GUIDE SPECIFICATIONS FOR TENNIS COURT CONSTRUCTION

GUIDE SPECIFICATIONS FOR TENNIS COURT CONSTRUCTION

1

SECTION SECTION

SECTION

1.0 1.1 1.1.1 1.1.2 1.1.3 2.0 2.1 2.2 2.2.1 2.2.2 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.4 2.5 2.5.1 2.5.2 2.6 2.7 3.0

INDEX

Page

INTRODUCTION

1

TENNIS COURT CONTRACTORS 1

Selection Criteria

1

General

1

Developing Working Practices

1

Selection of Tennis Court Contractor 1

CONDITIONS FOR CONSTRUCTION2

General

2

Contract Documents

2

Scope of Work

2

Permits

2

Guidelines for Site Preparation

2

Site Stripping and Clearance

2

Earthworks

2

Inspection and Testing

3

Finished Surface Levels

3

Tennis Court Orientation

3

Dimensions

3

Court Lines

3

Court Area Dimensions

3

Design Gradients

4

General Landscape Considerations

4

COURT CONSTRUCTION

4

2

3.1 3.2 3.2.1 3.2.1.1 3.2.1.2 3.2.2 3.2.3 3.2.3.1 3.2.3.1 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.8.1 3.2.8.2 3.2.8.3

3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.5.1 3.3.5.2

General

4

Red Porous Surface

4

Subgrade Drainage System

4

Drains

4

Trenches

5

Sump Pit

5

Surrounding Edging

5

Concrete and Solid Brick

5

Concrete Foundation

5

Base Layer

6

Subsurface Layers

6

Red Porous Surfacing Layer

6

Lines

6

Maintenance

6

Initial Maintenance

6

Regular Maintenance Requirements

7

Maintenance Equipment Items

Considered Standard

7

Synthetic Grass

8

Base Requirements

8

Product Specifications

8

Seaming Tolerances

8

Sand Infill

9

Maintenance

9

General

9

Potential Problems

9

3

SECTION

3.3.5.3 3.3.5.4 3.3.5.4(a) 3.3.5.4(b) 3.4 3.4.1 3.4.2 3.4.3 3.4.3.1 3.4.3.2 3.4.4 3.4.5 3.4.5.1 3.4.5.2 3.4.5.3 3.4.6 4.0 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 4.1.6 4.2

Recommended Maintenance Procedure 9

Recommended Treatments

9

Cleansing Treatments

10

Chemical Treatments

10

Acrylic Surfaces

10

General

10

Siteworks

10

Baseworks Preparation

10

Asphalt

10

Concrete

12

Drainage

12

Acrylic Surfacing

12

General

13

Asphalt

13

Concrete

13

Points to Note

13

BASE OPTIONS

13

Asphalt Base

13

General

13

Preparation of Subgrade

13

Installation of Concrete Border

14

Installation of Crushed Rock

14

Prime

14

Hot Mix Asphalt

15

Concrete

15

4

4.2.1

Preparation of Sub Base

15

4.2.2

Polythene

15

4.2.3

Installation of Reinforcement

16

4.2.4

Installation of Concrete

16

4.2.5

Joints

16

4.2.5.1

Synthetic Grass

16

4.2.5.2

Synthetic Acrylic

16

4.3

Bitumen Seal

16

4.3.1

General

16

4.3.2

Preparation of Sub Grade

17

4.3.3

Installation of Concrete Border

17

4.3.4

Installation of Crushed Rock

17

4.3.4.1

Crushed Rock Base

18

4.3.5

Prime

18

4.3.6

Hot Mix Asphalt

18

SECTION 5.0

FENCING

19

5.1

Supply Requirements

19

5.1.1

Minimum Dimensions

19

5.1.2

Fittings

19

5.1.3

Cables

19

5.1.4

Chainwire

19

5.2

Installation Requirements

19

5.2.1

Post Centres

19

5.2.2

Footings

20

5.2.3

Support Rails and Stays

20

5

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download