Edge.rit.edu



Team: _19416______________ Engineer: __Tim Turner_________________________What were the outcomes of the prior phase?I planned to meet with Sarah as a group to discuss material options, to communicate with our sister group so we can each stay in the loop, benchmark other toilets, come up with conceptual drawings, and download/learn Fusion 360.Someone in the group accomplished all of these goals except meeting with Sarah, and I didn’t download Fusion 360 yet because it isn’t confirmed if we need it.I learned we often get less accomplished than initially planned, and things usually take twice as long as expected.Team level goal for next phaseTo come up with an acceptable 3D model for our system, run simulations and gather data to further improve our design going forward.What do I plan on doing to ensure that my team has a successful review at the end of the next phase?Download and learn Fusion 360. (2 days, 10/20)Meeting with Sarah to discuss material options in Haiti (1 hour, Week 9)Draw some initial CAD drawings of our system (2 days, 10/25)Simulate stresses on the 3D model.(1 hour, 10/28)Gather simulation data to further streamline our 3D model. (1 hour, 10/28) ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download