PowerCo

72.5kV Maximum, 69kV Nominal Transmission Line

Locate in Cass County, Iowa

This line begins at the PowerCo’s Galveston Substation being the south terminus located in the northwest corner of the Southwest Quarter of Section One (1), T-76N, R-35W.

The line proceeds north and ends at the Cass-Audubon County lines and ultimately terminates at an interconnection with a PowerCo 69 kV transmission line in Section Thirty (30), T-78N, R-34W in Audubon County, Iowa.

Beginning at the PowerCo Galveston Substation being located in the northwest corner of the Southwest Quarter of Section One (1), T-76N, R-35W thence east on private right-of-way through Section 1, said township and range and Section 6, T-76N, R34W in the south margin of Galveston road for a distance of 1.50 miles. The line then proceeds north on public right-of-way through Sections 6, said township and range and Sections 31 and 30, T-77N, R-34W in the west margin of 725th street for a distance of 1.65 miles crossing the Southeast Quarter of the Southwest Quarter, the Northeast Quarter of the Southeast Quarter, and the Northeast Quarter of Section 30 said township and range into the Southwest Quarter of the Southwest Quarter of Section 20, said township and range crossing Eastland Road, a distance of 1.25 miles. Thence north on public right-of-way along the east line of Section 20, said township and range in the east margin of 730th Street a distance of 0.9 mile. Thence west crossing 730th Street and into private right-of-way in the south margin of Dallas Road in Sections 20 and 19, said township and range to a interconnection at PowerCo’s Anita Substation, a distance of 0.15 mile.

The line then proceeds east as the second circuit of the double circuit segment on private right-of-way in Sections 19 and 20, T-77N, R-34W along the south margin of Dallas Road for a distance of 0.15 mile crossing 730th Street. Then north on public right-of-way in Sections 20 and 17, said township and range along the east margin of 730th Street, a distance of 0.20 mile. Thence northwesterly on public right-of-way following the irregular road Crooked Creek Road through the Southeast Quarter and the North Half of Section 18, said township and range to the northeast corner of said Section, a distance of 1.57 miles. Thence north in public right-of-way of Crooked Creek Road in Section 18 and 7, said township and range, a distance of 0.03 mile. Thence north in private right-of-way along the west line of Sections 7 and 6, said township and range crossing Boston Road, Highway 6 to the center of Akron Road, the line ending at the Cass – Audubon County border, a distance of 2.0 miles

-----------------------

Maximum and nominal voltages must be provided

County name must be provided

Any termini in other counties must be provided.

For new petitions and amendments you must list all counties involved in the project

Right-of-way type must be provided for each segment

Beginning and ending points must be identified

Summation of segments must equal circuit miles in petition form

Provide township and range. May reference previous T&R if same

Page numbers must be correct

Information on the public lands survey system can be found at: