MasterFormat GROUPS SUBGROUPS AND D

MasterFormat GROUPS, SUBGROUPS, AND DIVISIONS

Applications Guide

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

Division 00 ? Procurement and Contracting Requirements

Introductory Information Procurement Requirements Contracting Requirements

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

Division 01 ? General Requirements

FACILITY CONSTRUCTION SUBGROUP

Division 02 ? Existing Conditions Division 03 ? Concrete Division 04 ? Masonry Division 05 ? Metals Division 06 ? Wood, Plastics, and Composites Division 07 ? Thermal and Moisture Protection Division 08 ? Openings Division 09 ? Finishes Division 10 ? Specialties Division 11 ? Equipment Division 12 ? Furnishings Division 13 ? Special Construction Division 14 ? Conveying Equipment Division 15 ? Reserved for Future Expansion Division 16 ? Reserved for Future Expansion Division 17 ? Reserved for Future Expansion Division 18 ? Reserved for Future Expansion Division 19 ? Reserved for Future Expansion

FACILITY SERVICES SUBGROUP

Division 20 ? Reserved for Future Expansion Division 21 ? Fire Suppression Division 22 ? Plumbing Division 23 ? Heating, Ventilating, and Air Conditioning

(HVAC) Division 24 ? Reserved for Future Expansion Division 25 ? Integrated Automation Division 26 ? Electrical Division 27 ? Communications Division 28 ? Electronic Safety and Security Division 29 ? Reserved for Future Expansion

SITE AND INFRASTRUCTURE SUBGROUP

Division 30 ? Reserved for Future Expansion Division 31 ? Earthwork Division 32 ? Exterior Improvements Division 33 ? Utilities Division 34 ? Transportation Division 35 ? Waterway and Marine Construction Division 36 ? Reserved for Future Expansion Division 37 ? Reserved for Future Expansion Division 38 ? Reserved for Future Expansion Division 39 ? Reserved for Future Expansion

PROCESS EQUIPMENT SUBGROUP

Division 40 ? Process Interconnections Division 41 ? Material Processing and Handling

Equipment Division 42 ? Process Heating, Cooling, and Drying

Equipment Division 43 ? Process Gas and Liquid Handling,

Purification, and Storage Equipment Division 44 ? Pollution and Waste Control Equipment Division 45 ? Industry-Specific Manufacturing

Equipment Division 46 ? Water and Wastewater Equipment Division 47 ? Reserved for Future Expansion Division 48 ? Electrical Power Generation Division 49 ? Reserved for Future Expansion

19

Introduction and Applications Guide

NUMBER

TITLE

EXPLANATION

DIVISION 01

DIVISION 01 ? GENERAL

REQUIREMENTS

01 00 00 General Requirements

May be used as Division level Section title.

01 10 00 Summary

01 11 00

01 11 13 01 11 16 01 11 19

01 12 00

Summary of Work

Includes: description of construction delivered under a single contract. Description of provisions for future construction.

May Include: list of products ordered in advance, ownerfurnished products, salvaged material and equipment, products delivered to owner, and owner-installed products.

Alternate Terms/Abbreviations: purchase contract: procurement contract: purchase order.

See: 00 24 00 for procurement scopes. 00 54 13 for agreement form supplementary scope statement. 01 31 00 for coordination of work under a single contract. 01 64 00 for owner-supplied products.

Work Covered by Contract Documents Work by Owner Purchase Contracts

Multiple Contract Summary

Includes: description of construction delivered under more than one construction contract; for example, multiple prime, construction management, and design-build. Summary of contracts, related prior construction, related concurrent construction, contract interface, phasing of construction, and temporary facilities and controls responsibility.

May Include: list of products ordered in advance, ownerfurnished products, salvaged material and equipment, products delivered to owner, and owner-installed products, future construction, and provisions for future construction associated with each contract.

See: 00 24 00 for procurement scopes. 00 54 13 for agreement form supplementary scope statement. 01 31 16 for multiple contract coordination.

61

Master List of Numbers, Titles, and Explanations

DIVISION 01

NUMBER

01 12 13 01 12 16 01 12 19

01 14 00

01 14 13 01 14 16 01 14 19 01 14 33

01 18 00

01 18 13

01 20 00

TITLE

EXPLANATION

Summary of Contracts Work Sequence Contract Interface

Work Restrictions

Includes: restrictions that affect construction operations. Location of construction, occupancy requirements, and use of premises and site.

See: 01 53 00 for temporary construction related to access and use of site. 01 55 00 for temporary vehicular access and parking. 01 56 00 for temporary barriers and enclosures.

Access to Site Coordination with Occupants Use of Site Work in Rights-of-Way

Project Utility Sources

Includes: information concerning utility companies providing permanent services to the project.

See: 01 51 00 for temporary utilities.

Utility Service Connections Notes: this is the location to specify information necessary for connecting utilities and where connection is made by utility.

Price and Payment Procedures

01 21 00

Allowances

Includes: administrative and procedural requirements for cash and quantity allowances for products, installation, testing, and contingencies. Time allowances. In a project manual application, other titles affected by allowances should reference this title.

May Include: allowance amounts and descriptions.

See: 00 70 00 for conditions of the contract for allowance requirements.

See Also: 00 24 00 for procurement scopes for allowance amounts and items. 00 40 00 for allowances included in procurement forms. 00 43 21 for allowances procurement form supplement. 00 54 21 for allowances schedule agreement form supplement.

Master List of Numbers, Titles, and Explanations

62

NUMBER

01 21 13 01 21 16 01 21 19 01 21 23 01 21 26 01 21 29 01 21 43

01 22 00

01 22 13 01 22 16

01 23 00

01 24 00

TITLE

EXPLANATION

Cash Allowances Contingency Allowances Testing and Inspecting Allowances Installation Allowances Product Allowances Quantity Allowances Time Allowances

DIVISION 01

Unit Prices

Includes: administrative and procedural requirements for unit prices and measurement and payment.

May Include: list and description of unit price items.

See Also: 00 24 00 for procurement scopes for unit price descriptions. 00 40 00 for unit prices included in procurement forms. 00 43 22 for unit price procurement form supplement. 00 54 22 for unit prices schedule agreement form supplement.

Unit Price Measurement Unit Price Payment

Alternates

Includes: administrative and procedural requirements for alternate bids or proposals. Includes submission and acceptance procedures.

May Include: list and description of each alternate.

Alternate Terms/Abbreviations: alternates: alternatives: bid items.

See Also: 00 24 00 for procurement scopes for alternate descriptions. 00 40 00 for alternates included in procurement forms. 00 43 23 for alternates procurement form supplement.

Value Analysis

Includes: administrative and procedural requirements for value analysis, application for consideration, and consideration of proposals.

May Include: appropriate forms.

Alternate Terms/Abbreviations: value analysis: value management: value improvement.

See: 00 63 00 for modification forms. 01 26 00 for contract modification procedures.

63

Master List of Numbers, Titles, and Explanations

DIVISION 01

NUMBER

01 24 13

01 25 00

01 25 13 01 25 16

01 26 00

TITLE

EXPLANATION

Value Engineering

Substitution Procedures

Includes: administrative and procedural requirements for consideration of requests for substitution during the construction stage.

May Include: substitution procedures applicable during both procurement and construction stages. Substitution request form (during construction).

Alternate Terms/Abbreviations: accepted substitute: approved equal.

See: 00 43 25 for substitution request form (during procurement). 00 70 00 for conditions of the contract for substitution requirements. 01 24 00 for value analysis procedures. 01 62 00 for contractor's options in selecting products.

See Also: 00 26 00 for procurement substitution procedures. 00 63 25 for substitution request form (during construction).

Product Substitution Procedures Execution Substitution Procedures

Contract Modification Procedures

Includes: administrative and procedural requirements for making clarifications and proposals for change, and modifications to the contract documents.

May Include: request for interpretation form, request for information form. Clarification form. Supplemental instruction form. Field order form. Written amendment form. Construction change directive form. Work change directive form. Request for proposal form. Proposal worksheet summary form. Proposal worksheet detail form. Change order request form. Change order form.

Alternate Terms/Abbreviations: RFI: request for interpretation: request for information.

See: 00 70 00 for conditions of the contract for contract modification requirements. 00 93 00 for record clarifications and proposals. 00 94 00 for record modifications.

See Also: 00 63 00 for modification forms.

Master List of Numbers, Titles, and Explanations

64

NUMBER

01 26 13

01 26 19 01 26 33 01 26 36 01 26 39 01 26 43 01 26 46 01 26 49 01 26 53 01 26 54 01 26 57 01 26 63

01 29 00

01 29 73 01 29 76 01 29 83

01 30 00

TITLE

EXPLANATION

DIVISION 01

Requests for Information Alternate Terms/Abbreviations: RFI: request for interpretation: request for information.

Clarification Notices Minor Changes in the Work Supplemental Instructions Field Orders Amendments Construction Change Directives Work Change Directives Proposal Requests Proposal Worksheet Summaries Change Order Requests Change Orders

Payment Procedures

Includes: administrative and procedural requirements for processing of schedules of values, progress payments, and final payment.

May Include: schedule of values form. Application for payment form. Sales tax form. Consent of surety to reduction of retainage form. Stored material form.

See: 00 70 00 for conditions of the contract for payment requirements.

See Also: 00 62 00 for payment procedure forms.

Schedule of Values Progress Payment Procedures Payment Procedures for Testing Laboratory Services

Administrative Requirements

01 31 00

Project Management and Coordination

Includes: administrative and procedural requirements for the management and coordination of subcontractors and coordination with other contractors and owners. Describes coordination of various parts of work under a single contract and under multiple contracts.

Alternate Terms/Abbreviations: meetings: conferences.

See: 01 11 00 for summary of work under a single contract. 01 12 00 for multiple contract summary. 01 71 13 for mobilization requirements. 01 73 00 for execution requirements.

65

Master List of Numbers, Titles, and Explanations

DIVISION 01

NUMBER

01 31 13 01 31 14 01 31 16 01 31 19

01 31 19.13 01 31 19.16 01 31 19.23 01 31 19.33 01 31 23 01 31 26

01 32 00

01 32 13 01 32 16

01 32 16.13 01 32 19 01 32 23 01 32 26 01 32 29 01 32 33 01 32 36

01 32 43

TITLE

EXPLANATION

Project Coordination Facility Services Coordination Multiple Contract Coordination Project Meetings Preconstruction Meetings Site Mobilization Meetings Progress Meetings Preinstallation Meetings Project Web Site Electronic Communication Protocols

Construction Progress Documentation

Includes: administrative and procedural requirements for scheduling, recording, and reporting progress.

May Include: construction schedule form. Work plan schedule form. Construction equipment form. Other appropriate forms.

Alternate Terms/Abbreviations: CPM: critical path method.

See: 00 31 21 for survey information provided to bidders or proposers. 00 43 83 for proposed construction schedule form. 00 43 86 for proposed work plan schedule form. 01 71 23 for field engineering during construction. 01 78 29 for final site survey.

See Also: 00 62 83 for construction schedule form. 00 62 86 for work plan schedule form.

Scheduling of Work Construction Progress Schedule Network Analysis Schedules Submittals Schedule Survey and Layout Data Construction Progress Reporting Periodic Work Observation Photographic Documentation Video Monitoring and Documentation

Includes: web cameras.

Purchase Order Tracking

Master List of Numbers, Titles, and Explanations

66

NUMBER

01 33 00

01 33 13 01 33 16 01 33 19 01 33 23 01 33 26 01 33 29

01 33 29.01 01 33 29.02 01 33 29.03 01 33 29.04 01 33 29.05 01 33 29.06 01 33 29.07

DIVISION 01

TITLE

EXPLANATION

Submittal Procedures

Includes: administrative and procedural requirements for processing of submittals during the construction stage.

May Include: submittal transmittal form. Construction waste diversion form. Recycled content of materials form. Other appropriate forms.

See: 01 43 00 for quality assurance procedures. 01 78 00 for closeout submittals.

See Also: 00 62 11 for submittal transmittal form. 00 62 23 for construction waste diversion form. 00 62 34 for recycled content of materials form. 01 45 13 for source quality control procedures. 01 45 16 for field quality control procedures. 01 78 53 for sustainable design closeout documentation.

Certificates Design Data Field Test Reporting Shop Drawings, Product Data, and Samples Source Quality Control Reporting Sustainable Design Reporting

Notes: Level 4 numbers below to be used in conjunction with 01 33 29 Sustainable Design Reporting.

Material Cost Summary Form Wood-Containing Product List Metal-Containing Product List Material Content Form New Product Source Form Reused Product Form Prohibited Content Installer Certification

67

Master List of Numbers, Titles, and Explanations

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download