23 05 93
If the design CFM (within -5%) cannot be achieved, verify the air handler unit's CFM by supply air duct traverse; do not use return air duct traverse. When a duct traverse is utilized, provide a Duct Traverse Report (8.10.L) in TAB report and note traverse locations on reduced set of HVAC floor plans. ................
................