KAKAMEGA FEASIBILITY REPORT
Perennial river with catchment area of 479km2 and 95% duration flow of 1.5m3/s. Future (year 2025) water demand in Kakamega projected to be 21,676m3/d or 0.25m3/s. This is well below the 95% duration flow of the river. River Isiukhu has sufficient water to meet the Municipality’s future water demand. ii) Old Intake Works (1956) Consists of: ................
................
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- south dakota school report card
- state of tn report card
- state school report card
- student report cards samples
- kentucky school report cards
- wisconsin school district report cards
- wisconsin state school report cards
- tennessee department of education report card
- tennessee report card
- texas school report cards
- tn education report card
- tn report card data