One (1)



One (1) Y___N___

== Heavy Duty Pumper/Tanker Boiler - 5.240 12/24/03 ==

One (1) Y___N___

INTENT OF SPECIFICATIONS

Crimson Fire submits the following detailed proposal is submitted for your consideration:

Unit will be protected by permanent Anti-Freeze for operation between -30 degrees F to +235 degrees F and shall have all fluid levels filled prior to delivery.

Unit will be designed and constructed to follow the requirements of the following:

FMVSS; DOT; ICC; NFPA Pamphlet 1901; SAE; TRA; ULI; TBEA; and State Motor Vehicle regulations (1901 equipment not requested is not included).

Unit will be manufactured at a Crimson Fire manufacturing facility. Crimson Fire operates two manufacturing facilities, one located at 1209 E. Birch St., Brandon, South Dakota and one located at 1420 Nimitz Ave., Talladega, Alabama. Crimson Fire has been in operation since 1912. Crimson Fire maintains a complete, on-site parts department, and usually ships spare parts orders the same day they are received for trucks out of service.

Unit will be quality control inspected and documented at each step of manufacturing, and will be fully road tested.

Unit will be fully covered by manufacturer's insurance until delivery is made.

Unit will be designed and assembled so that all recommended daily maintenance checks can be performed easily by the operator without the need for hand tools. Apparatus components that interfere with removal or repair of other major components will be attached with fasteners and installed with normal hand tools. These components will not be welded or otherwise permanently secured into place.

A test data plate will be provided at the pump operator's position which gives the rated discharges and pressures, together with the speed of the engine as determined by the manufacturer's test for this unit.

A manufacturer's certification of GVWR and GAWR on a nameplate will be affixed to the completed vehicle.

A permanent plate mounted in the driver's compartment will be supplied. It will specify the quantity and type of the following fluids used in the vehicle: engine oil, engine coolant, chassis transmission fluid, pump transmission lubrication fluid, pump primer fluid (if used), and drive axle lubrication fluid.

A permanent plate in the driver's compartment will be installed, specifying the seating capacity of the included cab.

Signs that state "OCCUPANTS MUST BE SEATED AND BELTED WHEN APPARATUS IS IN MOTION" will be provided. They will be visible from each seated position.

An accident prevention sign will be located at the rear step area of the apparatus. It will warn personnel that standing on the step while vehicle is in motion is prohibited.

A nameplate indicating the chassis transmission shift selector position to be used for pumping will be provided in the driving compartment and located so that it can be easily read from the driver's position.

The height of the fully loaded vehicle's center of gravity will not exceed the chassis manufacturer's maximum limit.

The front to rear weight distribution of the fully loaded vehicle will be within the limits set by the chassis manufacturer. The front axle loads will not be less than the maximum axle loads specified by the chassis manufacturer, under full load and all other loading conditions.

The difference in weight on the end of each axle, from side to side, when the vehicle is fully loaded and equipped will not exceed 7 per cent.

All manufacturers' operations and maintenance documents supplied with components and equipment installed on, or supplied with the completed vehicle will be provided.

Any special tools that are required to service any component will be provided with the completed apparatus. (When applicable)

The apparatus is designed so that the various parts are readily accessible for lubrication, inspection, adjustment, and repair.

The apparatus when fully loaded will be capable of the following performance on dry, level paved roads in good condition, item (d) not included.

(a) From a standing start the vehicle will attain a true speed of 35 mph within 25 seconds.

(b) From a steady pace of 15 mph, the vehicle will accelerate to a true speed of 35 mph within 15 seconds. This will be accomplished without moving gear selector.

(c) The vehicle will attain a minimum speed of 60 mph.

(d) The apparatus will be able to maintain a speed of at least 20 mph on any grade up to and including 6 percent.

The GAWR and GVWR of the chassis will be adequate to carry the fully equipped apparatus including water and other tanks filled, the specified hose load, unequipped personnel weight, ground ladders, and a miscellaneous equipment allowance per NFPA criteria as well as additional equipment and personnel specified by purchaser. A personnel is calculated at 200 lbs per person.

One (1) Y___N___

SERVICE CENTER

One (1) Y___N___

BID DRAWINGS

Drawings including, but not limited to, the overall dimensions, wheelbase, and overall length of the proposed apparatus shall be required with the bid. The drawing shall include right, left, and rear views of the apparatus.

One (1) Y___N___

BID DRAWINGS

Drawings including, but not limited to, the overall dimensions, wheelbase, and overall length of the proposed apparatus shall be required with the bid. The drawing shall include right, left, and rear views of the apparatus.

One (1) Y___N___

BID SECURITY

A 10% bid bond has been provided with this proposal as specified.

One (1) Y___N___

PERFORMANCE BOND

A 100% Performance Bond shall be supplied by Crimson Fire within thirty days (30) of bid award. The signatures of both buyer and bidder on the contract shall construe awarding of the bid.

One (1) Y___N___

APPARATUS TEST BY UNDERWRITERS LABORATORIES

The following Apparatus shall comply with all NFPA 1901 applicable regulations in effect as of the bid due date. There shall be multiple tests performed by the contractor and Underwriter's Laboratories when the apparatus has been completed. The manufacturer shall furnish the completed Test Certificate(s) to the purchaser at time of delivery. Since the inspection services of Underwriters Laboratories are available to all bidders on an equal basis, no other third party testing service shall be acceptable. The tests conducted on the apparatus shall include, but not be limited to:

PUMP & PLUMBING PERFORMANCE TEST

The apparatus pump and plumbing system shall be tested and certified.

12 VOLT ELECTRICAL TEST

The apparatus low voltage electrical system shall be tested and certified.

One (1) Y___N___

GENERATOR & 110/220-VOLT UL TESTING

The apparatus generator system shall be tested and UL certified.

One (1) Y___N___

FOAM SYSTEM TESTING

The apparatus foam system shall be tested and certified.

One (1) Y___N___

FINITE ELEMENT ANALYSIS AND TESTING

Finite Element Analysis has been utilized in evaluating and engineering the critical areas of the apparatus body. Prototype bodies have been subjected to rigorous testing over varied terrains simulating different environmental conditions. The purpose of such complex engineering methods of analysis shall be to ensure the longevity of the design by analyzing stress levels throughout the body and incorporating the structural supports wherever necessary.

There have be a minimum of 3 different load cases (per DOT, FHWA, and TTMA recommended practice) applied and analyzed to properly display the different areas and levels of stresses that will be present under the various operating conditions of the apparatus. The finite element model shall also have been subjected to various dynamic load situations using data from the Aberdeen Military Proving Grounds, and different road surface data (e.g. Chicago, IL). This is in addition to the static stress analysis. The analysis shall have included the weight of the structure plus an estimate of all the components that exist on a fully loaded apparatus (i.e. Tank, water, hose load, equipment in compartments, etc.).

Analysis shall also have been conducted on the mounting system for the apparatus body and pump house. Detailed colored drawings shall be supplied with the bidder's proposal.

One (1) Y___N___

SUPPLIED INFORMATION & EXTRAS

The apparatus manufacturer shall supply two (2) copies of apparatus manuals with all manufactured apparatus. The manuals shall include, but not be limited to: all component warranties, users manuals and information for supplied products, apparatus engineering information including drawings and build prints, and whatever other pertinent information the apparatus manufacturer can supply to its customer regarding the said apparatus.

Included in the delivery of the unit, the apparatus manufacturer shall also include spare hardware and extra fasteners, paint for touch-up, information regarding washing and care procedures, as well as other recommendations for care and upkeep of the general apparatus.

The apparatus manufacturer shall also supply a manufacturer's record of apparatus construction details, including the following information:

Owner name and address;

Apparatus manufacturer, model, and serial number;

Chassis make, model, and serial number;

GAWR of front and rear axles;

Front tire size and total rated capacity in pounds;

Rear tire size and total rated capacity in pounds;

Chassis weight distribution in pounds with water (if applicable) and manufacturer mounted equipment (front and rear);

Engine make, model, serial number, number of cylinders, bore, stroke, displacement and compression ratio, rated horsepower and related speed per SAE J690, Certificate of Maximum Net Horsepower for Motor Trucks and Tractors, and no load governed speed;

Type of fuel and fuel tank capacity;

Electrical system voltage and alternator output in amps;

Battery make and model, capacity in CCA;

Paint numbers;

Company name and signature of responsible company representative;

Weight documents from a certified scale showing actual loading on the front axle, rear axle(s), and overall vehicle (with the water tank full (if applicable) but without personnel, equipment, and hose);

Written load analysis and results of the electrical system performance tests;

Transmission make, model, and type;

Pump to drive through the transmission (yes or no);

Engine to pump gear ratio and transmission gear ratio used;

Pump make, model, rated capacity in gallons per minute, serial number, number of stages, and impeller diameter in inches;

Pump manufacturer's certification of suction capability;

Pump manufacturer's certification of hydrostatic test;

Pump manufacturer's certification of inspection and test for the fire pump;

Copy of the apparatus manufacturer's approval for stationary pumping applications;

Pump transmission make, model and serial number;

Priming device type;

Type of pump pressure control system;

The engine manufacturer's certified brake horsepower curve for the engine furnished, showing the maximum no load governed speed;

Certification of water tank capacity;

One (1) Y___N___

PRE-CONSTRUCTION CONFERENCE

The factory authorized Distributor shall be required, prior to manufacturing, to have a pre-construction conference at Chopmist Hill Fire Department with individuals from the supplying dealer to finalize all construction details.

One (1) Y___N___

FINAL INSPECTION CONFERENCE

The factory authorized Distributor shall be required, during manufacturing, to have a final completion inspection conference at the site of the manufacturing facility with Two (2) individuals from the Chopmist Hill Fire Department to inspect the apparatus after construction.

The factories authorized distributor shall, at his expense, provide transportation, lodging, and meals. Any distance greater than 200 miles shall be by commercial air travel.

One (1) Y___N___

ON-LINE CUSTOMER INTERACTION

The manufacturer shall provide the capability for online access through the manufacturer's web site. There shall be a dedicated section of the website for customers to access the status of their apparatus during the construction phases. In this secured area customers will be able view final build drawings, important production target dates, and specific digital photos of their apparatus during the construction phases. The following minimum photos will be provided with this service:

1. Chassis

2. Body, pre-paint

3. Body, painted

4. Body on chassis

5. Gauge panel (if applicable)

6. Mid-assembly (right side)

7. Mid-assembly (left side)

8. Final (front view)

9. Final (rear view)

10. Final (left side)

11. Final (right side)

12. Specialty photos as requested by the customer (maximum of 4)

Due to the complex nature of fire apparatus and the importance of communication between the manufacturer and customer, this line item is considered a critical requirement. NO EXCEPTIONS

One (1) Y___N___

DELIVERY

A factory-authorized individual shall deliver the unit under its own power. The unit will remain insured by the apparatus manufacturer until the department accepts the unit.

One (1) Y___N___

EQUIPMENT MOUNTING

All equipment for this vehicle shall be mounted on the vehicel by the local dealership at their facility.

One (1) Y___N___

PUMP & APPARATUS TRAINING

The successful bidder shall provide a factory-trained technician to provide the following training:

A minimum four (4) hour structured training course for the fire apparatus mechanics of the department, covering the repair and maintenance of all components of the apparatus called for in the specifications.

The successful bidder shall provide a minimum eight (8) hour structured training course to be to cover each of the personnel assigned to operate the apparatus, covering nomenclature of components, proper operation of the apparatus, daily operational maintenance checks, and other information necessary for a firefighter/driver/engineer to properly operate and maintain the apparatus.

It is intended that this training be organized in such a manner that both the mechanics and fire personnel receive full benefit of the aforementioned structured training. The firefighter/operator training shall be conducted within one week after the vehicle is fully accepted and readied for service by the "Purchaser" or at a time mutually agreed upon by the "Purchaser" and "Supplier".

One (1) Y___N___

LIABILITY INSURANCE COVERAGE

Crimson Fire's certificate of liability insurance coverage is included in this proposal, in the minimum required amount of $35 million.

One (1) Y___N___

DEMONSTRATOR OR STOCK UNITS

These specifications were carefully researched and developed by the department to provide a unit to serve our unique requirements. Because of this, it is not desired that stock or demonstrator units be bid. Bidders are to bid units meeting our prepared specification only. Proposals for stock or demonstrator units will be rejected as being non-responsive.

One (1) Y___N___

GENERAL WARRANTY

We warrant each new fire apparatus manufactured by Crimson Fire for a period of one (1) year from the date of delivery, except for the chassis and certain other components as noted in paragraph three.

Under this warranty we agree to furnish any parts to replace those that have failed due to defective material or workmanship where there is no indication of abuse, neglect, unusual or other than normal service providing that such parts are, at our option, made available for our inspection and at our request, returned to our factory or other location designated by us with transportation prepaid within thirty days after the date of failure or within one year from the date of the delivery of the apparatus to the original purchaser, whichever occurs first, and inspection indicates that the failure was attributed to defective material or workmanship.

The warranty on the chassis, engine, transmission, tires, storage batteries, generators, electrical lamps and other devices subject to deterioration is limited to the warranty of the manufacturer thereof and adjustments for the same are to be made directly with the manufacturer by the customer.

This warranty shall not apply to any fire apparatus, which has been repaired or altered outside our factory in any way, unless prior written authorization has been received from Crimson Fire.

This warranty shall not apply to those items, which are usually considered normal maintenance and upkeep services including, but not limited to, normal lubrication or proper adjustment of minor auxiliary pumps and reels.

This warranty is in lieu of all other warranties, expressed or implied, and all other obligations or liabilities on our part. We neither assume nor authorize any person to assume for us any liability in connection with the sales of our apparatus unless made in writing by Crimson Fire.

One (1) Y___N___

STRUCTURAL WARRANTY

A structural warranty will be provided by the apparatus manufacturer for products of its manufacture to be free from defects in material and workmanship, under normal use and service, for a period of twenty (20) years. Please see the official warranty document in the appendix (attached) for specific details.

One (1) Y___N___

PAINT WARRANTY

A ten (10) year Paint Warranty will be included with the apparatus. Please see the official warranty document in the appendix (attached) for specific details.

One (1) Y___N___

PUMP WARRANTY

A pump warranty shall be provided by the pump manufacturer for products of its manufacture to be free from defects in material and workmanship, under normal use and service, for a period of two (2) years or two thousand (2000) hours of useage, whichever comes first. Please see the official warranty document in the appendix (attached) for specific details.

One (1) Y___N___

TANK WARRANTY

A lifetime tank warranty shall be provided by the tank manufacturer. Please see the official warranty document in the appendix (attached) for specific details.

One (1) Y___N___

MAXIMUM OVER ALL LENGTH REQUIREMENT

The Apparatus specified shall be constructed as detailed and shall NOT exceed a Maximum Over All Length of 391 Inches.

Pre-con meeting notes 7-08-2004

Specs being change to match the blueprint overall length of 401.455"

One (1) Y___N___

MAXIMUM OVER ALL HEIGHT REQUIREMENT

The Apparatus specified shall be constructed as detailed and shall NOT exceed a Maximum Over All Height of 117 Inches.

One (1) Y___N___

MAXIMUM OVER ALL WIDTH OF NINETY-NINE (99) INCHES

The Apparatus specified shall be constructed as detailed and shall NOT exceed a Maximum Over All Width of Ninety-nine (99) Inches. This dimension shall include the primary construction of the apparatus body and chassis cab. Any peripherals that are 'removable' shall not be incorporated into this measurement. Items that are considered 'removable' are: Rub Rails, Fenderettes, Mirrors, Lights, Handrails, Front Bumpers,Etc.

One (1) Y___N___

== GLADIATOR CLASSIC/EVOLUTION - 1.001 11/21/03 ==

One (1) Y___N___

CAB AND CHASSIS

The cab and chassis shall be a Spartan Chassis Flat Floor Gladiator, model GA41T, short medium four door, 10" raised roof over crew and driver-officer area, aluminum tilt cab, built specifically for the fire service by a publicly held U.S. parent company, specializing in chassis design for all fire service applications. The cab and chassis shall meet the requirements of the National Fire Protection Association Standard 1901, (1999 edition or latest edition).

One (1) Y___N___

FLAT FLOOR SMFD 10" RAISED ROOF TILT CAB

The cab shall be a Spartan Chassis Flat Floor, SMFD (short-medium four door), 10" raised roof, tilt aluminum cab, capable of seating six (6) firefighters.

The cab shall be of the Eurospace interior design allowing for easy communication inside the cab. The cab overall length shall be 119.00" with 45.00" from the centerline of the front axle to the back of the cab.

The rear cab wall shall be .090" thick aluminum. The rear floor to the headliner shall be 65.00" high.

The cab front skin and floor shall be .190" thick aluminum. The inside width shall be 90.00" and the front floor to headliner shall be 68.00" high.

All glass used in the cab shall be automotive tint. The windshield shall have a maximum of 2890 sq.in. area and be of the wraparound design 52.88" wide and 27.88" height for maximum visibility. Left and right windshield shall use the same interchangeable glass. All cab windows shall be the same height as the windshield to provide full panoramic visibility.

The rear door windows shall be roll-down type 27.50" x 26.00" with a total glass area of 715 sq. in. each.

The front doors shall have a full roll down window 27.00" x 26.00" with a total glass area of 702 sq.in. each.

A molded rubber 11" grab handle shall be provided inside the cab on the hinge post at the officer door for entering and exiting the cab.

The driver and officer seats shall have an 8" high x 16.25" wide x 18.75" deep compartment in the seat box beneath them. The compartment shall have a hinged door with an opening of 6" high x 14.25" wide.

Intermittent electric wipers with a single motor and electric powered "wet arm" type windshield washers shall be provided. Access to the wiper motor shall be through the driver's side headlamp module located on the front cab fascia.

One (1) Y___N___

CAB DOORS

The cab doors shall be flush, full length type with hidden .375" stainless steel door hinges. All doors shall be equipped with push button type exterior latches, suitable for use with firefighter mittens, and keyed alike locks that are designed to prevent accidental lockout.

The interior latches shall be flush paddle type, which are incorporated into an upper door panel.

The front doors shall measure 43.00" x 77.00" with .13" thick aluminum skins. The front steps shall be a two (2) step configuration with the lower step constructed of stainless steel open grate material and the intermediate step shall be covered with embossed, NFPA compliant, aluminum treadplate.

The following measurements shall apply:

First step: 12.13" deep x 30.63" wide

Intermediate step: 8.62" deep x 33.00" wide

Ground to first step: approximately 21.00"

First step to intermediate step: 11.00"

Intermediate step to floor: 11.00"

The rear doors shall measure 34.00" x 87.00" with .13" thick aluminum skins. The rear steps shall be a two (2) step configuration with the lower step constructed of stainless steel open grate material and the intermediate step covered with embossed, NFPA compliant, aluminum treadplate.

The following measurements shall apply:

First step: 11.00" deep x 10.00" wide

Intermediate step: 11.50" deep x 11.25" wide

Ground to first step: approximately 21.00"

First step to intermediate step: 12.50"

Intermediate step to floor: 12.50"

One (1) Y___N___

STAINLESS TRIM

A stainless steel trim band, 10" high with upper and lower trim affixed without holes and fasteners shall be installed on the lower exterior sides of the cab and doors, equal in height of the front bumper.

One (1) Y___N___

CLASSIC FRONT FACIA

The front cab fascia shall be constructed of aluminum, which will attach to the front cab skin and act as a fascia only, providing no additional support for the cab aluminum structure.

The front fascia will cover the front aluminum cab structure from the bottom of the windshield down to the bottom of the cab. The front cab fascia shall have provisions for four (Hi/Low Beam) headlamps, turn signal lamps and up to four warning lamps.

The front fascia shall allow access to check and fill the engine oil, power steering fluid and wiper washer fluid. Access is also provided for servicing the windshield wiper motor and linkage, ember separator, headlamps, electrical bulkhead connectors, transmission ECU and the multiplex V-Mux control.

One (1) Y___N___

HEADLIGHTS

Four (4) rectangular halogen headlamps with separate high and low beams in bright bezels shall be provided. The headlamps shall be equipped with a "Daytime Running" light feature, which will illuminate the headlights to 80% brilliance when the ignition switch is in the "On" position and the parking brake is released.

Two (2) round side turn signal/marker lights shall be provided on the front cab corners.

One (1) Y___N___

FRONT WARNING LIGHTS

Two (2) Whelen model 600 strobe warning lights shall be provided.

The outer lamp on each side shall be an amber polycarbonate lens, arrow type directional signal.

The lamps shall be installed in bright bezels that match the headlamp bezels.

A power supply capable of powering at least four lamps shall be mounted in front of the driver's area on the bulkhead.

One (1) Y___N___

CAB MIRRORS

Two (2) Retrac West Coast style mirrors Model 1179H shall be provided. The mirrors shall be Single Vision, non-motorized and heated with flat 7" x 16" head and 8" round lower convex. The mirror heads shall be mounted on stainless steel bow swing away-type arms mounted to the cab doors.

One (1) Y___N___

CAB CRASH TEST ECE-29

Spartan Chassis Inc has successfully submitted their extruded flat floor cab to the International crash test ECE-29, Addendum 28, revision 1. As part of the ECE regulation 29 test, the frontal area of the cab is struck by a 3,700 pound pendulum weight. The weight is brought back to a sixty degree angle and then the weight is released and allowed to swing forward, imparting some 32,600 lb.ft. of force to the cab front face. The cab must be so constructed that after the test, there will be minimal intrusion of cab structure into the passenger area. Note: After the test the Spartan cab doors remained usable for both entry or exit. Also, as part of the test the cab roof must withstand a static load bearing test. The Spartan cab withstood a weight of over 21,500 pounds without permanent damage or collapse. The above tests were witnessed by and attested to by an independent third party. The test results were recorded on/by cameras, high speed imagers, accelerometers and strain gauges. Notarized copies of the letters verifying the test results and videos of said test are available upon request.

One (1) Y___N___

ONE YEAR CHASSIS WARRANTY

The chassis manufacturer shall warrant to the original purchaser the custom fire truck chassis for a period of twelve (12) months with the exception of the actual fire apparatus chassis frame which carries a lifetime warranty. The warranty period shall begin on the date the vehicle is delivered to the original purchaser. The warranty may include conditional items, which shall be listed in the detailed warranty document that shall be provided upon request.

One (1) Y___N___

CAB WARRANTY

The cab shall be warranted for a period of ten (10) years. Warranty conditions may apply and shall be listed in the detailed warranty document that shall be provided upon request.

One (1) Y___N___

FRAME PAINT

The frame and running gear of the chassis shall painted with a standard black paint. The frame paint shall be applied before air lines and electrical wiring is installed.

One (1) Y___N___

CHASSIS WHEELBASE

The chassis wheelbase shall be 195" and water tank shall be more than 1000 gallons.

One (1) Y___N___

FRAME

The frame side rails shall be 'C' channel type 10.25" x 3.5" x .38" with an inner channel 9.44" x 3.13" x .38" of 110,000 psi minimum yield high strength steel, a RBM of 3,315,214 inch pounds and a section modulus of 30.14 cubic inches.

A minimum of seven (7) fully gusseted bolted assembly crossmembers shall be installed using grade 8 flanged head bolts and flanged lock nuts.

The area between the axle suspension hangers shall be free of any holes or fasteners in the flanges. No welding shall be incorporated in attachment of components. All frame dimensional cutting shall be by a plasma cutter. All relief areas shall be cut in with a minimum 2" radius at intersection points with ground smooth edges to prevent a stress focal point.

The frame shall carry a lifetime warranty to the original purchaser.

One (1) Y___N___

OVERALL HEIGHT

The height of the vehicle shall not exceed 117" from the ground.

One (1) Y___N___

FUEL TANK

The fuel tank shall have a minimum capacity of fifty (50) gallons. The baffled tanks shall be made of 14 gauge phosphate coated steel with chromate epoxy exterior finish.

The fuel tank shall be mounted under the frame, behind the rear axle with a three-piece strap hanger assembly with a "U" strap bolted midway on the fuel tank front and rear so the tank can be easily lowered and removed for service purposes. Strap mounting studs through the rail, hidden behind the body shall not be acceptable.

The tank shall have a vent port to facilitate rapid filling without "blow-back" and a roll over ball check vent for temperature related fuel expansion.

The tank is designed with dual draw tubes and sender flanges. The tank shall have 2"NPT fill ports for right or left hand fill. A .5"NPT drain plug shall be centered in the bottom of the tank.

The standard fuel line for ISC and ISL engines will be nylon material rated for diesel fuel. All other engines will be steel wire braid reinforced rubber.

One (1) Y___N___

FRONT BUMPER

A one piece, 10 gauge 304 polished stainless steel front bumper shall be provided. The bumper shall be 101" and 12" high, two (2) rib wrap-around type.

The bumper shall be extended 6" ahead of the cab.

One (1) Y___N___

AIR HORNS

Dual Grover Stuttertone 21" air horns shall be recessed in the front bumper, one (1) each on the left and right hand sides. A 3/8" airline "teed" equal distance from each horn shall be installed.

One (1) Y___N___

ADDITIONAL AIR RESERVOIR

An additional 1200 cubic inch air reservoir shall be installed and isolated to prevent depletion of the air to the air brake system and to act as a supply tank for operating air equipment. It shall be plumbed with a 90 psi pressure protection valve on the reservoir supply side.

One (1) Y___N___

BUMPER APRON

A 3/16" bright embossed aluminum tread plate apron shall be installed between the bumper and the front face of the cab. Stainless steel bolts shall be used to attach the apron to the bumper flange.

One (1) Y___N___

TOW HOOKS

Two (2) heavy duty chrome plated tow hooks shall be installed under the bumper and bolted directly to the chassis frame with grade "8" bolts.

One (1) Y___N___

AIR HORN ACTUATION

Air horns actuation shall be accomplished by a left side driver's and a right side officer's foot switch.

One (1) Y___N___

SPEAKERS CPI

Two (2) Cast Products Inc. bright aluminum 100 watt speakers shall be recessed in the front bumper. One (1) shall be installed on the driver's side and one (1) on the officer's side.

The speakers shall be bolted to bumper by means of a polished aluminum trim ring on the front face of the bumper.

One (1) Y___N___

SIREN 10" ELECTRIC

A Federal Q2B 10" electric (mechanical) siren shall be recessed in the left hand side of the front bumper. Only the motor will be recessed, with the front stator and grille protruding from the front face of bumper. Two (2) chrome plated protective steel straps shall be installed vertically across the front of the siren grille.

Siren shall be activated with foot switches for the officer and driver. A siren-brake switch shall be installed in the switch panel.

One (1) Y___N___

FRONT AXLE

The front axle shall be an ArvinMeritor MFS-21 with a 3.74" drop and a 71.00" KPI. It shall have a capacity of 21,500 pounds GAWR.

The springs shall be elliptical type, ten (10) leaf, 54" long, 4" wide with a military double wrapped front eye. Both spring eyes shall have a case hardened threaded bushing installed with lubrication counterbore and lubrication land off crossbore with grease fitting. The spring capacity shall meet or exceed the capacity of the front axle.

The hydraulic power assist steering gear shall be a TRW TAS-65 with a hydraulic power assist cylinder. A Vickers hydraulic power steering pump shall be gear driven from the engine. The steering ratio shall be 20.4:1 and have 5.4 turns stop to stop.

One (1) Y___N___

FRONT TIRES

The front tires shall be Michelin 425/65R 22.5 20PR "L" tubeless radial XZY highway tread with 22.5 x 12.25 ten (10) stud disc wheels. The tires and wheels shall be rated at 21,500 pounds.

One (1) Y___N___

FRONT AXLE CRAMP ANGLE

The hub piloted, MFS model front axle cramp angle shall be 48 degrees to the left and a minimum of 44 degrees turning to the right, when using the 425/65R 22.5 front tires.

One (1) Y___N___

FRONT WHEELS STEEL

The front wheels shall be Accuride hub piloted, 12.25" x 22.5" steel wheels.

One (1) Y___N___

FRONT WHEEL BEARINGS OIL LUBRICATED

The front axle wheel bearings shall be oil lubricated and come equipped with an oil level visual inspection window.

One (1) Y___N___

FRONT SHOCK ABSORBERS

Two (2) Bilstein monotubular design, nitrogen gas charged shock absorbers shall be part of the front axle suspension. Bilstein shall warranty the shock for a period of five (5) years.

One (1) Y___N___

DISC BRAKES

The front axle shall have ArvinMeritor (Rockwell) ADB-1560 disc type brakes with 15" vented rotors providing a total of 120 sq.in. of braking area and automatic slack adjusters.

One (1) Y___N___

STEERING COLUMN AND WHEEL

The Douglas Autotech steering column shall be a seven (7) position tilt and 2.25" telescopic type with an 18" steering wheel. The steering wheel shall be covered with black absorbite padding.

The steering column shall contain a horn button, self-canceling turn signal switch, four-way hazard switch and headlamp dimmer switch.

One (1) Y___N___

TANDEM REAR AXLE

The tandem rear axle shall be an ArvinMeritor model RT-40-145 with single reduction gearing and shall have a rated capacity of 40,000 pounds GAWR.

One (1) Y___N___

TOP SPEED

The top speed of the vehicle shall be 60 mph at governed engine rpm.

One (1) Y___N___

TANDEM INTER-AXLE DIFFERENTIAL LOCK

The tandem axle chassis shall include an inter-axle differential lock, which will allow both axles to be engaged as drive axles. A flipper valve actuator and red indicator lamp shall be located below the instrument panel.

One (1) Y___N___

REAR BRAKES

The rear brakes shall be 16.5" x 7" "S" cam type with automatic slack adjusters.

One (1) Y___N___

ABS BRAKES

A Meritor Wabco three axle anti-lock braking system shall be installed on the Arvin Meritor axles for safer vehicle control during braking and reduced stopping distance in all skid applications.

The system design shall incorporate a dual redundant diagonal circuit electronically controlled through a sensor and tone ring on all axles.

A dash mounted anti-lock lamp shall be provided to notify the driver of a system malfunction.

A momentary test switch shall be installed to test the system for diagnostic codes.

One (1) Y___N___

OIL LUBRICATED REAR WHEEL BEARINGS

The rear axle shall have oil lubricated wheel bearings.

One (1) Y___N___

REAR TIRES

The rear tires shall be Michelin 11R 22.5 16PR "H" tubeless radial XDE A/T mud and snow tread with 22.5 x 8.25, ten (10) stud disc wheels. Tires and wheels shall be rated at 48,040 pounds.

One (1) Y___N___

AXLE WHEELS TANDEM

The rear axle wheels shall be Accuride hub piloted, 8.25" x 22.5" steel.

One (1) Y___N___

TANDEM AXLE SUSPENSION

The rear tandem suspension shall be Ridewell Dynalastic model 2020014, incorporating a straddle mount pedestal and urethane pivot bushings, preset load distribution and independent axle movement.

Four accordion elastomer springs and four shock absorbers shall be provided to allow dampening of axles on jounce and rebound.

The suspension shall have 54" axle centers and have a rated capacity of up to and not to exceed 48,000 pounds GAWR.

One (1) Y___N___

TANDEM AXLE AIR BRAKE SYSTEM

A rapid build-up air brake system shall be provided. It shall include four (4) air reservoirs with a total of 6,204 cubic inch air capacity.

A parking brake on the spring actuated chambers on the rear axle brakes with a push-pull valve on the instrument panel shall be installed.

The rear axle spring brakes are to automatically apply in case of air pressure drop below 60 psi with a mechanical means for releasing the spring brake chambers.

One (1) Y___N___

OMIT AXLE COVER KIT STAINLESS STEEL (ALL WHEELS)

The standard front and rear wheels with stainless steel lug nut covers shall be omitted.

One (1) Y___N___

AIR DRYER

A Meritor Wabco system saver 1200 spin-on desiccant air dryer with a 12-volt, 100-watt automatic heated moisture ejector shall be installed in the air brake system.

The air dryer incorporates an internal turbo cutoff valve that closes the path between the air compressor and air dryer purge valve during the compressor "unload" cycle. The turbo cutoff valve allows purging of moisture and contaminants without the loss of turbo boost pressure.

The Meritor Wabco air dryer shall come with a three (3) year or 300,000 mile warranty provided by Meritor Wabco Vehicle Control Systems.

One (1) Y___N___

MANUAL DRAINS ON AIR TANKS

Manual drains shall be installed on all reservoirs of the air brake system.

One (1) Y___N___

NYLON AIR LINE TUBING

A dual air system plumbed with color coded reinforced nylon tubing air lines shall be installed. The primary (rear) brake line shall be green, the secondary (front) brake line red, the parking brake line orange and the auxiliary (outlet) will be blue.

Brass compression type fittings shall be used on the nylon tubing. All drop hoses shall be fiber reinforced neoprene covered hoses.

One (1) Y___N___

OUTSIDE AIR INTAKE CONNECTION

A quick release outside air intake male connector shall be provided in the left cab step area for shoreline air intake to maintain air system build up. The air connector supplied shall be compatible with a Milton 783, Parker Hannifin 2C or Meyers 54-401 connector.

One (1) Y___N___

ENGINE

A Detroit Diesel Series 60 14.0 liter, turbocharged, charge air cooled engine shall be provided.

TYPE:

In-Line six (6) cylinder, 4 cycle

HORSEPOWER:

515 @ 1800 rpm

TORQUE:

1650 lb.ft. @ 1200 rpm

DISPLACEMENT:

858 cu.in.

GOVERNOR:

DDEC Electronic

A wiring harness with connectors extending to the pump panel area with circuits provided for a hand throttle, Fire Commander, multiplexed gauges and high idle actuation (as optionally required for this apparatus) shall be provided.

A primary full flow, and secondary full flow, spin-on oil filter shall be installed as part of the engine's lubrication system.

One (1) Y___N___

AIR COMPRESSOR

The air compressor on the engine shall be a Bendix BA-921 rated as being capable of producing a minimum of 15.8 cfm. It shall be gear driven, engine oil pressure lubricated and cooled by the engine cooling system.

One (1) Y___N___

ENGINE WARRANTY

The Detroit Diesel engine shall be warranted for a period of five (5) years or 100,000 miles, whichever occurs first.

One (1) Y___N___

FUEL FILTERS - DETROIT DIESEL ENGINE

The fuel system shall have a fuel water separator as a primary filter and a secondary filter as approved by the engine manufacturer.

One (1) Y___N___

JACOBS ENGINE BRAKE

A Jacobs engine compression brake, for the six (6) cylinder engine, with brake light actuation and cutout relay when in pump mode shall be installed. The engine brake will activate upon release of accelerator when in operation mode. A dash mounted switch with "On/Off" and High/Med/Low functions shall be installed.

One (1) Y___N___

EXHAUST SYSTEM

The exhaust system shall be installed under the frame with the discharge to the right side forward of the rear tires.

A muffler and .065 wall aluminized steel exhaust tubing supported by bolted on frame brackets shall be installed.

Stainless steel flex tubing is to be installed between exhaust pipe and muffler. System joints shall be connected with lapping band clamps.

One (1) Y___N___

TRANSMISSION

The transmission shall be an Allison 4000 EVS five (5) speed automatic with electronic controls.

The transmission will have two (2) 10-bolt PTO pads, one (1) at the 8-o'clock position and the other at the 1-o'clock position.

The transmission shall be equipped with an air to oil transmission cooler located below the radiator allowing a single depth core and efficient cooling package. The transmission cooler shall be mounted in a manner to allow maximum approach angle by not protruding below the frame more than an inch. The transmission cooler shall be constructed completely of aluminum with welded side tanks. The transmission shall have two (2) internal oil filters.

Fourth gear hold-in range may be accomplished through wiring for a pumping application.

The transmission gear ratios shall be:

1st 3.51:1

2nd 1.91:1

3rd 1.43:1

4th 1.00:1

5th 0.74:1

Rev 4.80

One (1) Y___N___

TRANSMISSION MODE

The transmission, upon start-up, will select four (4) speed operation. By pressing the "mode" switch on the shift pad (mode on) provides five (5) speed overdrive.

One (1) Y___N___

TRANSMISSION WARRANTY

The Allison 4000 EVS series transmission shall be warranted for a period of five (5) years with unlimited mileage. Parts and labor shall be included in the warranty.

The transmission must be filled with transynd synthetic fluid or approved equal.

One (1) Y___N___

TAIL PIPE CHROME EXTENSION

A radiused chrome exhaust tail pipe extension, to direct exhaust gases downward, which terminates on the right hand side of the chassis, forward of the rear tires, shall be installed with a galvaneal band clamp.

One (1) Y___N___

AIR CLEANER

The air cleaner shall be Farr #62891-001 dry type with a replaceable element, it shall have an outside air intake with an ember separator filter and an indicator light in the warning light cluster to show when the air cleaner element requires replacement.

One (1) Y___N___

COOLING SYSTEM

The cooling system shall have sufficient capacity to keep the engine properly cooled under all conditions of road and pumping operations. The cooling system shall be designed to meet or exceed the engine and transmission manufacturer and EPA requirements.

Radiator

The radiator shall be a cross-flow design constructed completely of aluminum with welded side tanks. The radiator shall be located below the charge air cooler to allow a single depth core and efficient cooling system. The radiator shall have a complete deareation system capable of removing entrained air from the system. The radiator shall also be equipped with a drain cock to drain the coolant for serviceability. The cooling system shall be equipped with a separate tank that allows the system to be filled. (The system may be filled and checked through the grille on some models). The tank will include a low coolant probe and a sight glass to monitor the coolant level.

The cooling package shall have extended life coolant installed. The use of coolant additives will not be allowed, as this is part of the extended life coolant makeup. Engines equipped with coolant filters will be supplied without coolant additives.

All radiator hoses shall be silicone with stainless steel constant torque clamps.

Charge Air Cooler

The charge air cooler shall be a cross-flow design constructed completely of aluminum with welded side tanks. The charge air cooler shall be located above the radiator to allow a single depth core and efficient cooling system.

The charge air system shall be installed with silicone hump hoses and stainless steel "T" style clamps.

One (1) Y___N___

COOLING SYSTEM FAN

The engine cooling system shall incorporate a heavy-duty composite fan, belt driven on the engine on the engine. A shroud and recirculation shield system shall be used to ensure air that has passed through the radiator is not drawn through it again.

One (1) Y___N___

SILICONE HEATER HOSE

All heater system hoses shall be silicone with a stainless steel constant torque clamp approved for use with silicone hose.

One (1) Y___N___

ENGINE PUMP HEAT EXCHANGER

A single bundle type coolant to water heat exchanger shall be installed between the engine and the radiator without a shutoff valve. The heat exchanger is designed so that water from the pump does not come in contact with the engine coolant to allow the use of water from the discharge side of the pump for assisting in cooling the engine coolant.

One (1) Y___N___

HAND THROTTLE FOR PUMP PANEL

A Felsted electronic vernier type seven (7) turn hand throttle for use with a DDEC engine shall be supplied for the pump panel. A pump interlock relay to activate the hand throttle circuits shall be provided for the OEM to activate.

One (1) Y___N___

TRANSMISSION TOUCH PAD

An Allison pressure sensitive range selector touch pad shall be provided and located to the right of the driver within clear view and reach.

One (1) Y___N___

DRIVELINES

All drivelines on the tandem rear axle chassis shall be 1810 heavy duty series with "glide coat" splines on all slip shafts.

One (1) Y___N___

REAR-MOUNT PUMP PANEL HARNESS DDEC

An apparatus interface wiring harness for the Detroit Diesel engine will be supplied with the chassis. The harness shall have a connector to connect to the chassis harness drop out at the back of the cab. The harness shall be fifteen feet (15') long for a rear-mount pump panel. The harness shall contain circuits for a hand throttle, gauge power, high idle and 3 in 1 multiplexed gauge which includes tachometer, engine temperature and engine oil pressure.

One (1) Y___N___

MULTIPLEX ELECTRICAL SYSTEM

A multiplex electrical system shall be supplied. The system shall be a single starting type, installed per NFPA 1901. The electrical system shall be 12 volt, suppressed per SAE J551 with six (6) Douglas BCI-31 950 CCA batteries with 210 minute reserve capacity and 3/0 welding type dual path starter cables per SAE J541.

The Multiplexed wiring system shall include the following:

* Dash mounted information center with a 6"H x 4"W screen display

* Systems Diagnostic Menu and controls (Replaces Conventional Rocker Switches)

* Solid state switching

* Peer to Peer network architecture

* Weatherproof Nodes

* Sequences & sheds electrical loads (Replaces Load Management System)

All wiring to be appropriate gauge cross link with 311 degree F. insulation. All wires in the chassis shall be circuit numbered and function coded, in addition the SAE wiring will be color coded. The wiring shall be protected by 250 degree F. minimum high temperature flame retardant loom as required.

The starting system shall be supplied with the following:

One (1) Cole-Hersee #2484 master battery switch

One (1) Cole-Hersee #EX26654A ignition switch

One (1) starter button

One (1) green LED indicator for battery "on"

One (1) red LED indicator for ignition "on"

Includes 4 rocker switches on driver's dash:

1. Secondary Braking On/Off switch

2. Secondary Braking Variance Control (High/Low) or (High/Med/Low)

3. Spare

4. Spare

If air-conditioning option is selected the system will include inside and outside ambient temperature monitoring and "Climate control".

One (1) Y___N___

OFFICER ROCKER SWITCH PANEL

The officer's side switch panel shall be a blank panel with no switches to accommodate flush mounted devices.

One (1) Y___N___

GROUND LIGHTING

The cab shall be equipped with Trucklite brand #40044 under cab lighting. The sealed lights shall be located under the cab at each door.

One (1) Y___N___

BATTERY JUMPER STUDS

Battery jumper studs shall be provided in the driver's step area. The studs allow the vehicle to be jump started or cab to be raised in an emergency due to battery failure.

One (1) Y___N___

INSTRUMENTATION

An ergonomically designed instrument panel shall be provided. The instrument panel shall contain the following red backlit gauges and LED indicators, all within clear view of the driver.

One (1) Electronic tachometer with integral digital hour meter.

One (1) Electronic speedometer. The speedometer shall include a digital odometer/trip odometer.

One (1) three function gauge with primary air pressure, secondary air pressure and fuel level.

One (1) four function gauge with engine oil pressure, coolant temperature, transmission temperature and voltmeter.

The center of the instrument panel shall contain a cluster of indicator lamps informing the driver of the following:

RED LAMPS

Low air system one (1) or two (2)

Low engine oil pressure

High engine coolant temperature

High transmission temperature

Low coolant level (with option)

Air filter restriction

Low fuel level (activates at 1/4 full)

Stop engine

High or low voltage

Parking brake set

GREEN LAMPS

Directional left and right indicators

Auxiliary braking device active

High idle active (with high idle option)

YELLOW

Check engine

Check transmission

ABS brakes

Wait to start

Engine maintenance

BLUE LAMP

High beam headlight on

AUDIBLE WARNING SYSTEM FOR THE FOLLOWING:

Low air system

Low engine oil pressure

High engine coolant temperature

High transmission temperature

Low coolant level

High and low voltage

Stop engine

Thermal reset circuit breakers and relays shall be installed behind the electrical center cover.

One (1) Y___N___

WHELEN ELECTRONIC SIREN

A Whelen WS-295HFS2 electronic siren head shall be provided and installed in the center main switch lower panel.

One (1) Y___N___

POWER AND GROUND STUDS - BATTERY DIRECT

Power and grounding studs shall be provided and installed behind the electrical center cover with a breaker. The studs shall be #10 and capable of carrying up to a 40 amp battery direct load.

One (1) Y___N___

LOAD MANAGER

The load management system will be installed by the apparatus manufacturer or replaced with a multiplexed electrical system.

One (1) Y___N___

ALTERNATOR

A 320 amp 12 volt Leece Neville model #4890JB alternator with internal regulator shall be installed.

One (1) Y___N___

MARKER LAMPS

Five (5) I..C.C. approved Grote model #45103 Light Emitting Diode (LED) cab marker lamps shall be installed on the face of the cab above the windshield.

One (1) Y___N___

BACKUP ALARM

An ECCO #575 backup alarm shall be installed at the rear of the chassis with an output level of not less than 107 dB. The alarm will automatically activate when the transmission is placed in reverse.

One (1) Y___N___

FULL WIDTH CREW CAB DOOR ASSIST RAILS

Black powder coated cast aluminum assist rails shall be provided and installed on the inside of the rear crew doors the full width of the window glass. The rails shall assist personnel in exiting and entering the cab. The rails shall be located at the retracted door window glass level and will protect the exposed window glass area.

One (1) Y___N___

INTERIOR LIGHTING

The cab interior lighting shall consist of the following:

A red/white dome lamp shall be located over each door. The white lamp shall be activated by its respective door when opened and both activated by an individual switch on the light.

A clear light shall be located in the molded panel of each door and activated when the door is opened. The light shall be 6.5" long x 3" high.

A red/white dome lamp with individual switches shall be located in the headliner, over the engine tunnel to serve as a tunnel surface light.

One (1) Y___N___

FLASHING DOOR AJAR LIGHT

A red flashing door ajar light shall be located in the headliner, centered in the cab. The light shall be 6.00" long x 2.50" wide x 1.75" high and labeled "Do Not Move Apparatus". The light shall be wired to indicate an open door on the cab when the parking brake is released.

One (1) Y___N___

ENGINE TUNNEL LIGHT

A Grote model #60181-5 rectangular 1.5" x 2.25" x 1.13" clear work light shall be provided and installed under the engine tunnel.

One (1) Y___N___

HAND HELD SPOTLIGHT

A Collins Pulsar 500 hand-held spotlight shall be mounted to the right of center of the engine tunnel. It shall have a coil-cord, a momentary switch and a 500,000 candlepower lamp.

One (1) Y___N___

CAMERA DUAL REARVIEW WITH LCD DISPLAY

An ASA audiovox rearview camera, complete with a LCD display monitor shall be supplied. One camera will be mounted in a location, as to afford the driver a clear view of the blind spot on the officer side of the vehicle. A second camera will be shipped to the OEM for installation in the body to afford the driver a clear view of the rear of the vehicle. For viewing a 6.8" flip down monitor with color display and day and night brightness modes is provided. A one way communication speaker is to be installed at the rear of the vehicle to allow the backup advisor to use voice commands to direct the driver.

One (1) Y___N___

DRIVER SEAT

The driver seat, shall be a six (6) way electric with mechanical suspension Seats Inc. 911 high back. The seat shall have tapered and padded seat cushion with a minimum of 37" from the seat H-point to the headliner. The control switch shall be located at the lower front at the seat.

The seat shall be equipped with adjustable lumbar support, adjustable tilting seat back and "knee rake" bottom cushion adjustment.

The seat shall be equipped with a red three (3) point shoulder harness with lap belt and an automatic retractor attached to the cab.

One (1) Y___N___

IMPERIAL 1200 COVERED SEATS

The seats shall be covered with Imperial 1200 vinyl coated polyester material.

One (1) Y___N___

SCBA OFFICER SEAT

The officer seat shall be a Seats Inc. 911 "ABTS" SCBA style for the quick donning of an air pack.

The seat back shall include an angle hinged split headrest and ZICO "CRS" brackets w/6" tank retention clips. A padded vinyl cover shall be supplied over the SCBA cavity.

The seat shall be equipped with a red integrated three (3) point shoulder harness with lap belt and an automatic retractor built into the seat assembly.

One (1) Y___N___

SCBA CREW SEATS

Two (2) outboard rear facing Seats Inc. 911 "ABTS" SCBA style seats for the quick donning of an air pack shall be provided. The seat back shall include an angled hinged split headrest and ZICO "CRS" bracket with 6" tank retention clips. A removable padded vinyl cover shall be supplied over the SCBA cavity.

Each seat shall be equipped with a red integrated three (3) point shoulder harness with lap belt and an automatic retractor built into the seat assembly.

One (1) Y___N___

CREW SEAT

One (1) center rear facing Seats Inc. 911 "ABTS" SCBA seat for the quick donning of an air pack shall be installed in the crew area. The seat back shall include an angle hinged split headrest and ZICO "CRS" bracket with 6" tank retention clips. A removable padded vinyl cover shall be supplied over the SCBA cavity. The seat shall be mounted on a 40" wide aluminum riser with open face storage provisions.

The seat shall be equipped with a red integrated three (3) point shoulder harness with a lap belt and automatic retractor built into the seat assembly.

One (1) Y___N___

ABS INTERIOR TRIM

The cab interior dash trim shall consist of a one-piece ABS driver and officer assembly. The officer area will have a glovebox and door assembly. The header trim will consist of a three piece vacuum formed trim package with two (2) vinyl sunvisors.

One (1) Y___N___

ABS INNER DOOR PANEL TRIM

The inner door panels shall be an ABS vacuum formed upper and aluminum treadplate lower.

One (1) Y___N___

ENGINE COVER

The fixed engine cover shall have a fiberglass reinforced ABS plastic shell installed. The engine tunnel shall be a maximum of 29" high in the center and tapering to 26" on the sides to provide maximum hip and elbow room for the driver and officer.

The underside of the cover shall be heavily insulated with 1" multi-layer foam with a non-conductive Mylar backing and held in place with adhesive and aluminum pins and retention caps.

The cover shall incorporate a latching electrical component access cover to allow complete access to the underside of the switch panel assembly and electrical harness and components.

One (1) Y___N___

MOBILE DATA TERMINAL PROVISION - ABS DASH

A Mobile Data Terminal (MDT) provision shall be provided above the glove box on the officer side of the dash. The MDT provision shall be recessed 3.00" below the surface of the dash and 9.50"D x 13.75"W. The glove box shall be 5.75"H x 12.75"W x 5.75"D with a hinged locking door.

One (1) Y___N___

INTERIOR PAINT

The interior metal surfaces of the cab shall be finish painted the same color as the exterior color or the lower exterior color with a two-tone.

One (1) Y___N___

INTERIOR TRIM AND FLOOR MAT

The cab interior soft vinyl and ABS trim surfaces, including the seats shall be gray in color.

The pebble grain, non-slip vinyl covered, foam backed, sound deadening, multilayer insulating floor mat shall be gray. This floormat shall be two ply material with 0.25" thick closed cell foam and a 0.06" thick wear surface.

One (1) Y___N___

HVAC SYSTEM

A ceiling mounted HVAC system shall be provided. The system shall consist of an overhead heater/defroster/air-conditioning unit mounted above the engine tunnel in a central location with dash mounted controls. A roof mounted condenser is located forward of the raised roof against the slope rise, (Note: condenser location is to the side on flat roof cabs and aerial applications). The ceiling mounted HVAC system includes 14 adjustable louvers. Six (6) forward facing louvers for windshield, 45,000 Btu's of heat at 460 cfm for defrosting. Four (4) rearward facing louvers to direct air for crew comfort and six (6) for driver and officer comfort. In "Cabin Mode" the system is designed to produce 60,000 Btu's of heat and 32,000 Btu's of cooling. The system has an engine mounted Seltec TM-21 freon compressor. The system shall be capable of lowering the cab interior temperature from 100 degrees to 70 degrees within thirty minutes, with a relative humidity of 60 percent.

The A/C lines will be a mixture of custom bent zinc coated steel fittings and Aeroquip flexible hose with E-Z clip fittings.

One (1) Y___N___

DELUXE INSULATION PACKAGE

Additional insulation in the cab shall be installed to improve air-conditioning and/or heating in extreme weather climates as well as reducing road noise. The sides, roof and rear wall of the cab shall contain 1" thick multilayered insulation.

One (1) Y___N___

CAB TILT ACTUATION

The entire cab shall tilt 45 degrees to allow for easy maintenance of the engine and transmission.

The cab tilt actuation shall be with an electric over hydraulic lift pump with a control box on a pennant for safe visual operation.

The lift system shall have an ignition interlock and red lock down indicator lamp, which shall illuminate when holding "down" switch to indicate safe road operation. It shall be necessary to activate the master battery switch with the park brake set in order to tilt the cab.

Two cab tilt cylinders shall be provided with velocity fuses in each cylinder port. The cab pivots shall be 1.90" ball and be anchored to frame brackets with 1.25" diameter studs.

Two spring loaded hydraulic hold down hooks outboard of the frame shall be installed for holding the cab securely to the frame.

A steel safety assembly shall be installed on the right side cab lift cylinder to prevent accidental cab lowering. The safety assembly shall fall over the lift cylinder when the cab is in the "up" position. A cable release system shall also be provided to clear the safety assembly from the lift cylinder when lowering the cab.

One (1) Y___N___

WHEEL WELL LINERS

Full width wheel well liners shall be installed on the extruded cab to limit road splash and enable easier cleaning. The two-piece liners shall consist of an inner liner 16" wide made of ABS plastic and a outer fenderette 3.50" wide made of 14 gauge 304 polished stainless steel.

One (1) Y___N___

CAB WINDOWS

Fixed cab side windows, 16.0" x 26.0" (416 square inches) shall be installed behind the front cab doors one each side of the cab. Each window shall be the same height as the windshield to provide maximum visibility.

One (1) Y___N___

EXTERIOR CAB ASSIST HANDLES

Four (4) 18" knurled anti-slip one-piece exterior assist handles shall be installed, one (1) behind each cab door. The assist handle shall be made of 14 gauge 304 stainless steel and be 1.25" diameter to enable easy grabbing with the gloved hand.

One (1) Y___N___

TWO TONE PAINT

The cab shall be painted two tone with a finished break line 1.5" below the cab side windows and down to the top of the grill on the cab front fascia.

All cab painting must be completed prior to the installation of glass accessories or any other cab trim to assure complete paint coverage and maximum corrosion protection. The entire cab must be disc ground to remove any surface oxidation or surface debris that may hinder the paint adhesion.

Upon the application of required body fillers and their preparation, the cab shall be primed with a coating designed for corrosion resistance and surfacer-paint adhesion. The entire cab then shall be coated with an intermediate surfacer that is designed to fill minor surface defects, provide an adhesive bond between the primer and the paint, and improve the color and gloss retention of the color coats.

The cab shall be finish sanded and painted with two (2) to four (4) coats of an acrylic urethane type system designed not only for color retention but to resist acid rain and most atmospheric chemicals found on the fire ground or emergency scene.

The maximum overall film thickness of the top coat shall not exceed five (5) mils.

The Spartan standard PPG (DBHS or DCC), Sikkens FLNA or Dupont Imron (5000 or 6000) paint shall be warranted for seven (7) years against cracking, checking or peeling and loss of gloss caused by chalking or fading.

Cab underside and doors shall be rustproofed with a ten (10) year or 100,000 mile warranty certificate against perforation issued in the Fire Department's name.

One (1) Y___N___

HAND SAND AND BUFF FINISH

The base coat clear coat finish shall be machine polished after wet sanding to achieve a flat finish.

One (1) Y___N___

OPERATORS MANUAL AND PARTS LIST

A chassis operator's manual and parts list with wiring and air plumbing diagrams shall be provided. The wiring and plumbing diagrams shall be of the chassis model.

One (1) Y___N___

ENGINE AND TRANSMISSION OPERATION MANUAL

One (1) engine operation and maintenance manual and one (1) transmission operation manual shall be included in the Spartan operator's manual.

One (1) Y___N___

FIRE EXTINGUISHER

A 2.5 pound BC D.O.T approved fire extinguisher shall be shipped loose with the cab.

One (1) Y___N___

ROAD SAFETY KIT

A road safety kit shall be provided and shall consist of three (3) DOT approved reflective triangles.

One (1) Y___N___

AS BUILT DIAGRAMS

"As built" wiring diagrams shall be supplied for the chassis model provided.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Chassis - 5.240 12/24/03 ==

One (1) Y___N___

CAB TILT CONTROL

One (1) Y___N___

There shall be a remote cab tilt control located behind the pump access panel on the right side of the apparatus.

One (1) Y___N___

FUEL FILL DOOR

There shall be an aluminum fuel fill assembly located on the apparatus body accessing the chassis supplied fuel tank. The assembly shall be located in the area that best suits efficient fuel filling with the space appropriated. The fuel fill assembly will have a polished aluminum frame with a brushed aluminum door. There shall be a drain in the fuel fill assembly to allow over flow to drain on the back side of the apparatus body. The fuel fill cap to be removable. There shall be a label near the fuel fill door labeled "DIESEL FUEL ONLY". The fuel fill pipe shall have a 3/8" inside diameter vent line installed from the top of the fuel tank to the fill tube.

One (1) Y___N___

ENGINE COMPARTMENT LIGHTS

The chassis manufacturer shall provide the engine compartment lights specified previously.

One (1) Y___N___

PERIMETER LIGHTS

There shall be four underbody perimeter lights furnished and installed. One under each side of the front of the body, and two under the rear step to illuminate the ground around the truck. The ground lights shall be activated with the parking brake. They shall be manufactured by Trucklite and be model # 40003.

precon meeting notes 07-08-2004

the ground lights to be wired to the reverse circuit and the park circuit

One (1) Y___N___

DRIVELINE MODIFICATION

The chassis driveline shall be modified from it's O.E.M. Status to accommodate any changes required by the O.E.M. for wheelbase, pump installation, or otherwise.

One (1) Y___N___

BATTERY CONDITIONER, TRANSFER SWITCH and INVERTER with RECEPTACLE

A Vanner model 20-1050CUL automatic battery charger/conditioner, 1050 inveter and 30 amp transfer switch shall be installed in the cab behind the driver's seat. The charger shall have a 55 amp high capacity and 15 amp low capacity charge.

It is to be powered by a 2o amp 120V inlet receptacle located in the left hand step area.

Precon meeting notes 07-08-2004

The cab inverter/charger is to be manually controlled

The charger/inverter is to be mounted behind the driver seat.

Inverter purpose is to charge 110VAC radio chargers when on scene

Inverter switch to be located on Vista Display

One (1) Y___N___

Chassis supplied siren speaker(s)

One (1) Y___N___

PRESSURE PROTECTION VALVE

There shall be a pressure protection valve to prevent the use of air horns or other air operated accessories when the system air pressure drops below 85 psi.

One (1) Y___N___

CHASSIS REQUIRED LABELING

Signs that state "Occupants must be seated and belted when apparatus is in motion" shall be provided. They shall be visible from each seating position.

There shall be a lubrication plate mounted inside cab listing the type and grade of lubrication used in the following areas on the apparatus and chassis:

- Engine oil

- Engine Coolant

- Transmission Fluid

- Pump Transmission Lubrication Fluid

- Pump Primer Fluid

- Drive Axle Lubrication Fluid

One (1) Y___N___

VEHICLE INFORMATION LABEL

There shall be a travel clearance warning label located in the chassis cab. The travel clearance warning label to be located in easy view of the driver. The travel clearance warning label to include the following information:

1. Overall travel clearance height in feet and inches.

2. Overall travel clearance length in feet and inches.

3. Overall travel clearance width in feet and inches.

One (1) Y___N___

MUD FLAPS

Heavy duty rubber mud flaps shall be provided behind all wheels. The mud flaps shall be black rubber type and be bolted in place.

One (1) Y___N___

precon meeting notes 07-08-2004

wheel covers to be dealer supplied

One (1) Y___N___

CAB STORAGE

One (1) Y___N___

MAP & BINDER STORAGE

There shall be a binder/map storage box installed in the cab between the driver and officer seats. It shall be made of 1/8" smooth aluminum and consist of three (3) slots approximately 3.5" x 12.75" x 8" deep. The storage slots shall be angled to help retain the contents while driving. The storage box shall have a dual-action sanded finish for a pleasing appearance.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Plumbing - 5.240 12/24/03 ==

One (1) Y___N___

MIDSHIP PUMP

The pump shall have the capacity of 1500 gallons per minute, measured in U.S. Gallons. The pump shall be a Hale Fire Pump, QMax-150, single stage.

One (1) Y___N___

The entire pump shall be manufactured at the pump manufacturer's factory. The pump body and related parts shall be of fine grain alloy cast iron, with a minimum tensile strength of 30,000 PSI. All moving parts in contact with water shall be of high quality bronze or stainless steel. Pump utilizing castings made of lower tensile strength cast iron not acceptable.

Pump body shall be horizontally, on a single plane, in two sections, for easy removal of entire impeller assembly including wear rings and bearings from beneath the pump without disturbing piping or the mounting of the pump on the chassis. The pump body shall have two opposed discharge volute cutwaters to eliminate radial unbalance

The pump shall have one (1) double suction impeller made of hard, fine grain bronze of the mixed flow design; accurately machined, hand-ground and individually balanced. The vanes of the impeller intake eyes shall be hand ground and polished to a sharp edge, and be of sufficient size and design to provide ample reserve capacity utilizing minimum horsepower. The pump shaft is to be rigidly supported by three bearings for minimum deflection. One high lead bronze sleeve bearing to be located immediately adjacent to the impeller (on side opposite the gearbox). The sleeve bearing is to be lubricated by a force fed, automatic oil lubricated design, pressure balanced to exclude foreign material. The gearbox bearings shall be heavy-duty, deep groove ball bearings and they shall be splash lubricated. All gears, both drive and pump, shall be of highest quality electric furnace chrome nickel steel. Bores shall be ground to size and teeth integrated and hardened, to give an extremely accurate gear for long life, smooth, quiet running, and higher load carrying capability. An accurately cut spur design shall be provided to eliminate all possible end thrust. All gears, both drive and pump, shall be of highest quality electric furnace chrome nickel steel. The bores shall be ground to size and teeth integrated, crownshaved and hardened, to give an extremely accurate gear for long life, smooth, quiet running and higher load carrying capability. An accurately cut spur design shall be provided to eliminate all possible end thrust.

Impeller clearance rings shall be removable and made of noncorrosive material. The pump shaft shall be heat-treated, electric furnace, corrosion resistant, stainless steel. The pump shaft must be sealed with double lip oil seal to keep road dirt and water out of the drive unit.

The pump drive unit shall be of sufficient size to withstand up to 16,000 lbs./ ft. Of torque of the engine in both road and pump operating conditions. The drive unit shall be designed of ample capacity for lubrication reserve and to maintain the proper operating temperature. The drive unit shall be cast and completely manufactured and tested at the pump manufacturer factory.

The gearbox drive shafts shall be of heat treated chrome nickel steel and at least 2 3/4" in diameter, on both the input and output drive shafts. They shall withstand the full torque of the engine in both road and pump operating conditions.

The pump, both suction and discharge passages, shall be hydrostatically tested to a pressure of 600 PSI. The pump shall be fully tested at the pump manufacturer's factory to the performance spots as outlined by the latest NFPA Pamphlet No. 1901. The pump shall be free from objectionable pulsation and vibration.

The pump ratio shall be selected by the apparatus manufacturer to give maximum performance with the engine and transmission selected. The pump shall be driven by a drive line from the truck transmission. The engine shall provide sufficient horsepower and RPM to enable pump to meet and exceed its rated performance.

The pump must deliver the percentages of rated capacity at these pressures:

100% of rated capacity at 150 pounds net pressure,

100% of rated capacity at 165 pounds net pressure,

70% of rated capacity at 200 pounds net pressure,

50% of rated capacity at 250 pounds net pressure.

Since this pump is available to all bidders on an equal basis, there shall be no exception to the Hale QMax pump specifications.

One (1) Y___N___

MASTER DRAIN VALVE

There shall be a manifold type drain valve installed in the pump compartment. All pump drains shall be connected to the master drain valve. The drain valve shall be controlled on the left side lower pump house sill. The control shall be a hand wheel knob marked "open" and "closed".

One (1) Y___N___

PUMP SEALS

The pump shaft shall have only one packing gland located on the inlet side of the pump. It shall be of a split design for ease of repacking. The packing gland must be a full circle threaded design to exert uniform pressure on packing and to prevent "cocking" and uneven packing load when it is tightened. It shall be easily adjusted by hand with a rod or screwdriver with no special tools or wrenches required. The packing rings shall be of a unique, permanently lubricated, long life graphite composition and have sacrificial zinc foil separators to protect the pump shaft from galvanic corrosion.

One (1) Y___N___

PUMP SHIFT

The drive unit shall be provided with a Hale VPS air power shift system. The shifting mechanism shall be a heat treated, hard anodized aluminum power cylinder, with stainless steel shaft. A control switch for rapid shift shall be provided in the cab that locks in "Road" or "Pump" mode with a slight twist.

Adjacent to the pump shift control, there shall be two indicator lights to show the position of the pump when the control is moved to "Pump" position. A green light shall be energized when the pump shift has been completed and shall be labeled "PUMP ENGAGED"; a second green light shall be labeled "OK TO PUMP" energized when both the pump shift has been completed and the chassis automatic transmission is engaged.

A third green indicator light shall be installed adjacent to the throttle on the pump operator's panel. This light shall be labeled "Throttle Ready".

One (1) Y___N___

PRIMING SYSTEM

The priming system shall include an electrically driven rotary vane priming pump rigidly attached to the pump transmission. The priming pump shall be self lubricating and shall not require an external oil reservoir. The pump, when dry, shall be capable of taking suction and discharging water with a lift of 10 feet in not more than 30 seconds through 20 feet of suction hose through the steamers.

One (1) Y___N___

PRIMER CONTROL

The primer shall activated by a pull/push "T" handle control, Hale Model "PVG".

One (1) Y___N___

STEAMER INLETS

There shall be two (2) 6" inlets furnished, one on either side of the pump. The inlets shall protrude 3-4" away from the side panels and shall each have 6" NST threads and a removable strainer.

Two (2) Y___N___

6" CHROME PLATED BRONZE CAP(S)

There shall be two (2) 6" long handled chrome plated caps furnished. The cap(s) shall be National Standard Thread.

One (1) Y___N___

PUMP COOLING LINE

There shall be a 3/8" line run from the pump to the water tank to assist in keeping the pump water from overheating. There shall be a 1/4 turn on/off valve installed on the operator's panel.

One (1) Y___N___

STAINLESS STEEL PLUMBING

All auxilliary suction and discharge plumbing related fittings, waterways, and manifolds shall be fabricated with stainless steel pipe, brass or high pressure flexible piping with stainless steel couplings - NO EXCEPTIONS. Galvanized components and/or iron pipe shall NOT be accepted to ensure long life of the plumbing system without corrosion or deterioration of the waterway system. Where waterway transitions are critical (elbows, tees, etc), no threaded fittings shall be allowed to promote the smooth transition of water flow to minimize friction loss and turbulence. All piping components and valving shall be non-painted. All piping welds shall be wire brushed and cleaned for inspection and appearance.

The high pressure flexible piping shall be black SBR synthetic rubber hose with 300 PSI working pressure and 1200 PSI burst pressure for flexible piping sizes 1.5" through 4". Sizes 3/4", 1" and 5" are rated at 250 PSI working pressure and 1000 PSI burst pressure. All sizes are rated at 30 in HG vacuum. Reinforcement consists of two plies of high tensile strength tire cord for all sizes and helix wire installed in sizes 1" through 5" for maximum performance in tight bend applications. The material has a temperature rating of --40° F to +210° F.

The stainless steel full flow couplings are precision machined from high tensile strength stainless steel. All female couplings are brass. Mechanical grooved and male 3/4" and 1" couplings are brass. A high tensile strength stainless steel ferrule with serrations on the I.D. is utilized to assure maximum holding power when fastening couplings to hose.

One (1) Y___N___

2 1/2" RIGHT SIDE SUCTIONS

There shall be one (1) 2 1/2" gated suction inlet(s) installed on the apparatus. Each intake valve shall be equipped with a 3/4" bleeder.

One (1) Y___N___

Each suction shall be plumbed with a 2 1/2" Akron Brass 8000 series ball valve.

One (1) Y___N___

Each suction shall be controlled with a lever directly attached to the valve.

One (1) Y___N___

Each side suction shall be plumbed with 2 1/2" piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

One (1) Y___N___

The suction shall terminate with a heavily chrome plated brass 2 1/2" NST swivel female adapter with screen. In addition, a 2 1/2" NST male plug shall be included secured by a chain or cable to the inlet termination location.

One (1) Y___N___

2 1/2" LEFT SIDE SUCTIONS

There shall be one (1) 2 1/2" gated suction inlet(s) installed on the apparatus. Each intake valve shall be equipped with a 3/4" bleeder.

One (1) Y___N___

Each suction shall be plumbed with a 2 1/2" Akron Brass 8000 series ball valve.

One (1) Y___N___

Each suction shall be controlled with a lever directly attached to the valve.

One (1) Y___N___

Each side suction shall be plumbed with 2 1/2" piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

One (1) Y___N___

The suction shall terminate with a heavily chrome plated brass 2 1/2" NST swivel female adapter with screen. In addition, a 2 1/2" NST male plug shall be included secured by a chain or cable to the inlet termination location.

Two (2) Y___N___

LEFT SIDE DISCHARGES

There shall be two (2) gated discharge(s) installed on the left side of the apparatus.

Two (2) Y___N___

Each discharge shall utilize an Akron Brass 2 1/2" 8000 series valve.

Two (2) Y___N___

Each discharge shall be controlled with a 'swing-type' lever directly attached to the valve. The lever shall operate just over 90 degrees of travel to provide full open / full closed positioning of the valve.

Two (2) Y___N___

Each discharge shall be plumbed with 2 1/2" piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

Two (2) Y___N___

The discharge shall terminate with a 2 1/2" NST adapter and a 2 1/2" NST female by male swivel 30 degree elbow. In addition, a 2 1/2" NST cap shall be included, secured by a chain or cable to the outlet termination location.

Two (2) Y___N___

A Class 1 2 1/2" SST model gauge shall be supplied for discharge pressure reading 0-400 psi.

One (1) Y___N___

LEFT REAR DISCHARGES

There shall be one (1) gated discharge(s) installed in the rear of the apparatus, on the left side of the truck.

One (1) Y___N___

Each discharge shall utilize an Akron Brass 2 1/2" 8000 series valve.

One (1) Y___N___

Each discharge shall be controlled from the side operator's panel.

One (1) Y___N___

Each discharge shall be plumbed with 2 1/2" Class 1 high pressure vapor hose and stainless steel couplings and/or stainless steel piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

One (1) Y___N___

The discharge shall terminate with a 2 1/2" NST adapter and a 2 1/2" NST female by male swivel 30 degree elbow. In addition, a 2 1/2" NST cap shall be included, secured by a chain or cable to the outlet termination location.

One (1) Y___N___

A Class 1 2 1/2" SST model gauge shall be supplied for discharge pressure reading 0-400 psi.

One (1) Y___N___

RIGHT SIDE DISCHARGES

There shall be one (1) gated discharge(s) installed on the right side of the apparatus.

One (1) Y___N___

Each discharge shall utilize an Akron Brass 2 1/2" 8000 series valve.

One (1) Y___N___

Each discharge shall be controlled from the side operator's panel.

One (1) Y___N___

Each discharge shall be plumbed with 2 1/2" piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

One (1) Y___N___

The discharge shall terminate with a 2 1/2" NST adapter and a 2 1/2" NST female by male swivel 30 degree elbow. In addition, a 2 1/2" NST cap shall be included, secured by a chain or cable to the outlet termination location.

One (1) Y___N___

A Class 1 2 1/2" SST model gauge shall be supplied for discharge pressure reading 0-400 psi.

One (1) Y___N___

MASTER DISCHARGE(S)

There shall be one (1) master discharge(s) installed at the side of the apparatus in the pump module area.

One (1) Y___N___

Each 3 1/2" discharge will be supplied with a 3" 8000 series valve body and 3 1/2" adaptors and shall be controlled from the operator's panel with an Akron hand crank control. There shall be a mechanically driven dial type indicator to show each valve position.

One (1) Y___N___

Each discharge shall be plumbed with 4" piping. The plumbing shall be drained with a Class 1 quarter-turn drain system. The drain control shall be located on the lower sill on either side of the pumphouse.

One (1) Y___N___

The discharge shall terminate with a heavily chrome plated brass 4" NPT to NST adapter and a 4" NST female swivel by 4" Storz cast aluminum elbow. In addition, a 4" Storz cap shall be included secured by a chain or cable to the outlet termination location.

One (1) Y___N___

A Class 1 2 1/2" SST model gauge shall be supplied for discharge pressure reading 0-400 psi.

One (1) Y___N___

SINGLE STACK CROSSLAYS

The crosslay hosebeds shall be located in the upper portion of the pump compartment. The crosslay shall be constructed with a twenty-five (25) inch approximate depth for laying a single stack of each hose size specified below. The crosslay area shall be located at the front of side control module apparatus and at the rear of top control module apparatus. he crosslay area shall span the entire width of the pump module apparatus. Removable slotted aluminum flooring shall be provided for hose area drainage and shall be approximately 45" above the pump compartment running board. Chicksan swivels shall be installed just below the floor of each crosslay bed just high enough for hose couplings to be accessed and tightened on to chicksans . Chicksan swivels shall swing from left to right to allow attached hose to be deployed from either side.

Pre-con meeting 07-08-2004

Double stacked crosslays changed to single stack

minimum width of hose bed for nozzle and bail to be 6"

Two (2) Y___N___

Two (2) crosslay(s) shall be provided for up to 200 feet of 1 3/4" hose.

Two (2) Y___N___

Each discharge shall utilize an Akron Brass 2" 8000 series valve.

Two (2) Y___N___

Each discharge shall be controlled from the side operator's panel.

Two (2) Y___N___

Each discharge shall be plumbed with 2" Class 1 high pressure vapor hose and stainless steel couplings and/or stainless steel piping. The plumbing shall be drained with an auto-drain located at the lowest point of the waterway system.

Two (2) Y___N___

The discharge shall terminate with a brass 1 1/2" NST chicsan swivel. This discharge is intended to be pre-connected to hose, so no cap shall be provided.

Two (2) Y___N___

A Class 1 2 1/2" lighted gauge shall be supplied for discharge pressure reading 0-400psi. The gauge shall utilize green LED lights and be manufactured by Class 1.

One (1) Y___N___

One (1) crosslay(s) shall be provided for up to 200 feet of 2 1/2" hose.

pre-con meeting notes 07-08-2004

double stacked crosslays changed to single stack

minimum hose bed width for nozzle and bail to be 6"

One (1) Y___N___

Each discharge shall utilize an Akron Brass 2 1/2" 8000 series valve.

One (1) Y___N___

Each discharge shall be controlled from the side operator's panel.

One (1) Y___N___

Each discharge shall be plumbed with 2 1/2" Class 1 high pressure vapor hose and stainless steel couplings and/or stainless steel piping. The plumbing shall be drained with an auto-drain located at the lowest point of the waterway system.

One (1) Y___N___

The discharge shall terminate with a brass 2 1/2" NST chicsan swivel. This discharge is intended to be pre-connected to hose, so no cap shall be provided.

One (1) Y___N___

A Class 1 2 1/2" lighted gauge shall be supplied for discharge pressure reading 0-400psi. The gauge shall utilize green LED lights and be manufactured by Class 1.

One (1) Y___N___

CROSSLAY TRIM

Brushed stainless steel trim shall be installed at the openings on each side of the crosslay hose bed area. The trim shall reduce the chaffing of the hose jacket on the edges of the bay area.

One (1) Y___N___

HOSEBED SPOTLIGHT

There shall be one flood light furnished and installed at the front of the body to iluminate the crosslay hosebed. It shall be 6" in diameter and be 50 watts. The light shall be manufactured by Unity.

One (1) Y___N___

DELUGE PLUMBING

One (1) Y___N___

There shall be one (1) deluge waterway(s) installed on the apparatus.

One (1) Y___N___

Each gated discharge outlet furnished shall utilize an Akron Brass 3" 8000 series valve.

One (1) Y___N___

Each discharge shall be controlled from the side operator's panel.

One (1) Y___N___

The deluge shall be plumbed with 3" piping that terminates 3" above the top of the pump compartment unless otherwise specified or required by a specific deck gun selection as noted. The plumbing shall be drained with an auto-drain located at the lowest point of the waterway system if required.

One (1) Y___N___

The monitor pipe will be capped with a stainless steel cap to allow for future installation of deck gun.

One (1) Y___N___

A Class 1 2 1/2" SST model gauge shall be supplied for discharge pressure reading 0-400 psi.

One (1) Y___N___

The deluge pipe shall be located up through the pump compartment, centered from left to right.

One (1) Y___N___

FOAM SYSTEM

Two (2) Y___N___

CLASS B SINGLE FOAM STORAGE AND DELIVERY SYSTEM

The apparatus shall be equipped with two (2) Elkhart Model # 81232001 foam sypply systems. This installation shall allow for use of the on-board foam tank with two (2) external foam eductors placed on the driver's side pump panel discharges.

A quick connect pick up tube assembly must permit easy switching from 5 gallon pails of concentrate to the on-board supply tank and back again if necessary. Each installation must include a .750" quarter turn inlet valve assembly, quick connect female coupling and quick connect plug with chain; a brushed stainless steel escutcheon plate; and a foam pick up hose assembly with quick connect coupling between the hose and the pick up tube. The pick up tube and coupling assemblies are to be chrome plated cast brass for corrosion resistance.

A supplemental .375" flush line with check valve is to be added between the foam outlets and eductor.

NOTE: Pre-con meeting notes

The two (2) foam eductors to be dealer supplied

The two (2) foam pick up tubes and the foam system shall be Crimson Supplied and installed.

Both pick up tube escutcheon plates to be mounted to the right side of the removable pump panel

on a fixed portion of the panel.

NOTE: FD HAS REQUESTED DETAILED PUMP PANEL DRAWING BE SUBMITTED FOR APPROVAL.

One (1) Y___N___

The eductor shall draw foam from the foam tank.

One (1) Y___N___

FOAM TANK

There shall be a 50 gallon foam tank furnished and plumbed with non-corrosive piping to the foam system. There shall be a square fill tower with a hinged lid equipped with a hold down device. The fill tower shall be approximatelty 10" x 10".

One (1) Y___N___

The foam tank(s) shall be integral with the booster water tank provided.

One (1) Y___N___

There shall be a 3/4" quarter turn drain valve furnished for drainage of the foam tank. The valve shall be installed in the pump house with a drain line extended to the side running board.

One (1) Y___N___

FOAM TANK LEVEL GAUGE

A foam tank level gauge shall be furnished and installed. The gauge utilizes a pressure transducer that mounts on the outside of the tank; no probes shall be used. The readout will show foam levels in increments of 1/20th of the tank capacity. At 1/4 of the tank, a visual warning will be seen and an audible alarm shall activate. The readout shall be mounted on the pump panel.

One (1) Y___N___

The system shall supply one (1) discharges as specified.

precon meeting notes 07-08-2004

the foam system will be using dealer supplied external eductors

One (1) Y___N___

TANK TO PUMP LINE

The connection between the tank and the pump shall be capable of the flow recommendations as set forth in NFPA Pamphlet 1901, latest revision and shall be tested to those standards when the pump is being certified. One (1) non-collapsible flexible hose(s) and valve(s) shall be incorporated into the tank to pump plumbing to allow movement in the line as the chassis flexes to avoid damage during normal road operation. Schedule 10 stainless steel or schedule 40 Poly-Vinyl Chloride piping may be used to complete the connection from the tank to pump valve to the water tank.

One (1) Y___N___

One (1) Akron Brass 3 1/2" valve(s) shall be installed.

One (1) Y___N___

Each valve shall be controlled with a 'swing-type' lever directly attached to the valve. The lever shall operate just over 90 degrees of travel to provide full open / full closed positioning of the valve.

One (1) Y___N___

TANK TO PUMP CHECK VALVE

There shall be a tank to pump check valve, conforming to NFPA standards, which shall be of bronze construction. The check valve shall be mounted as an integral part of the pump suction extension.

One (1) Y___N___

TANK FILL LINE

One (1) 2" tank fill/recirculating line shall be installed from the pump directly to the booster tank.

One (1) Y___N___

One (1) Akron Brass 2" valve(s) shall be installed.

One (1) Y___N___

Each valve shall be controlled from the side operator's panel.

One (1) Y___N___

DIRECT TANK FILL

There shall be an external direct tank fill port located on the rear of the apparatus.

One (1) Y___N___

One (1) Akron Brass 3" valve(s) shall be installed.

One (1) Y___N___

Each valve shall be controlled with a 'swing-type' lever directly attached to the valve. The lever shall operate just over 90 degrees of travel to provide full open / full closed positioning of the valve.

One (1) Y___N___

Each direct tank fill shall be plumbed with 3" piping.

One (1) Y___N___

The direct tank fill shall terminate with a 4" Storz elbow fitting and cap.

One (1) Y___N___

The direct tank fill shall be located on the right rear of the apparatus.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Pump Control - 5.240 12/24/03 =

One (1) Y___N___

PUMP COMPARTMENT

The complete apparatus pump compartment shall be constructed of a combination of structural tubing and formed sheetmetal. The same materials used in the body shall be utilized in the construction of the pump compartment. They structure shall be welded utilizing the same A.S.W. Certified welding procedure as used on the structural body module. These processes shall ensure the quality of structural stability of the pump compartment module.

The pump compartment module shall be separated from the apparatus body with a gap. This gap is necessary to accommodate the flexing of the chassis frame rails that is encountered while the vehicle is in transit so that harmful torsional forces are not transmitted into the structural framework.

One (1) Y___N___

TORSION BODY MOUNTING SYSTEM

The entire body module assembly shall be mounted so that it “floats” above the chassis frame rails with vibration and torsion isolator assemblies. The body substructure shall be mounted above the frame to allow independent flexing to occur between the body and the chassis. Each assembly shall be mounted to the chassis frame rails with steel, gusseted mounting brackets. Each bracket shall be powder coated for corrosion resistance. Each body mount bracket shall be mounted to the side chassis frame flange with two 5/8”-UNC Grade 5 HHCS.

Each assembly shall have a two-part rubber vibration isolator. The isolator shall be of a specific durometer to carry the necessary loads of the apparatus body, equipment, tank, water, and hose. The quantity of mounts utilized shall correspond directly to the anticipated weight being supported. Certain assemblies shall also incorporate a torsion spring. Helical coil springs shall be incorporated into specific mounts in tandem with the rubber isolators to minimize the stress absorbed by the body caused from chassis frame rail flexing. There shall be a ¼” thick UHMW polymer bearing washer between the body structure and each torsion mount. This washer shall provide dissimilar metals contact between the body structure and each mount. The UHMW bearing washer shall also act as a wear pad due to its low wear material properties.

There shall be no welding to the chassis frame rail sides, web or flanges, or drilling of holes in the top or bottom frame flanges between axles. All body to chassis connections shall be bolted so that in the event of an accident, the body shall be easily removable from the truck chassis for repair or replacement.

Because of the constant vibration and twisting action that occurs in chassis frame rails and suspension, the torsion mounting system is required to minimize the possibility of premature body structural failures. NO EXCEPTIONS.

One (1) Y___N___

SMART DISPLAY OPERATORS PANEL

The pump operator's panel shall be located on the left upper side of the apparatus pump compartment and shall be angled from the top for better visability and reduced glare. The panel shall be split into an upper and lower section. The left upper panel shall house all gauges and controls and be hinged to allow easy access to those components. The door shall have a stainless steel hinge, a dual point chrome push button latch and a rubber seal provided to prevent excessive moisture from entering or leaving the pump house.

The tubular structure shall be overlayed underneath the removable panels on each side of the compartment shall be made of brushed stainless steel.

Valve controls shall be immediately adjacent to it's respective gauge. The valve controls shall be properly labeled and color coded for ease of use. All markings shall be permanent in nature.

Adequate illumination shall be provided for all gauges and controls by means of a shielded light assembly with four (4) Trucklite model 319206 clear lights on the left side or an adequate amount of lights space permitting and one directional light on the right side panel. The on/off switch for all lights shall waterproof and be located on the control panel. This switch shall also activate any area step lighting.

One (1) Y___N___

PUMP COMPARTMENT SERVICE ACCESS

The front portion of the pump compartment structure (directly behind the chassis cab) shall not be overlayed to provide an opening for access to the midship fire pump. The total open access area for the pump and components shall be a minimum of 2500 square inches.

One (1) Y___N___

The structural framework of the pump compartment shall be self-supportive and independent of the apparatus body. The pump module shall be approximately 74" in width as measured laterally across the apparatus and approximately 70" in height. The width of the apparatus as measured longitudinally (measured within the wheelbase dimension of the apparatus) shall be specified in the remainder of the specifications.

One (1) Y___N___

The width of the pump compartment (front to back) shall be 48".

precon meeting notes 07-08-2004

the pump panel width will be changed from 44" to the 48" panel

One (1) Y___N___

APPARATUS LABELING

The apparatus shall be descriptively tagged with color coded, engraved multi-layered, modified acrylic material labels. The labels shall be applied near Apparatus features that require a user function description. Wherever necessary, the labels shall be color coded to differentiate controls and their respective functions to simplify and clarify complex configurations.

One (1) Y___N___

BRUSHED STAINLESS STEEL SIDE PANELS

There shall be two (2) side pump panels on the right side of the pump compartment, one upper panel and one lower panel. The left, upper side panel shall be the pump operator's panel. Each upper panel shall be accessible by a quick-release type latch, closing against a door seal. Each lower panel shall be easily removed for a large access to the pump for service. All panels shall be manufactured from heavy duty brushed stainless steel, capable of withstanding the effects of extreme weather and temperature.

One (1) Y___N___

RUNNING BOARDS

The running boards shall be made of a structural tubular framework. The tubular frame support all loads by transmitting the loads through the pump compartment structure directly to the chassis frame rails. The running boards shall be independent of the apparatus body and shall be tied only to the pump compartment structure, thereby eliminating any pump compartment to body interference. This is essential in keeping a truly 'modular' configuration. Slip-resistant abrasive shall be applied to the top surface of the running board framework to provide a suitable stepping surface.

One (1) Y___N___

GRIP-SURFACE INSERT

The left side running board shall have an aluminum "Diamondback" grip surface insert installed. The grip surface area shall be as large as possible by extending to the perimeter of the inside of the structural running board framework. This ventilated grip material shall allow debris and water to pass through to eliminate build-up, thereby retaining a suitable stepping surface.

One (1) Y___N___

GRIP-SURFACE INSERT

The right side running board shall have an aluminum "Diamondback" grip surface insert installed. The grip surface area shall be as large as possible by extending to the perimeter of the inside of the structural running board framework. This ventilated grip material shall allow debris and water to pass through to eliminate buildup, thereby retaining a suitable stepping surface.

One (1) Y___N___

MASTER GAUGES

Both master intake and master discharge gauges shall be manufactured by Class One and mounted on the operator's panel. They shall be liquid filled to keep the dial from pulsating and also to prevent condensation from forming inside the gauges. The master gauges shall be 4 1/2" in diameter. The master intake gauge shall read from - 30 to 400 psi with the master discharge gauge reading from 0 to 400 psi. The gauges shall be Class 1 model LFP-410.

One (1) Y___N___

TESTING PORTS

There shall be a pressure and vacuum test gauge adapter with chrome plated plugs furnished and installed on the pump operators panel.

One (1) Y___N___

HOUR METER

There shall be an hour meter installed on the pump operator's panel that tracks the number of hours the pump is running.

One (1) Y___N___

THROTTLE

The electronic throttle control shall be installed, located so that it can be operated from the pump operators position with all gauges in full view.

One (1) Y___N___

PRESSURE CONTROL MECHANISM

The pump shall be equipped with an automatic pressure control device. A single bronze, variable pressure setting relief valve shall be provided and be of ample capacity to accomodate an undue pressure rise. The relief valve shall be normally closed and shall open against pump pressure, with an indicator light to signal when open. In the event of relief valve control failure, the pump is to remain operable for the complete range of the pump's rated capacity, without requiring the closing of any emergency or "In Case of Failure" valves. The relief valve shall be a Hale model QD RV w/ PM control and light.

One (1) Y___N___

SUCTION RELIEF VALVE

A suction relief valve with a range of pressure adjustment from 75 to 250 PSI shall be furnished, and installed inside pump compartment piped to the suction side of the pump. The valve shall be preset at 125 PSI suction inlet pressure. The valve shall be installed inside the pump compartment where it will be easily accessible for future adjustment. The excess water shall be plumbed to the atmosphere via the unloader pipe and shall dump on the opposite side of the pump operator. The valve shall come with 2 1/2" male NPT threads that can be capped if the relief valve fails in the open position. For normal pumping operations, the relief valve shall not be capped and there shall be a placard stating "DO NOT CAP" installed.

One (1) Y___N___

The throttle installation shall be wired specifically for the Detroit electronic engine.

One (1) Y___N___

ENGINE INFO CENTER

There shall be a Class 1 ENFO III furnished and installed on the pump panel of the apparatus. The ENFO III provides the pump operator with Engine RPM, Oil Pressure, Engine Temperature, and Electrical System Voltage. This compact unit contains all required engine audible alarms including the low voltage alarm.

One (1) Y___N___

HEAT EXCHANGER

The supplementary heat exchanger cooling system furnished with the chassis shall be complete to the discharge side of the fire pump through the engine compartment, without intermixing, for absorption of excess heat. The heat exchanger shall be adequate in size to maintain the temperature of the coolant in the pump drive engine not in excess of the engine manufacturer's temperature rating under all pumping conditions. Appropriate drains shall be provided to allow draining the heat exchanger to prevent damage from freezing. A manual shut-off valve shall be supplied at the pump operator's position.

One (1) Y___N___

RADIO BOX

There shall be a cast aluminum, weather resistant radio box recessed mounted in the left side pump panel. The radio box shall be approximately 7" tall x 6 1/2" wide x 5" deep.

One (1) Y___N___

EXPANDED PLATFORM

The area above the smart display operator's panel shall incorpoate a larger platform area with more work space for deck gun and other operations.

One (1) Y___N___

The top of the pump compartment shall be an approved stepping surface constructed of embossed tread brite approved by the latest NFPA standards for abrasiveness.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Body - 5.240 12/24/03 ==

One (1) Y___N___

Spaceframe Body - STAINLESS STEEL

The apparatus body shall be a Space Frame design. The entire body structure shall be built as a space frame design with integral structural members forming the entire body structure (compartment frames, subframe, and tank support area). The space frame design provides maximum torsion resistance and load capabilities. The entire space frame structure shall be welded together utilizing an A.W.S. Certified welding procedure. NO EXCEPTIONS

The space frame design shall also be required because it provides energy absorbing impact zones in the structure, thus providing increased safety to the rest of the apparatus and personnel on board. Documented proof of this extra safety shall be required upon request.

The Tri-Max body structure shall consist entirely of closed section members, except where the body is mounted to the chassis. Closed section members (such as square, rectangular, triangular, or round tubes) are required because they provide maximum strength and torsion rigidity. This style of design ultimately reduces fatigue and shall add longevity to the body structure. Body designs that use formed sheet metal compartments with independent subframes shall not be acceptable.

Body Structure Members: The spaceframe body shall have triangular shaped structural members in certain areas of the body. This shape is required to prevent loss of useable compartment space and serve as an attachment member for shelves, trays, or other equipment that requires mounting. Other body structure members shall be square or rectangular. Each structural member will have a nominal outside dimension of 2.5" in at least one direction. The body shall be designed for maximum strength to weight ratio, therefore the gauge of sheet metal and structural members varies from 14 gauge to 11 gauge throughout dependent on the design requirement.

Body Material Type: All body structure and sheet material shall be premium grade Stainless Steel, Type 304L. This alloy is required because it provides optimum all-around performance for strength, manufacturing properties, and corrosion resistance.

Compartment Floors: The body compartments shall be enclosed with stainless steel sheet metal as specified above. The compartment floors shall have a 1" lip downward at the door opening side of the compartment. This lip shall integrate with a structural member on the bottom edge and form a "sweep-out" compartment. This design shall also allow for a structural flush-fitting door frame and a complete door/weather seal.

Compartment Vents: The body compartments shall be vented through the structural members to below the apparatus body. There shall be mildew resistance filter media with aluminum mesh at the bottom of each structural member that is open for venting.

Compartment Load Capacity: Each compartment shall have a minimum of one additional structural compartment floor support centered on the underside of the compartment floor. This additional member shall be integral with the rest of the body structure. Each compartment must be designed, and 3rd party analyzed to carry a working load of:

Full depth side compartment: 1,000 lbs per compartment

Half depth side compartment: 750 lbs per compartment

Rear center compartment: 1,500 lbs per compartment

NO EXCEPTIONS

Finite Element Analysis: The proposed body design must have completed a review and analysis by a legitimate 3rd party engineering firm. At a minimum, the 3rd party must have conducted a computer model finite element analysis of the proposed design. The analysis is to include real world working load scenarios. Analysis to cover both static and dynamic situations must be completed. The purpose of the finite element analysis is to ensure proper design of the apparatus body, and that it is capable of carrying the typical fire apparatus loads and those specified by NFPA for equipment. The analysis process must conclude that the body structure is properly designed and manufactured to provide longevity under normal conditions. The 3rd party must also validate the manufacturing processes are consistent with the design and analysis performed. Proof of having completed this testing must be submitted with the bid. NO EXCEPTIONS.

One (1) Y___N___

RUB RAILS

The bottom edge of the compartments shall be trimmed with rub rails to absorb minor damage while protecting the body. The rub rails shall be fabricated of brightly anodized aluminum channel. The rub rails shall be bolted in place with stainless steel bolts and locking nuts, and shall be spaced away from the body with 1/2" nylon spacers to help prevent the collection of water and debris. Each rub rail section shall be easily removable and replaced should it become damaged.

One (1) Y___N___

REAR TAILBOARD

The rear tailboard shall be fabricated of the same tubular materials as used in the apparatus body. The tailboard shall be an independent assembly welded to the rear body structural framing to provide body protection and a solid rear stepping platform. The rear step shall be designed to incorporate "crush zone" technology. This idea incorporates lighter materials in the tailboard than the body structure so the step will "crush" in a collision before the body structure.

The rear of the apparatus body shall be vertical in design - otherwise known as a 'flat-back'. On the rear body surface, a sign shall be attached that states: "DO NOT RIDE ON REAR STEP, DEATH OR SERIOUS INJURY MAY RESULT."

The rear tailboard and body shall be constructed such that the angle of departure shall be no less than 8 degrees at the rear of the apparatus when fully loaded (Per NFPA 1901).

One (1) Y___N___

The rear tailboard shall be approximately thirteen and one-half (13.5) inches deep and shall incorporate a ventilated "Diamondback" material stepping surface bolted in place which spans the width of the apparatus. The extruded stepping surface shall be completely enclosed by the supporting structural framework to minimize damage. The ventilated "Diamondback" material shall be capable of being easily replaced if necessary, using only hand tools. The framework shall be covered with an adhesive tape providing an aggressive traction surface. Use of any aluminum diamond plate material on these areas shall not be acceptable.

One (1) Y___N___

FOLDING STEPS

Each surface of the folding step shall have grip material with a minimum of 42 sq. inches in size. Each step shall be capable of sustaining a 500 lb. static load. The step shall be manufactured by Austin/Thomas Hardware model #PHS100. The following steps shall be installed:

One (1) Y___N___

precon meeting notes 07-08-2004

added one (1) extra right front folding step as decribed below

price is on change order

One folding step shall be installed on the right forward wall of the front compartment. This step shall be utilized to access the water tank fill tower of the apparatus. The steps shall also be utilized to gain access to the top of the pump compartment structure and any equipment located in the immediate vicinity.

One folding step shall be installed on the right rearward wall of the cab. This step shall be utilized to access the water tank fill tower of the apparatus. The steps shall also be utilized to gain access to the top of the pump compartment structure and any equipment located in the immediate vicinity.

One (1) Y___N___

STEP SURFACE LIGHTING

One (1) light(s) shall be mounted to illuminate stepping areas provided. Each light shall be a Weldon chrome shielded 12 candle power light. Each light shall be directed towards and positioned above the stepping surfaces.

One (1) Y___N___

Three folding steps shall be installed on the right rear vertical face of the body.

One (1) Y___N___

STEP SURFACE LIGHTING

One (1) light(s) shall be mounted to illuminate stepping areas provided. Each light shall be a Weldon chrome shielded 12 candle power light. Each light shall be directed towards and positioned above the stepping surfaces.

One (1) Y___N___

pre-con meeting notes 07-08-2004

deleted the existing three (3) steps

added the below one (1) step and light left forward wall

and the below one (1) step and light cab rear wall mounted

price is on change order

One folding step shall be installed on the left forward wall of the front compartment. This step shall be utilized to access the water tank fill tower of the apparatus. The steps shall also be utilized to gain access to the top of the pump compartment structure and any equipment located in the immediate vicinity.

One folding step shall be installed on the left rear cab wall. This step shall be utilized to access the water tank fill tower of the apparatus. The steps shall also be utilized to gain access to the top of the pump compartment structure and any equipment located in the immediate vicinity.

One (1) Y___N___

One (1) light(s) shall be mounted to illuminate stepping areas provided. Each light shall be a Weldon chrome shielded 12 candle power light. Each light shall be directed towards and positioned above the stepping surfaces.

One (1) Y___N___

One (1) 10" long x 1 1/4" diameter handrail constructed of knurled #3 polished stainless steel tubing shall be mounted in a best fit location above the step(s) to assist in climbing the steps according to NFPA 1901. There shall be chrome plated brackets with a rubber gasket installed between the body and the bracket. There shall be a 2" minimum clearance between the bracket and the body.

One (1) Y___N___

Three folding steps shall be installed on the left rear vertical face of the body.

One (1) Y___N___

STEP SURFACE LIGHTING

One (1) light(s) shall be mounted to illuminate stepping areas provided. Each light shall be a Weldon chrome shielded 12 candle power light. Each light shall be directed towards and positioned above the stepping surfaces.

One (1) Y___N___

PAINT SPECIFICATIONS

All bright metal fittings, if unavailable in stainless steel, shall be heavily chrome plated.

Critical body and sub-frame area which cannot be primed after assembly shall be pre-painted.

All welded metal surfaces shall be ground to a smooth surface prior to a degreasing and high pressure, high temperature phosphatizing process. The entire surface shall the be sprayed with a non-chromate sealing compound to prevent formulation of stains or flash rust on previously phosphatized parts.

The paint applied to the apparatus shall be PPG Industries Delta® brand, applied throughout a mulit-step process including at least two coats of each color and clear coat finish.

The coating shall be an infra red, baked air dried. The coatings shall provide full gloss finished suitable for application by high-pressure airless or conventional low pressure air atomizing spray.

The coatings shall not contain lead, cadminum or arsenic. The polyiscoyanate component shall consist of only alifatic isocyanates, with no portion being aromatic isocyanate in character. The solvents used in all components and products shall not contain ethylene glycol mono-ethyl ethers or their acetates (commercially recognized as cellosolves), nor shall they contain any chlorinated hydrocarbons. The products shall have no adverse effects on the health or nor present any unusual hazard to personnel when used according to manufacturers recommendations for handling and proper protective safety equipment, and for its intended use.

The coating system, as supplied and recommended for application, shall meet all applicable federal, state and local laws and regulations now in force or at any time during the courses of the bid.

The manufacturer shall supply (upon request) for each product and component of the system, a properly complete OSHA "Material Data Safety Sheet".

The following documents of the issue in effect on the date of the invitation to quote, form a part of this document to the extent specified herein:

Federal Standards: Number 141A and 141B paint, varnish, lacquer and related material: methods of inspection, sampling, and testing.

Military Standard: MIL-C 83486B Coating, Urethane, Alifatic Isocyanate, for Aerospace applications.

Industry Methods and Standards: ASTM Method of Analysis (American Society for testing and Materials). BMS 10-72A (Boeing Material Specifications).

The coating will meet the following test performance properties as a minimum standard.

|TEST |ASTM METHOD |REQUIREMENT |SYSTEM |

|Impact Resistance |G 14 |80 inch-lbs., direct and reverse. |Primer/ Topcoat |

|Adhesion |D 3359 |4 minimum |Primer/ Topcoat |

| |Method B | | |

|Water Immersion |Corrosion |D 610 |10 |Primer/ Topcoat |

|Resistance |Blisters |D 714 |10 | |

|(deionized water, 240 hr., 25 |Adhesion |D 3359 |4 minimum | |

|C) |Pencil Hardness |D 3363 |F minimum | |

| C)Oil Immersion |Corrosion |D 610 |10 |Primer/ |

|(10W-30, 240 hr., 25 |Blisters |D 714 |10 |Topcoat |

| |Adhesion |D 3359 |4 minimum | |

| |Pencil Hardness |D 3363 |F minimum | |

|Salt Spray Exposure | | |1000 hours |Primer/ Topcoat |

| |Scribed unit | | | |

| |Unscribed unit |D 1654 |7 minimum | |

| | | | | |

| | |B 1117 |8 minimum | |

|Humidity Resistance |D 1735 |1000 hours |Primer/ |

| | |(no effect) |Topcoat |

|Pencil Hardness |D 3363 |F Minimum |Primer/ |

| | | |Topcoat |

|QUV Resistance |D 4587 |Gloss Retention 80% |Primer/ |

| | |After 1000 hours |Topcoat |

|Gloss DOI |D 523-89 |90% (20 degree) |Primer/ |

| | | |Topcoat |

The entire exterior body structure (excluding roll-up doors) shall receive the primer coats and the finish coats. The apparatus body, will be painted in a down draft type paint booth to reduce dust, dirt or impurities in the finish paint. The painted surfaces shall have a finish with no runs, sags, craters, pinholes or other defects.

One (1) Y___N___

PAINT COLOR

The apparatus body shall be painted the color specified by the customer.

One (1) Y___N___

NATURAL COMPARTMENT FINISH

To prevent stratching of the paint finish, and to provide the maximum reflectivity for the compartment lighting, the interior of the compartments shall have a natural stainless steel finish. Absolutely no coatings will be allowed on the compartment interiors.

One (1) Y___N___

WHEEL PAINTING

The outside of each chassis wheel (inner and outer wheels both on dual wheel rear axles) shall be finish painted the same color as the apparatus body.

One (1) Y___N___

GENERAL BODY DETAILS

All compartmentation shall be constructed in a sweep out design to be water and dust proof, manufactured to the maximum possible storage capacity.

FASTENERS

All bolts and nuts used in the finish construction of the apparatus shall be coated stainless steel which helps prevent dissimilar metal electrolytic reaction and corrosion. The Manufacturer may be requested to supply evidence of fastener coating and results of salt spray testing when dissimilar metals are used. Any bolt extending into a compartment or into the hose bed area shall have an acorn nut attached or be protected in such manner where sharp edges are avoided.

WHEEL WELLS

Wheel wells shall have semicircular black polymer composite inner liners that are bolted to the wheel well panel and supported inboard by brackets that are connected to the body framework. Each wheel well shall be a continuous piece with no breaks or ledges where road grime or debris may accumulate. This liner shall be removable for access to suspension assembly for repairs. There shall be no exception to the bolted wheel well innerliner requirement.

One (1) Y___N___

WHEEL WELL PANELS

The body panel area around the wheel well on each side of the body shall be fabricated of aluminum diamond plate.

One (1) Y___N___

SCBA BOTTLE COMPARTMENTS

Cylindrical SCBA storage compartments shall be installed in the wheel well area above the wheel well liner, protected from dirt, rocks, and other debris. The storage compartments shall be made of a tube that interfaces with a spring loaded cast aluminum door and housing - fastened to the wheel well panel for a secure installation. The inside of each compartment shall be lined with material (if required) to protect the air bottles from being damaged. The storage compartments shall be installed in the apparatus tipped slightly inboard at an angle which sufficiently reduces the tendency of the bottle to slide outward when the door is opened. There shall be holes drilled in the tubes for drainage in the event that water enters the compartment. Each SCBA compartment shall be a minimum internal diameter of 7" and be at least 25" deep.

There shall be one (1) compartment on the left side, ahead of the wheel. The right side shall have two (2) compartments, one forward and one rearward.

One (1) Y___N___

TORSION BODY MOUNTING SYSTEM

The entire body module assembly shall be mounted so that it “floats” above the chassis frame rails with vibration and torsion isolator assemblies. The body substructure shall be mounted above the frame to allow independent flexing to occur between the body and the chassis. Each assembly shall be mounted to the chassis frame rails with steel, gusseted mounting brackets. Each bracket shall be powder coated for corrosion resistance. Each body mount bracket shall be mounted to the side chassis frame flange with two 5/8”-UNC Grade 5 HHCS.

Each assembly shall have a two-part rubber vibration isolator. The isolator shall be of a specific durometer to carry the necessary loads of the apparatus body, equipment, tank, water, and hose. The quantity of mounts utilized shall correspond directly to the anticipated weight being supported. Certain assemblies shall also incorporate a torsion spring. Helical coil springs shall be incorporated into specific mounts in tandem with the rubber isolators to minimize the stress absorbed by the body caused from chassis frame rail flexing. There shall be a ¼” thick UHMW polymer bearing washer between the body structure and each torsion mount. This washer shall provide dissimilar metals contact between the body structure and each mount. The UHMW bearing washer shall also act as a wear pad due to its low wear material properties.

There shall be no welding to the chassis frame rail sides, web or flanges, or drilling of holes in the top or bottom frame flanges between axles. All body to chassis connections shall be bolted so that in the event of an accident, the body shall be easily removable from the truck chassis for repair or replacement.

Because of the constant vibration and twisting action that occurs in chassis frame rails and suspension, the torsion mounting system is required to minimize the possibility of premature body structural failures. NO EXCEPTIONS.

One (1) Y___N___

BODY STRUCTURE WIDTH

The width of the apparatus body from the outside of the left compartments to the outside of the right compartments shall be 99" excluding any attached peripherals such as rub rails, fenderettes, grab handles, etc.

One (1) Y___N___

COMPARTMENT VENTILATION

To allow for proper air circulation & flow, each compartment shall have a venting route. The compartments shall be vented through the structural members to below the apparatus body into the enviroment. The venting filter shall be easily removable for cleaning and shall be treated to prevent mildew.

Two (2) Y___N___

HORIZONTAL UNISTRUT

Horizontal unistrut shall be installed on the rear wall of the left overwheel compartment of the apparatus body to accomodate mounting of SCBA clips or tool boards.

One (1) Y___N___

COMPARTMENTATION 1950-2

The following compartments shall be supplied on the apparatus:

Compartment "L1": There shall be one (1) full height compartment ahead of the rear wheels on the left side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 34.50" wide by 69" high with a lower depth of 25.5" and an upper depth of 12.5". The door opening shall measure approximately 29" wide by 62" high. The compartment will have approximately 32.27 cubic feet of space.

Compartment "L2": There shall be one (1) compartment located directly over the rear wheels on the left side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 56.75" wide by 35" high with a depth of 12.5". The door opening shall measure approximately 53.75" wide by 25" high. The compartment will have approximately 14 cubic feet of space.

Compartment "L3": There shall be one (1) compartment located directly over the rear wheels on the left side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 56.75" wide by 35" high with a depth of 12.5". The door opening shall measure approximately 53.75" wide by 25" high. The compartment will have approximately 14 cubic feet of space.

Compartment "L4": There shall be one (1) full height compartment located behind the rear wheels on the left side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 34.50" wide by 69" high with an upper depth of 12.5" and the lower portion being 25.5" deep. The door opening shall measure approximately 29" wide by 62" high. The compartment will have approximately 32.27 cubic feet of space. This compartment to be adjusted in width to match the R2.

Compartment "R1": There shall be one (1) compartment located ahead of the rear wheels on the right side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 34.50" wide by 33" high with a depth of 25.5". The door opening shall measure approximately 29" wide by 23" high. The compartment shall have approximately 16.80 cubic feet of space.

Compartment "R2": There shall be one (1) compartment located behind the rear wheels on the right side of the apparatus. The approximate interior dimensions of this compartment shall be a minimum of 34.50" wide by 33" high with a depth of 25.5". The door opening shall measure approximately 29" wide by 23" high. The compartment shall have approximately 16.80 cubic feet of space. This compartment to be adjusted to match width of Honda genset with tray.

pre-con meeting notes 07-08-2004

the body compartment dimensions listed above will be changed to match the blueprint dimensions

Note #2

the body header description to be changed to match 1950-2 body

One (1) Y___N___

COMPARTMENT 'T-SLOT' SHELF MOUNTING

Each compartment shall have intergrated 'T-Slots' precision cut into each body panel to accomodate mounting adjustable shelves, trays, and other miscellaneous equipment items. This mounting system will allow for each shelf to be full size dependent on compartment dimensions.

One (1) Y___N___

DOOR CONSTRUCTION

All doors shall be a minimum of 2" thick with a return flange on the interior of the door to provide a mounting surface for the attachment of a brushed aluminum door liner. To prevent corrosion, the liners shall not be attached with metallic fasteners. Each door will have a weep hole to prevent interior moisture build up.

All door hinges shall be polished 14 gauge 304 stainless steel with a 1/4" diameter stainless steel pin. The hinges shall be mounted to provide easy door adjustment in the future without removing the door liner. The vertically hinged doors shall each have a stainless steel spring loaded door holder. The horizontally top hinged doors shall have a gas charged shock to hold the door in the up position.

Door handles shall be polished stainless steel D-ring style that are spring loaded and bidirectional. They shall be mounted on the doors of compartments with a single door or on the primary door of a compartment with vertical double doors. The latches shall attach to the door assembly without any fasteners penetrating the door skin material, with a rubber gasket provided between the D-ring handle and the door skin. The door latch assembly must be completely enclosed by the door assembly and inner door pan, to prevent damage from shifting equipment carried in the compartment.

The door latches to open the secondary door of a compartment with vertical double doors shall be "lever" style, located on the backside of the door. Once the primary door is opened, the handle shall be easily visible. Full height secondary doors will have the latch at the bottom of the door with all others door heights having the latch at the top of the door.

All hinged doors shall be a "flush" style to provide a flat appearance of the body side. The body shall form a 2" deep frame on all four sides to receive the door, preventing any door overlap. A clip on rubber gasket shall be mounted on the door frame, providing a tight seal to prevent moisture and debris from entering the compartment.

Lap type doors which utilize an outer lip to provide a weather seal, shall not be acceptable.

One (1) Y___N___

All horizontal and vertical side compartment doors shall be fabricated of 16 gauge 304 grade stainless steel.

One (1) Y___N___

A 'J' channel drip rail shall be installed above the compartment doors.

One (1) Y___N___

DOOR OPEN INDICATOR

Each flush door compartment shall have a magnetic style reed indicator switch. Each switch shall be hermetically sealed rated to 10,000,000 cycles. The reed shall be potted in the contact housing with polyurethane and the housings shall be molded fire retardant ABS plastic. The contact and magnetic housing shall snap-lock in the body material, one on the body and one in the door.

One (1) Y___N___

Brushed stainless steel sill plates shall be installed at the bottom of each body compartment door opening.

One (1) Y___N___

HOSE STORAGE

A hosebed shall be provided with a minimum of forty (40) cubic feet of storage space. The hose bed shall have a slotted 1/4" aluminum flooring installed to allow drainage through the tank cavity to the ground below. The aluminum flooring shall be manufactured in discrete sections to allow for easy removal and outstanding stability. The area shall be free of sharp edges to protect the hose when loaded or distributed.

One (1) Y___N___

The walls of the hosebed shall be 90" tall, measured from the bottom edge of the compartments to the top flange.

One (1) Y___N___

HOSEBED AREA TRIMMED W/ BRUSHED SST

The vertical corners at the back hosebed shall be trimmed with brushed stainless steel. The trim shall extend from the hose floor level up to the top edge of the body side.

One (1) Y___N___

The hosebed shall accommodate the following hoseloads:

Qty Size

1500' 4" LDH

500' 3" DJ

250' 2.5" attack hose

right side ladder storage compartment for 24/2 14/1 10' folding

Pre con meeting notes 07-08-2004

this is the new hose bed layout and hose bed capacity

4" on the left of the ladder compartment

size the area above the ladder compartment for either or both the

3" and/or 2.5" which ever is the best fit. If both cannot go on top of the compartment

then one (1) is to go to the left of the compartment with the new divider

Two (2) Y___N___

HOSE BED DIVIDER(S)

There shall be two (2) divider(s) installed in the hose bed. The divider(s) shall be fabricated of 1/4" thick aluminum plate with a double sided reinforcement where it is attached to the adjustable slide rails. The rear of the divider(s) shall have a radius to provide a smooth corner. Hose payout shall be unobstructed by the divider(s).

One (1) Y___N___

TANK CAPACITY

The tank shall be 2000 gallons in capacity.

One (1) Y___N___

TANK LEVEL GAUGE

A Class 1 "Intelli-Tank" tank level gauge shall be mounted on the pump panel. The tank level gauge shall indicate the water level on an easy to read LED display and show increments of 1/8 of a tank. The tank level gauge will utilize a pressure transducer that mounts on the outside of the tank for sensing the water level. No probes shall be installed for the tank. The tank level gauge shall have a super bright LED 4-light display with a visual indication at nine accurate levels. A set of weather resistant connectors to connect to the digital display, to the pressure transducer and to the apparatus power shall be supplied with the tank level gauge. Additional (slave) displays (if requested) are to be easily integrated and will receive data from the same source as the master display. No additional transducers shall be required. The gauge shall be a model ITL.

One (1) Y___N___

STAR™ SERIES - POLYPRENE TANK

TANK SHAPE: The water tank shall be designed to utilize cavities that have commonly been wasted space. The water tank shall extend up and over the rear center compartment to just behind the rear body wall. The water tank shall fill the void between the main hose bed floor and the top of the rear center compartment. Additionally, the water tank shall be designed with an extra large sump area that drops down below the body substructure and nests between the chassis frame rails. The enlarged sump shall drop at least 10” below the main tank floor. This tank design shall provide for a lower overall tank height, resulting in a lower overall main hose bed height. In addition, this design shall create a lower center of gravity of the vehicle, for improved vehicle handling. NO EXCEPTIONS

TANK CONSTRUCTION: The booster tank shall be constructed of 1/2" thick polyprene sheet stock which is a non-corrosive stress relieved thermoplastic. It shall be designed to be completely independent of the body and compartments. All joints and seams are extrusion welded and/or contain the "Bent Edge" and tested for maximum strength and integrity. The top of the booster tank is fitted with lifting eyes designed with a 3 to 1 safety factor to facilitate tank removal.

COVER: The tank cover shall be constructed of 1/2" thick polyprene and shall be recessed. A minimum of two lifting dowels shall be drilled and tapped 1/2" x 2" to accommodate the lifting eyes.

BAFFLES: The swash partitions shall be manufactured from 1/2" polyprene. All partitions shall be equipped with vent and air holes to permit movement of air and water between compartments to provide to provide maximum water flow. All swash partitions interlock and are welded to one another as well as to the walls of the tank.

MOUNTING: The tank shall have a reinforced ¾” floor for added strength and durability. The tank shall be isolated from the body substructure crossmembers with 1/2" x 2 1/2" rubber strips that are 60 durometer in hardness. The tank shall sit nested inside the center body substructure and shall be completely removable without disturbing the body side panels. Tank stops on all four sides will keep the tank from shifting front to back or side to side.

One (1) Y___N___

FILL TOWER: Fill tower base shall measure approximately 25" long x 12" wide x 14" high and incorporate a "anti-surge" baffle inside the tower and the opening shall be approximately 14" x 14". The tower will have a 1/4" thick removable polyprene screen and a polyprene hinged type cover that will open if the tank is filled at an excess rate. There shall be a removable 1/4" thick polyprene screen to prevent debris from falling into the tank. The fill tower shall have a 6" overflow that will discharge underneath the tank, behind the rear wheels. The overflow shall terminate above the tank water level when filled to the rated capacity. A rear secondary tank vent shall be provided to prevent entrapment of air when filling on a decline and will vent next to the overflow.

One (1) Y___N___

The fill tower shall be located in the left front hosebed.

One (1) Y___N___

SUMP: The sump will be constructed of 1/2" polyprene and be located inline with the tank suction valve. There shall be a 4" schedule 40 polyprene tube installed that will run from the suction outlet to the sump location. The tank will have an anti-swirl plate located approximately 2" above the sump.

One (1) Y___N___

The sump shall have a 3" plug for use in draining and cleaning out the tank.

One (1) Y___N___

OUTLETS: In addition to the tank suction valve outlet located in the sump, there shall be an outlet provided for the tank fill valve. If there are any additional options selected (such as an extra tank suction or direct tank inlets), there shall be additional outlets provided to accommodate these items.

One (1) Y___N___

REAR DUMP VALVE

A 10" square Newton brand painted mild steel dump valve shall be installed on the water tank. The valve shall be shall be directly bolted to the water tank. The valve shall be painted flat gray as supplied by vendor. The dump valve shall be equipped with an electric actuator controlled by a toggle switch located near the valve on the apparatus body. The location of the valve control shall be positioned away from the immediate dumping area, but close enough to monitor the dumping procedure.

One (1) Y___N___

The dump valve shall have controls on the right rear face of the vehicle and on the rocker panel in the cab to facilitate remote operation of the valve. An indicator light shall also be provided in the cab to show if the valve is not in the fully closed position.

One (1) Y___N___

The valve shall be located on the flat back wall of the vehicle.

One (1) Y___N___

REAR DUMP CHUTE EXTENSION

there shall be an aluminum tread plate rear dump valve cover with hinge and shall be counterweighted or spring activated to drop with water weight and return to closed with no flow of water.

One (1) Y___N___

SIDE DUMP VALVES

There shall be a painted mild steel dump valve furnished and installed on each side of the vehicle, ahead of the rear axle. 10" square Newton brand painted mild steel dump valves shall be installed on the water tank. The valves shall be shall be directly bolted to the water tank. Each dump valve shall be equipped with an electric actuator controlled by a toggle switch located near the valve on the apparatus body. The valve shall be painted flat gray as supplied by vendor. The location of the valve control shall be positioned away from the immediate dumping area, but close enough to monitor the dumping procedure.

One (1) Y___N___

The valves shall be located on the left & right side of the apparatus body to facilitate easy, 'drive-by' dumping.

Two (2) Y___N___

The dump valve shall have controls mounted directly adjacent to the valve and in the chassis cab of the apparatus to facilitate remote operation of the valve. An indicator light shall also be provided in the cab to show if the valve is not in the fully closed position.

Two (2) Y___N___

The dump valve shall have a brushed stainless steel door that shall open or close with actuation of the dump valve.

Two (2) Y___N___

FIXED UNPAINTED CHUTE EXTENSION

There shall be an unpainted stainless steel fixed dump valve extension installed on the 10" square dump valve provided. The chute shall be unpainted, for a pleasing appearance.

The chute is mounted, via bolting to the dump valve and extending to the side wheel well panels and be fixed in place. The dump valve door to be brushed stainless steel and mounted with counterweight hinge to allow for water weight to open the door and no water weight to cause the door to spring up into closed position.

One (1) Y___N___

LADDER MOUNTING

There shall be a free standing, permanently mounted, ladder compartment provided with a a hinged, full width door on the rear of the compartment. The door shall be equipped with a push button style latch and a mechanical hold open device. The door shall also be switched to the "Open Door Indicator Light" in the cab to alert the driver if the door is not closed.

One (1) Y___N___

The compartment shall be fabricated of .125" smooth aluminum with the door made of .125" diamond plate.

One (1) Y___N___

The compartment shall be mounted on the left side of the hose bed.

One (1) Y___N___

The compartment shall be large enough for one (1) 14 foot aluminum roof ladder and one (1) 24 foot two section Duo-Safety aluminum extension ladder to be stowed horizontally on individual brackets so one item may be removed without disturbing the others. There shall be a stop in the front of each compartment to prevent the items from sliding forward.

One (1) Y___N___

HINGED FOLDING TANK CARRIER

There shall be a hinged folding tank carrier installed at the side of the apparatus body above the compartments specified. The hinged tank carrier shall fold down to provide easy access to the folding tank assembly. The tank carrier shall be fixtured by a full-length stainless steel piano hinge. Heavy duty steel cabling shall hold the carrier away from the apparatus compartments when lowered to the 'down' position. The carrier shall have grab handles on each side to assist in raising and lowering. The rack shall be held in the 'stowed' position by a positive lever locking device, one front and one back.

One (1) Y___N___

The tank rack shall be supplied on the right side of the apparatus and attach to unistrut on the body side.

One (1) Y___N___

The tank carrier shall be fabricated of a tubular stainless steel.

Two (2) Y___N___

HARD SUCTION STORAGE

Two (2) hard suction hose carrier(s) shall be provided. The carrier(s) shall be constructed of aluminum and anodized for a durable, long lasting finish. There shall be (2) hold-downs, one at each end, which shall hold the hard suction hose on each tray.

Two (2) Y___N___

Two (2) hard suction carrier(s) shall be located on the left side above the apparatus compartments.

precon meeting notes 07-08-2004

the hard suction trays are for 15' long hard suctions

Two (2) Y___N___

ASSIST STRAPS

There shall be two (2) nylon strap(s) installed on the lift up door specified above to aid in operation. The strap shall be attached at each end to the door liner and have a 10" loop hanging down.

One (1) Y___N___

COMPARTMENT DIVIDERS

Sheet metal compartment dividers shall be installed in the over-wheel compartments. These dividers shall aid in keeping loose equipment from falling into the front and/or rear compartments.

One (1) Y___N___

SHELVING

Each shelf shall be fabricated of .190 thick aluminum sheet material with the outside and inside edges flanged up to prevent equipment from sliding off of the shelves. Each shelf shall be as wide as possible to allow proper attachment to the above described unistrut channels. Shelves shall be adjustable up and down. Shelving shall be supplied in the following locations:

Two (2) Y___N___

Two (2) 12.5" deep shelves shall be installed in the 34.5" wide compartment specified.

pre-con meeting note 07-08-2004

changed quantity to two (2)

located in upper compartment L1

One (1) Y___N___

One (1) 25.5" deep shelves shall be installed in the 33.5" wide compartment specified.

pre-con meeting notes 07-08-2004

changed quantity to one (1)

locate in lower compartment L1

price is on change order

One (1) Y___N___

ROLL OUT TRAY(S)

There shall be roll out tray(s) furnished and installed in the compartments specified. They shall be fabricated of 3/16" thick 3003 grade or higher aluminum with four side flanges, corner welded for maximum strength. The following shall be supplied:

One (1) Y___N___

There shall be one (1) roll out tray(s) installed in the specified compartment(s). The tray shall be approximately 28" wide and 24" deep. Each roll-out system shall be bolted to the compartment floor for rigid and sturdy mounting. The tray shall be mounted to a Slide Master slide unit. The roll-out tray shall be rated for 600 lbs. and extend 70% of the slide capacity.

Pre-con meeting notes 07-08-2004

added this tray at precon meeting

locate the tray in compartment L4 on the floor

price is on change order

Two (2) Y___N___

REAR FENDERETTES

Two (2) flexible rubber fenderettes shall be provided on the body rear wheel well openings, one (1) each side. A dielectric barrier shall be provided between the fender crown fasteners (screws) and the fender sheet metal to prevent corrosion.

One (1) Y___N___

OVERLAYS

All aluminum used in an overlay area shall be bright type 3003, 1/8" thick diamond plate material coated with 3M sealant and adhesive on the back sides to protect and to put an insulating barrier between dissimilar metals to assist in corrosion resistance.

The following areas shall have aluminum diamond plate overlays installed:

- The front faces of the apparatus compartments as well as the front header of the hosebed area.

- The entire back of the apparatus body including both the side compartment and rear compartment back areas.

One (1) Y___N___

The catwalks shall be painted to match the body color.

One (1) Y___N___

RUBBER GRIP INSERT HANDRAIL SPECIFICATIONS

All handrails shall be 1 1/4" in diameter, constructed of extruded aluminum with rubber grip inserts. There shall be chrome plated brackets with a rubber gasket installed between the body and the bracket. There shall be a 2" minimum clearance between the bracket and the body. The

following handrails shall be installed at the approximate lengths noted:

One (1) Y___N___

RUBBER GRIP INSERT HAND RAILS

There shall be three (3) hand rails installed on the rear of the apparatus. Each hand rail shall provide approximately 42 inches of gripping area for personnel. Each hand rail shall be constructed of an aluminum extrusion with three (3) rubber inserts to provide a positive grip. The handrails shall be spaced away from the body using chrome plated ends. Two (2) vertical hand rails shall be installed, one on each side, just below the hose bed sides. The remaining hand rail shall be installed horizontally, just below the hose bed area.

One (1) Y___N___

10" HANDRAILS

Two (2) 10" handrails shall be mounted one (1) on each side of the pump compartment above the pump panel.

One (1) Y___N___

10" HANDRAILS

Two (2) 10" handrails shall be mounted one (1) on each side of the apparatus body near the top of the compartments.

One (1) Y___N___

REAR TOW EYE

There shall be a rear tow eye attached to the frame rails. The location of the tow eye shall be below the rear center compartment.

The tow eye shall be manufactured of 1" plate steel that is bolted to the chassis frame rail with a minimum of 6 grade 5 bolts. The plate shall be braced to the opposite frame rail to offset forces placed at an angle to the chassis frame.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Electrical - 5.240 12/24/03 ==

One (1) Y___N___

ELECTRICAL MANAGEMENT SYSTEM

The apparatus shall be equipped with a Multiplexed Electrical System. The multiplex system shall consist of all solid-state components contained inside aluminum extrusions referred to as nodes. Each node shall consist of (24) output channels and (24) input channels. All inputs and outputs will be configured into a scaleable electrical harness utilizing Duetsche connectors. The nodes must be waterproof and not require special mounting requirements.

The system, at a minimum, shall be capable of performing the following functions: load management sequencing, switch loads, receive digital and analog signals, perform and report diagnostics, continuously report vehicle status and the system is expandable.

“Real Time” data can be reported and displayed through several operator interface modules. The VFD is the display, user interface display. As an option the EL “Vista” provides a built-in, audible alarm and menu-driven, input switches.

Placement of nodes throughout the apparatus enables a reduction in wire harness bundles, elimination of redundant harnesses and separate circuit boards, relay and circuit breakers, electrical hardware, separate electrical or interlock subsystems and associated electronics for controlling various electrical loads and inputs.

The multiplex system shall be field-re-programmable and re-configurable by any authorized dealer or service center. This complete system shall eliminate the need for the following separate components or devices: load manager, load sequencer, warning lamp flasher, headlamp flasher, door open notification system, interlock modules, separate volt meter and ammeter and temperature monitor.

The Base System Shall Include:

Total Load Management

Load Shedding Capabilities

Load Sequencing Capabilities

“On-Board” Diagnostics Readout

Very Reliable, Solid-State Hardware

Error Reporting

Display Analog Data (pressure, temperature…)

Continuous system monitoring and reporting

Emergency warning lamp flasher

Door Ajar System

Field Configurable

Expandability Capabilities

Advanced PC Diagnostics

As-built wiring harness drawings and a master circuit list of electrical circuits that the apparatus builder installs shall be furnished in the delivery manuals. These schematics must show the electrical system broken down into separate functions, or small groups of related functions. Schematics shall depict circuit numbers, electrical components, harnesses, and connectors from beginning to end. A single drawing for all electrical circuits installed by the apparatus builder shall not be accepted.

One (1) Y___N___

LED DOT LIGHTING

There shall be five (5) lights located on the rear of the vehicle. Three (3) of the lights shall be mounted as high as possible on the rear face of the body for use as identification lamps. Two (2) lights shall be located as high and wide as possible, one each side, for use as clearance lamps. There shall be two (2) additional lights between the front and rear axles for identification and turn signaling as required. The lights shall be Weldon brand 9186-1500 series LED red and amber markers.

One (1) Y___N___

REAR TAIL LIGHT CLUSTER

There shall be a rear tail light cluster furnished and installed in a polished bezel at the rear of the apparatus, one each side. The 4684-0200 series cluster shall be manufactured by Weldon Technologies, Inc. and consist of the following:

1 - Weldon LED series red brake light

1 - Weldon Clear backup light (Halogen)

1 - Weldon LED series amber turn signal light populated in the shape of an arrow

Each tail light cluster shall be mounted on a removable panel for easy access to the electrical distribution centers at each rear corner of the apparatus body.

One (1) Y___N___

REAR SCENE / BACKUP LIGHTS

The scene/reverse lights shall automatically turn on when the parking brake is engaged and shut off when the parking brake is disengaged.

One (1) Y___N___

PUMP/TRANSVERSE COMPARTMENT LIGHTING

There shall be one (1)12 volt work light(s) installed in the pump/transverse compartment. Each light shall be activated with a switch located on each light and shall be enclosed in an ABS case. Each light head shall be removable and have a retractable wire that can be extended a minimum of 10 feet to allow maintenance personnel to relocate and direct the light as needed.

One (1) Y___N___

COMPARTMENT LIGHTING

There shall be two (2) lights mounted in body each compartment. There shall be one light on the forward wall and one light on the rear wall. Each light shall be mounted in such a way that it is vertically adjustable with wiring slack to allow for future repositioning. The lights in each compartment shall be on a separate circuit, turning on only those lights that have open compartment doors. The lights shall be manufactured by Weldon and be model #2030.

Two (2) Y___N___

LIFT-UP DOOR LIGHTING

There shall be two (2) lights mounted in the two (2) lift-up doors specified. The lights shall be installed recess-mounted in each compartment door liner. These lights shall illuminate the ground and the compartment area below. The lights shall be mounted in a rubber grommet and shall be switched to illuminate when the compartment door is open. The lights shall be clear Truck-Lite brand model #40003.

One (1) Y___N___

UPPER LIGHTING PACKAGE

The following NFPA lighting package, manufactured by Whelen, shall be supplied and installed in the upper areas of the vehicle.

One (1) Y___N___

ZONE A: There shall be a 72" lightbar furnished and installed with a total of ten strobe heads. The bar shall have a total of eleven sections with red in eight sections towards the front and two positions being clear with the center being black. The ends colors shall be red. The rear of the bar shall all be red with the center being black. The clear lights shall be deactivated when the parking brake is set. The lightbar shall be the Edge 9M series model # 9M387NV.

One (1) Y___N___

ZONES B&D: The side forward area shall be covered by the Zone A lighting.

One (1) Y___N___

ZONE C: There shall be two (2) beacons furnished and installed in the upper outer corners of the rear of the apparatus. They shall each have a halogen rotator and be model # RB6.

One (1) Y___N___

The left lens shall be red and the right lens shall be amber.

One (1) Y___N___

LOWER LED WARNING LIGHTING

One (1) Y___N___

ZONE A: The warning lights shall be supplied as previously described in the custom chassis portion of the specification.

Six (6) Y___N___

ZONES B&D: There shall be six (6) LED lights, 4" high x 6" wide, surface mounted along the sides of the apparatus. Whelen brand model 60 LED lights shall illuminate Zones B & D as defined by the latest version of NFPA 1901 pertaining to Lower Zone Warning Lighting.

Six (6) Y___N___

Six (6) lights specified shall be red LED's.

One (1) Y___N___

ZONE C: There shall be two (2) LED lights, 4" high x 6" wide, mounted on the rear of the apparatus body specified. Whelen brand model 60 LED lights shall illuminate Zone C as defined by the latest version of NFPA 1901 pertaining to Lower Zone Warning Lighting.

Two (2) Y___N___

Two (2) lights specified shall be red LED's.

One (1) Y___N___

LOWER ZONES B&D LIGHT HOUSING

A light housing shall be used for the rearmost warning light in zones B&D to ensure the light is mounted as far rearward as possible.

One (1) Y___N___

HOSEBED SPOT AND FLOOD LIGHTS

There shall be two rear deck lights, one spot and one flood, furnished and installed at the rear of the apparatus. The Unity brand lights shall be 6" in diameter and be 50 watts each.

One (1) Y___N___

12 VOLT SCENE LIGHTS

One (1) Y___N___

One (1) Y___N___

There shall be one (1) pair of scene lights furnished on the sides of the cab, one (1) each side. They shall be 9" wide x 7" tall and have a built in downward angle. They shall be manufactured by Whelen and be model 900CA0CR.

pre-con meeting notes 07-08-2004

added this set of scene lights to side of cab

deleted the forward scene lights shown on the print - on print in error

price is on change order

all below lights to be switch on the Vista Display

label "left side scene", "right side scene," "rear scene"

One (1) Y___N___

The scene lights shall be activated by a switch on the rocker switch panel.

One (1) Y___N___

One (1) Y___N___

There shall be one (1) pair of 12 volt scene lights furnished. The lights shall be mounted on the body sides. They shall be 9" wide x 7" tall and have a built in downward angle. They shall be manufactured by Whelen and be model 900CA0CR.

One (1) Y___N___

The scene lights shall be activated by a switch on the rocker switch panel.

One (1) Y___N___

One (1) Y___N___

There shall be one (1) pair of 12 volt scene lights furnished. The lights shall be mounted on the rear of the apparatus, one each side. They shall be 9" wide x 7" tall and have a built in downward angle. They shall be manufactured by Whelen and be model 900CA0CR.

One (1) Y___N___

The scene lights shall be activated by a switch on the rocker switch panel.

One (1) Y___N___

HONDA 5k GENERATOR

There shall be a 5000 watt 110 volt electric start generator with automatic idle and recoil back up furnished with the apparatus. The electric start shall be adjacent to the generator. It shall be manufactured by Honda and be model # EM5000SXK1A.

precon meeting notes 07-08-2004

generator to be dealer supplied and installed

generator to be EM5000 model Honda

Crimson to install power/ground disconnect to circuit panel in right rear compartment

Gen set dimensions are 26.75" wide x 20.75" deep x 21.5" high

One (1) Y___N___

GENERATOR MOUNTING

The generator shall be mounted in the rear side compartment of the apparatus.

One (1) Y___N___

There shall be one (1) roll out tray(s) installed in the specified compartment(s). The tray shall be approximately 40" wide and 24" deep. Each roll-out system shall be bolted to the compartment floor for rigid and sturdy mounting. Each rollout tray system shall incorporate a pneumatic hold-open and closed device. This system eliminates the need for clumsy latching devices and firmly holds the tray in the open or closed position.

precon meeting notes 07-08-2004

Crimson Fire to install slide out tray in compartment R4 to match compartment width and generator dimensions

One (1) Y___N___

GENERATOR QUICK CONNECTION

The generator shall be installed with a coupler type connection to allow the unit to be removed from the apparatus for mobility.

One (1) Y___N___

LOAD CENTER

There shall be a electrical load center furnished and installed in a protected environment. The load center shall have provisions for eight (8) 20 amp manual reset type circuit breakers.

One (1) Y___N___

The load center shall be located in the same compartment as the generator.

One (1) Y___N___

OUTLETS

The following outlets shall be supplied on the apparatus and be live when the generator is running;

Four (4) Y___N___

- There shall be four (4) outlet(s) installed in the following specified location on the apparatus. The outlet(s) shall be 120vac/20 amp twist lock (NEMA L5-20), single receptacle with a weatherproof cover.

One (1) Y___N___

- One (1) outlet(s) shall be located in the wheel well area on the driver's side of the apparatus.

One (1) Y___N___

- One (1) outlet(s) shall be located in the wheel well area on the passenger's side of the apparatus.

One (1) Y___N___

- One (1) outlet(s) shall be located inside the chassis cab.

One (1) Y___N___

- One (1) outlet(s) shall be located inside the apparatus compartment(s) specified.

One (1) Y___N___

TELESCOPING LIGHTS

Two (2) Y___N___

Two (2) lightheads shall each be 500 watts, 120 volt. Each entire light assembly shall be UL Listed for the fire service. The telescoping lights shall be manufactured by GFE Manufacturing.

Two (2) Y___N___

The lightheads shall each be equipped with an on/off switch.

Two (2) Y___N___

Two (2) light pole(s) shall have a friction type lock to hold the pole in the extended position. Each shall be raised from the top with a grab handle located on the light head. There shall be a retractile cord at the pole bottom, connected to the circuit breaker panel on the apparatus.

Two (2) Y___N___

Two (2) lights shall be mounted in the forward corners of the pump compartment, towards the chassis cab.

One (1) Y___N___

ELECTRICAL CORD REELS

One (1) Y___N___

There shall be a Hannay ECR-1616-17-18 series electric rewind cord reel furnished and installed on the apparatus. A push button switch to activate the rewind shall be located next to the reel. There shall be a four way roller assembly mounted on the reel to guide the cord on and off of the spool. There shall also be a cord stop supplied. The reel shall come equipped with 200 feet of yellow 10-3 electrical cord.

One (1) Y___N___

The cord shall be hardwired to a Circle D remote power distribution box with (4) four receptacles. The distribution box shall be stored in a mounting bracket when not in use. The box shall be equipped with a light to indicate when distribution box is energized.

The distribution box shall be equipped with the following receptacles:

Position 1: NEMA ________ R

Position 2: NEMA ________ R

Position 3: NEMA ________ R

Position 4: NEMA ________ R

One (1) Y___N___

The cord reel shall be located above the pump in the dunnage area.

One (1) Y___N___

== Heavy Duty Pumper/Tanker Extras - 5.240 12/24/03 ==

One (1) Y___N___

UNDERCOATING

One (1) Y___N___

Because the apparatus is constructed of materials that are weather and corrosion resistant, there shall be no undercoating provided on the apparatus.

One (1) Y___N___

REFLECTIVE STRIPING

The reflective striping shall be supplied and installed by the dealer.

One (1) Y___N___

DOOR LETTERING

One (1) Y___N___

LICENSE PLATE BRACKET

Provisions for mounting a license plate shall be installed on the apparatus in conjunction with the proper illumination to meet DOT requirements.

One (1) Y___N___

EQUIPMENT

The following equipment shall be supplied by the Apparatus Manufacturer:

One (1) Y___N___

GROUND LADDERS

One (1) Y___N___

- one (1) Duo-Safety 24' two (2) section aluminum extension ladder(s), model 900A

One (1) Y___N___

- one (1) Duo-Safety 14' aluminum roof ladder(s) with folding hooks, model 775A

One (1) Y___N___

- one (1) Duo-Safety 10' folding aluminum attic ladder(s), model 585A

One (1) Y___N___

HARD SUCTION HOSE

Two (2) Y___N___

HARD SUCTION HOSE

Two (2) 15' length(s) of 6" clear PVC hose(s) with lightweight couplings shall be supplied and installed on the apparatus.

One (1) Y___N___

STRAINERS

One (1) Y___N___

Dealer Provided Strainer

One (1) Y___N___

Foam 5 gallon pails

One (1) Y___N___

Deck Gun 8297-98

One (1) Y___N___

Deck Gun nozzle Sm-1250

Two (2) Y___N___

Elkhart foam Eductors #240-125

One (1) Y___N___

Nozzles

One (1) Y___N___

Firecom Intercom system

One (1) Y___N___

Adapters

One (1) Y___N___

precon meeting notes 07-08-2004

the wheel simulators will be dealer supplied and installed

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Related download
Related searches