CV



25400-1054100SUMMARY OF QUALIFICATIONSCurrently a PM/CM & Supervision professional in Qatar for twelve(12) years and spearheaded the construction and supervision of sixteen iconic high rise hotel/office towers for Qatar Petroleum District project, Qtel Tower & City Center Hotel Towers and currently a registered license Grade-A category Electrical Engineer with the UPDA-Engineering Committee. Fully aware of the local authority regulations of Qatar such as Kahramaa, QCDD, Qtel, MOI-SSD guidelines, QCS, NFPA-70 ,72 & 101 for fire life safety, BS Standards, CIBSE and relevant International Building Codes. Work experience includes projects in the KSA and USA during 1988-2004 involving Building Services design, Infrastructures projects and facility maintenance for Saudi Aramco DCS plant wide Modernization project. Total prior work experience with an international firm consulting environment of more than 20+ years in the U.S. , Saudi Arabia and Qatar with a variety of consultancy firms involving Design, PM, CM, Supervision and Facility Maintenance for Power, Lighting system distribution Fire Alarm Detection System and a diverse ELV systems. PROFESSIONAL EXPERIENCEKEO International Consultants, Doha QatarElectrical Engineer(Core Team/Supervision) & Construction Management January 2012 - PresentCurrently working with the core team for the execution of the Qatar Petroleum District project composed of ten high rise towers having 1 nos. primary Substation and 7 nos. Substations, Generator Plant rooms, UPS rooms, Fire Command Center, QP-IT/Telecom rooms, Central/Local Facility Command Center and Central Battery System Units for normal/emergency power supply of the project. Reviews and approves shop drawings/materials submitted by the Contractor and ensures the level of completeness for each specific electrical systems for power distribution, Lighting system, Fire Alarm system, Central Battery system including other diverse ELV Systems and in accordance with the local authority regulations and international codes and standards. Provides technically inclined comments and reviews the material submittals in conformance with the requirements of the project specification with respect to Qatar local authority guidelines. Ensures proper approval of MV panels, Capacitor banks, MCC panels, SMDB panels, ATS for emergency change-over facility from normal to emergency/UPS power including FA System, Central Battery System and reviews the Genset sequence of operation complying Kahramaa requirements. Monitors the daily progress on site for the 7 nos. Substations prior to Power-On schedule and routine check the daily activity of the contractor/specialist and issues NCR for ongoing installations having non-conformance to local regulations and ensure the proper sequence of works for cable containments, cable routing/testing/glanding/lugs crimping/torque testing and final termination, equipment installation, and ensures cable damages are rectified accordingly as per approved Method of Statement to anticipate abortive works at site eliminating request for extension of time from the Contractors. Reviews RFI’s and respond in a timely manner to ensure that the electrical installation are technically sound, constructible, no cost and time impact to the Client and conforms to the local regulations. Conducts material inspection during FAT for functional test prior to MIR of equipment deliveryEDUCATIONB.S. in Electrical Engineering, Cebu Institute of Technology, Philippines, Graduated 1984Project Management Foundation Course-PM02, Educational Services Institute International(ESI) U.K., Dubai U.A.E.-2006PROFESSIONElectrical EngineerNATIONALITYFilipinoMEMBERSHIPSMember-Institute of Integrated Electrical Engineers, Qatar Chapter No. 80, PRC Accreditation No. APO-02Member- Construction Management Association of America, CMAA Member ID #160527LICENSEGrade-A Electrical EngineerUrban Planning Devt. Authority-Eng’g. Committee, QatarLicense #4490LANGUAGESEnglish, Arabic, Tagalogat site and in accordance with approved material submittals and local authority requirements. Attends weekly Client progress meeting , MEP technical meeting, workshops to resolve pending issues for Electrical, FA System & other ELV systems installations and liaising with the local authorities. Ensure proper segregation of circuits and inspects building earth/clean earth networks installations for compliance with the project requirements. Reviews and approves Operation and Maintenance Manuals in preparation for the final handing over and ensures snagging and NCR’s are executed/rectified by the Contractor accordingly.AECOM MIDDLE EAST, Doha, QatarElectrical Engineer, Project Management March 2007 – December 2011Representing the client for the project management overseeing the MEP consultant, main contractor, subcontractor specialists and third party inspectors for the two sites which consists of 50 floors plus 3 basement levels for each of the five hotel high rise towers(Marriot Renaissance, Marriot Courtyard, Shangri-La, Rotana, Merweb 5-Star Hotels). The project also consists of podiums on each site, 7 storeys above ground level with 3 levels of parking basements finance by Al Rayyan Tourism Investment Company(ARTIC) owned by Sheikh Faisal Bin Qassim Al-Thani and Al Faisal Holdings. Assist and occasionally presides weekly MEP technical meetings, QA/QC meetings, workshop/statatury requirement meetings and monitoring of MEP work activity programs to ensure consultant and MEP contractors are in conformance of the project target completion dates and complies with the project specifications. Reviews all shop drawings for various electrical installations such as Small Power System, Lighting System, Fire Alarm System, Central Battery System, ELV Systems, BMS System, BACS(Building Automation System) and Guest Room Management System to ensure MEP consultants are complying according to project requirements and the Qatar local authority requirements such as Kahramaa, QCDD, MOI-SSD, Qtel QCS and NFPA-70, 72 and 101 for fire life safety requirements. Approves and reviews RFI’s, EI’s(Engineers Instructions), WRI’s(Work Inspection Request), NCR’s(Non Conformance Report) and FOR’s(Field Observation Report). Reviews fabrication drawings and scrutinized conformitaterialsy of local regulations for components and module assembly of MV panels, MSDB panels, MCC panels, Distribution Board panels and FA system control panels/devices submitted by the main contractor to the engineer to ensure proper form types of all panels and discrimination study are taken into consideration prior to the switchgear ordering/manufacturing.Ensures timely approval, procurement and delivery of long lead items from the consultant and main contractor. Reviews material submittals, third party test certificates, compliance test certificate and factory acceptance test certificates for MV equipments.Monitors overall progress of the project and prepares monthly progress report for the Client base on actual site work accomplishments base on activity program schedules. Attends meetings for local statutory requirements associated with Fire Life Safety.Halcrow Yolles Limited, Doha, QatarElectrical Site Engineer, Supervision January 2005 – March 2007Serves as the overall Electrical Supervising Engineer for all matters related to construction quality assurance of electrical works. Monitors the electrical works for conformance with the provisions of the contract tender documents and reviews installation method statement. Review, approves and process all electrical technical submittals to ensure specifications are complied and manufacturer/supplier are within the approved manufacturers list. Coordinates and supervised the work of all electrical activities and operations and monitors contractor’s program, progress reports and material status reports. Received/Action Request for Information(RFI) that applies to electrical works and recommends solutions to resolved issues pertaining to installations on site complying with local regulations specifically Kahraama, Civil Defense and the Qatar Construction specifications. Conducts and approves inspection at site for Power and Lighting System Distribution and Low Current Systems such as Fire Alarm System, Central Battery System, CCTV System, Access Control System, Wireless Access Points System, Telephone and Data System, SMATV System, BMS System and UPS System. Witness testing and commissioning of all electrical works and provides comments and recommendations to ensure tender contract documents and specifications are complied during installation of equipments. Prepares site instructions for approval of resident engineer and proponent and facilitates snagging list for weekly progress report. Review and approves O&M manual, ensures the correctness and completeness of contractors As-Built drawing submittals and review the adequacy and accuracy of punch lists and monitors final completion of work prior to hand over of the project. Performs all other duties as directed by the resident engineer. Previously involved with the design of New Doha International Airport(NDIA) operations facilities and other projects such as Qatar Foundation College of Engineering & College of Bussiness & IT, Gulf Housing 66/11kv Substations and QP Ras Laffan Port Expansion FEED.Saudi Diyar Architectural & Engineering Consultants, KSAElectrical Engineer, Design June 2001– July 2004Conducts site surveys and field verification of existing utilities on site in preparation prior to implementation. Develops electrical design layout for power and lighting distribution system. Prepares building equipment earthing system and lightning protection system. Prepares power single line diagrams and riser diagrams for low current auxiliary systems. Supervision of site power distribution system which involves routing of trench, duct banks, manholes, earthing Inspection pits, underground cable tray routing via cable channels and power equipment installations.Resource Science Arabia Limited, KSAElectrical Facility Engineer, March 1998-March 1999Conducts site inspection for newly constructed projects and provides technical comments and recommendations prior to end user occupancy. Responsible in processing Mechanical Completion Certificates (MCC) for the completion of Saudi Aramco office services capital program projects. Develops engineering design packages, supervision and implementation of projects with contractors to ensure project specifications and local regulations are complied. Leads the facility preventive and periodic maintenance for Saudi Aramco facilities in the eastern province of Saudi Arabia.Siemens-Arabia Electric Limited, KSAFire Protection Designer, August 1997-February 1998Responsible for the design preparation of fire detection and alarm elements arrangement layout drawings base on the equipment list for each area classification. Checks plans according to design changes and implement updated data and information and locates fire detection elements as per the standard schematic diagram. Prepares single line diagram base on the arrangement layout drawings. Provides overall cable and conduit routing for the plant via cable channels routed through cable trays, platforms and steel structures and locate fire alarm elements (i.e. optical/ionization smoke detector, rate of rise heat detector, illumination warning/indication light, siren, strobe light, manual call station, valve/pressure switch, AC shutdown and etc.) in a suitable place accessible to exit routes and walkways within plant vicinity.Saudi Arabian Parsons Limited, KSAEngineering Coordinator, August 1993-April 1997Worked as electrical designer during the design phase of the project and serves as Engineering Coordinator for the project management team during the construction phase. Located on site and reports directly to Saudi Aramco Senior Project Engineer. Responsibilities was to coordinate and review the interfacing of electrical & instrumentation site work installations and conducts site inspections. Supervised and approves contractor’s as-technical submittals, built drawings being done on site. Review and approves contractor’s shop drawings for detailed installation of DCS system equipments and electrical equipments. Overall scope of work for the project covers the electrical/instrument design to replace part of the existing Abqaiq Plant monitoring and control systems with a new Distributed Control System (DCS) which will interface with the existing control system and provide plant wide monitoring network.Zuhair Fayez Architectural & Engineering Consultants, KSAElectrical CAD Engineer, February 1992-December 1992Preparation of lighting system layout, fire protection system layout, earthing and communication system layout, power one line diagrams, street lighting, basketball and soccer field lighting and lightning protection system layout and diverse ELV systems. Preparation of design drawings for residential buildings, admin building, recreation building, mosque and minaret, switch gear building, swimming pool, and various utility buildings. Assist in the preparation of panel schedule and load analysis for Saudi Aramco projects.Nikolakopulos Electrical Consulting Engineers, USAElectrical CAD Engineer, February 1989-March 1991Design drafting and coordination task. Assist in the preparation and design calculation of electrical lighting and power system. Prepares layout for lighting, power, telephone, fire alarms, earthing, riser/ single line diagram and low current systems for commercial buildings in southern California.Parsons-Engineering Science, California, CA, USATechnical Specialist (Instrumentation), October 1988-July 1989Conducts emission source test of various sources including boilers, incinerators, refineries, co-generation plants, power plants and manufacturing process lines. Operate ambient air monitoring stations for all criteria pollutants and a large number of non-criteria pollutants. Design and fabrication of instrumentation systems for monitoring pollutants and process gas streams. Assist in the laboratory analysis and QA/QC calculations, calibration, maintenance and trouble shooting of analyzer instruments. Coordinate test runs with plants control room engineer for power load adjustments.RELEVANT PROJECT EXPERIENCEQatar Petroleum District, Doha Qatar(10 High Rise Towers for offce/hotel/hospital)Al-Sadd Mall, Doha QatarNikki Beach Resort, Doha QatarDoha City Center Expansion, Phase-II, IIIA & IIIB, Qatar(Marriot Courtyard, Marriot Renaisance, Shangri-La, Rotana and Merweb 5-Star Hotels)Q-Tel Office Tower, QatarProject includes palaces, hospitals, universities and hypermarkets, KSASaudi Aramco Facility Management, KSAHadeed Steel Flat Product Facility, KSASaudi Aramco Distribution & Control System (DCS) Upgrade & Modernization Project, KSAAramco Hawtah Industrial & Residential Complex, KSAC o v e r L e t t e rSir,May I have the honor to apply for the position of a Senior Electrical Engineer?in your prestigious company. I am interested to contribute my technical engineering capabilities to your upcoming projects associated with building services involving Project Management, Construction Management and Supervision.I am a qualified Electrical Engineer by profession registered as a Grade-A license with the UPDA-Qatar Engineering Committee. Currently I am involved in the Construction Management and Supervision(Core Team) for the execution of the Qatar Petroleum District project located at West Bay composed of 10(Ten) high rise iconic Office/Hotel Towers with 1(One) Primary Substation and 7(Seven) Substations having a total of 61 nos. 1600Kva transformers and 9 nos. 3000Kva transformers for the entire project power distribution system.Overall projects I have implemented since I relocated in Qatar way back in 2005, I have supervised and headed a total of 16(Sixteen) high rise office/hotel(5-Star) towers namely Qtel Office Tower, Marriott Courtyard Hotel, Marriott Renaisance Hotel, Shangri-La Hotel, Rotana Hotel, Merweb Hotel and the iconic Qatar Petroleum District(10 Towers).Having been in Qatar for the past 12(twelve) years now and I am fully aware of the local authority and statutory requirements such as the Kahramaa Regulation, Qtel, QCDD Regulation, MOI-SSD Guidelines, Qatar Construction Specification, BS Standards, CIBSE and NFPA-70,72 & 101 for fire life safety and other relevant International Building Codes and Standards. Ensures an acceptable workmanship in all MEP installations aligned with the QA/QC procedures, project requirements and local authority statutory requirements.Apart from my local work experience in the State of Qatar, I have previously work in the United States and in the Kingdom of Saudi Arabia for a range of Consultancy firms involving building services design and infrastructure projects with Saudi Aramco oil and gas company for the execution of Process Interface Buildings and Plant Control Rooms for DCS modernization project. I am most confident that my degree in BS Electrical Engineering along with my 20+(twenty) years of job experience qualifies me for this position, in addition I was also previously trained and tasked by Aecom as a designated Fire Warden during the entire project duration to ensure Fire and Life Safety at site.Looking forward to hear for a positive response from your company should my qualifications corresponds to your current requirements. NOC will be provided and attested educational degree university credentials and police clearance are readily available for local immediate transfer of sponsorship. Joining date availability will be on 01 October 2017.Kind Regards,Engr. Reynold A. MoretoMobile: +974 55769338Email: rmoreto@Website: Grade-A Valid UPDA-Engineering Committee License:73342513462073342514605 ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download