Division 9 - NCDOT

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Division 9

Davidson Davie Forsyth Rowan Stokes

9

704

B-5784

B-5766

STOKES

772

66 8

I-5887

52

B-5825

311

65

R-2247EC

FORSYTH 158

U-5755

Winston-Salem

B-4746

U-5824

U-2579C U-2579B R-2577A

U-5760

U-5536

421

Lewisville R-2247CD

I-5794 Clemmons

AV-5738 U-2827B

B-4509

40 TD-4743

U-2579AB

I-5857 I-5766

EB-5722

B-5770 I-5880

U-2579AA

U-4734 I-5795 W-5510

I-5814

74 66

I-5767

U-2707

U-5786

I-5765

R-5736 I-5823

40

158 DAVIE

R-5728

64 801

B-5160

601

ROWAN 70

B-5772

29

AV-5754 I-5859

B-5769

Salisbury U-5738 U-5820 I-5858 I-5741

P-5206B

I-5824

52

Thomasville

150 85

U-5757

B-5779 R-5737

B-3159 Lexington AV-5749

I-5740

B-5780

I-5793

109

47 DAVIDSON

8

B-4808

152

52

I-3802B Kannapolis B-5521

W-5313

B-4626

DRAFT STIP FY 2015-2025 STI Projects

DIVISION 9

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRY REGIONAL RAIL DIVISION RAIL REGIONAL TRANSIT DIVISION TRANSIT SAFETY TRANSITION * TRANSITION * INTERSTATE MAINTENANCE STATEWIDE HIGHWAY REGIONAL HIGHWAY DIVISON HIGHWAY DIVISION BIKE/PEDESTRIAN INTERSTATE ROUTE US ROUTE NC ROUTE SECONDARY ROAD MUNICIPAL BOUNDARIES MILITARY BASE NCDOT DIVISION BOUNDARY COUNTY BOUNDARY WATER FEATURES

* Note: Reflects 108 of the Major Transition Projects Note: FY 2015 projects represent major projects not

let as of November 2014

0

3.75

7.5

15

Miles

DIVISION 00

HIGHWAY PROGRAM

COUNTY ROUTE/CITY

ID NUMBER

WAKE NC 00

ROUTE/CITY I - Interstate US or NC Routes SR - Secondary Road Various - multiple routes NEW ROUTE or City

R-0000 SW

IDENTIFICATION NUMBER Assigned to each project at conception and remains with project until completion.

LOCATION / DESCRIPTION

TOTAL PRIOR

LENGTH PROJECT YEARS (MILES) COST COST

(THOU) (THOU)

FUNDS

FY 2015

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

STATE TRANSPORTATION IMPROVEMENT PROGRAM FY 2016 FY 2017 FY 2018 FY 2019 FY 2020

FY 2021

DEVELOPMENTAL PROGRAM

FY 2022

FY 2023 FY 2024

FY 2025

UNFUNDED FUTURE YEARS

I-40 TO NC 96 EAST OF HOMETOWN. 7.3 WIDEN TO A FOUR-LANE FACILITY WITH A BYPASS OF HOMETOWN ON NEW LOCATION.

LOCATION / DESCRIPTION Project termini and a general work description.

FUNDING SOURCE (2) See Highway Funding Key for an explanation of funding categories used for each project phase.

FUNDING CATEGORY (1) Identifies the "STI" Funding Category for the project and any project breaks.

63,450

250 NHP R 4000 A NHP M 700 NHP U 1500 NHP NHP NHP NHP NHP

C 9000 A

SW A SW B SW C

I-40 TO NC 3 NC 3 TO SR 1003 SR 1003 TO NC 96

PROJECT BREAKS One or two letter designation for project break.

R 3000 B

U 5000 B

C 5000 B C 5000 B C 5000 B R 10000 C C 20000 C

WORK TYPE (ACTIVITY) (3) Phases of implementation: Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. For other work types or activities see Work Type (Activity) box below.

ESTIMATED COST Preliminary engineering, right of way, utility, mitigation and construction cost estimates by funding category in current dollars. Cost may include one or more funding types. Multi-year funding of a project segment indicates (Cash-Flow Funding) with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of dollars.)

UNFUNDED FFUTURE

COMMITMENTS

(1) FUNDING CATEGORY

DIV - Division EX - Exempt HF - State Dollars (Non-STI) REG - Regional SW - Statewide TRN -Transition Project

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

APD - Appalachian Development BOND (R) - Revenue Bond CMAQ - Congestion Mitigation DP - Discretionary or Demonstration ER - Emergency Relief Funds FED - Federal Rail Funds

FLPI - Federal Lands Program (Indian Reservation Roads) HFB - Highway Fund Bridge Replacement Program

HP - Federal-Aid High Priority HRRR - High Risk Rural Roads HSIP - Highway Safety Improvement Program L - Local NHP - National Highway Performance Program

NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance) O - Others RR - Rail-Highway Safety S (M) - State Match SRTS - Safe Routes to School STP - Surface Transportation Program STPDA - Surface Transportation Program - Direct Attributable STPEB - Surface Transportation Program, Enhancements (Bike) STPON - Surface Transportation Program Bridge (On System Bridge) STPOFF -Surface Transportation Program (Off System Bridge) T - State Highway Trust Funds TAP - Transportation Alternatives Program

(3) WORK TYPE (ACTIVITY)

A - Acquisition C - Construction CG - Construction (GARVEE) F - Feasibility Study G - Grading and Structures I - Implementation L - Landscaping M - Mitigation O - Operations P - Paving PE - Preliminary Engineering R - Right of Way RG - Right of Way (GARVEE) S - Structure U - Utilities

DIVISION 9

COUNTY

ROUTE/CITY

INTERSTATE PROJECTS

DAVIDSON

I-85

DAVIDSON

I-85

DAVIDSON

I-85

ROWAN

RURAL PROJECTS

DAVIDSON

US 29 / US 70 /

BUSINESS 85

DAVIDSON

US 52 / NC 8 (FUTURE I-285)

URBAN PROJECTS

DAVIDSON

NC 8

(WINSTON ROAD)

DAVIDSON

SR 1508 (HICKORY TREE ROAD)

DAVIDSON DAVIE FORSYTH STOKES

VARIOUS

DAVIDSON DAVIE FORSYTH STOKES

VARIOUS

ID NUMBER

LOCATION / DESCRIPTION

HIGHWAY PROGRAM

LENGTH

TOTAL PRIOR PROJ YEARS COST COST (THOU) (THOU) FUNDS

FY 2015

FY 2016

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

STATE TRANSPORTATION PROGRAM

DEVELOPMENTAL PROGRAM

FY 2017

FY 2018

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

UNFUNDED FUTURE YEARS

I-5793 SR 2025 (SQUIRE BOWERS ROAD) TO 0.3

4.4

SW

MILE NORTH OF NC 109 IN THOMASVILLE. PAVEMENT REHABILITATION.

I-5740 1.7 MILES NORTH OF SR 2205 (OLD US 64)

0.9

SW

TO 0.3 MILES NORTH OF US 64. PAVEMENT REHABILITATION.

I-2304 NORTH OF SR 2120 (LONG FERRY ROAD) IN 6.8

ROWAN COUNTY TO US 29-52-70/I-85

BUSINESS IN DAVIDSON COUNTY.

TRN

ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT

INCLUDES B-3833).

6386

NHPIM

C 6386

200

NHPIM

C 200

302638

208057 NHP NHP NHP

RG 505 AC CG 16207 AC RG 466 AD

RG 505 AC RG 505 AC RG 505 AC RG 495 AC RG CG 16199 AC CG 16199 AC CG 16198 AC CG 14672 AC CG RG 466 AD RG 466 AD RG 466 AD RG 457 AD RG

533 AC 4110 AC 492 AD

RG 533 AC CG 4110 AC RG 492 AD

TRN AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETE

TRN AD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETE

AE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - IN PROGRESS

TRN AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - UNDER CONSTRUCTION INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION

R-5737 SR 1798 (OLD GREENSBORO ROAD).

2

CONVERT AT-GRADE INTERSECTION TO

INTERCHANGE.

DIV

R-4750 I-85 TO NORTH OF SR 1297 (GREEN

2.5

NEEDLES ROAD). PAVEMENT

REHABILITATION AND UPGRADING TO

INTERSTATE STANDARDS.

18600

T

L

T

DESIGN-BUILD PROJECT 9885 9885

R 700 R 2900 C 15000

UNDER CONSTRUCTION

U-5757 9TH STREET TO SR 1408 (BIESECKER ROAD) 0.5 IN LEXINGTON. WIDEN TO MULTILANES.

REG

1254

NHP

U-5786 US 52 / NC 8 / FUTURE I-285 TO NC 150.

2.9

16312

T

WIDEN TO MULTILANES.

T

T

DIV

C 1254

R 2248 U 270

C 13794

U-4742

INTERSECTION IMPROVEMENT PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) AREA.

DIV

U-4951

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING (PL) SUPPLEMENT.

DIV

8334 7834 STPDA PE

40

L

PE 10

STPDA R 80

L

R 20

STPDA C 280

L

C 70

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS

4990 4790 STPDA PE 160

L

PE 40

FORMERLY U-9999D - IN PROGRESS

DIV - Division Category

EX - Exempt Category

HF - State Dollars (Non STI) REG - Regional Category

SW - Statewide Category TRN - Transition Project

9-7

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

DIVISION 9

COUNTY

ROUTE/CITY

URBAN PROJECTS

DAVIDSON

VARIOUS

DAVIE

FORSYTH

STOKES

DAVIDSON DAVIE FORSYTH STOKES

VARIOUS

FEDERAL BRIDGE PROJECTS

DAVIDSON

US 29 NB / US 64 EB /

US 70 EB / BUSINESS

85 NB

DAVIDSON DAVIDSON DAVIDSON DAVIDSON

US 29 / US 70 / BUSINESS 85

US 29 / US 70 / BUSINESS 85 NC 8

NC 47

DAVIDSON DAVIDSON

NC 49 NC 109

DAVIDSON

SR 1194 (YADKIN COLLEGE ROAD)

ID NUMBER

LOCATION / DESCRIPTION

HIGHWAY PROGRAM

LENGTH

TOTAL PRIOR PROJ YEARS COST COST (THOU) (THOU) FUNDS

FY 2015

FY 2016

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

STATE TRANSPORTATION PROGRAM

DEVELOPMENTAL PROGRAM

FY 2017

FY 2018

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

U-5022 DIV

WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (WSUAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.

30885

STPDA

C 1419

C 4911

C 4911

C 4911

C 4911

C 4911

FY 2025 C 4911

UNFUNDED FUTURE YEARS

U-5506

SMALL ROADWAY PROJECTS IN THE WINSTON-SALEM URBAN AREA METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.

DIV

B-5779

REPLACE BRIDGE NO. 118 OVER SR 3346 (NORTH MAIN STREET) IN LEXINGTON.

REG

B-5785 HF

REPLACE BRIDGE NO. 121 AND BRIDGE NO. 122 OVER LEONARD CREEK.

B-5783 REG

REPLACE BRIDGE NO. 164 AND BRIDGE NO. 168 OVER NORFOLK SOUTHERN RAILROAD.

B-3159 REG

REPLACE BRIDGE NO. 27 OVER US 29 / US 64 / US 70 / I-85 BUSINESS IN LEXINGTON.

B-5780 REG

REPLACE BRIDGE NO. 17 OVER SWEARING CREEK.

B-5787 HF

REPLACE BRIDGE NO. 29 OVER NC 109.

B-5777 HF

REPLACE BRIDGE NO. 58 OVER US 64.

B-4740

REPLACE BRIDGE NO. 7 OVER DYKERS CREEK.

DIV

7000

STPDA PE 560

L

PE 140

STPDA R 1120

L

R 280

STPDA C 3920

L

C 980

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS

4264

NHPB

NHPB

COORDINATE WITH B-5785

4400

HFB

HFB

COORDINATE WITH B-5779

6066

NHPB

NHPB

22691 9791 NHPB

C 6450

C 6450

RIGHT OF WAY IN PROGRESS

1540

STPON R 140

HFB

DIVISION DESIGN / CENTRAL LET

2200

HFB

HFB

C 1400

2035

HFB

HFB

COORDINATE WITH R-2220B AND R-2220CA 1408 1408

UNDER CONSTRUCTION

R 203

C 4061

R 400

C 4000

R 288

C 5778

R 200

C 2000

R 185

C 1850

DIV - Division Category

EX - Exempt Category

HF - State Dollars (Non STI) REG - Regional Category

SW - Statewide Category TRN - Transition Project

9-8

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download