the following: architectural, civil, electrical, structural, mechanical design services, and any required specialty design consultants as required; construction services inclusive of scheduling; administration and management;
(c) oversee the complete design and construction processes;
(d) develop and maintain schedules;
(e) coordinate/communicate the activities of the Team throughout the design and construction processes; and,
(f) construct the project under the design/build contract method inclusive of all construction services therein within sixteen (16) months of the Notice to Proceed.
6. Procurement of the Design/Build Contractor will be a phased process as follows:
Phase 1:
Technical Proposal Submittal and corresponding evaluation.
Phase 2:
Oral Presentation/Interview by only those proposers who achieve the required minimum technical score. Following Orals, a Second Phase Technical evaluation is conducted
Phase 3:
Price Proposal Submittal by only those Proposers who maintain the required, minimum or better technical score in the Second Phase technical
Page 5
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.