SUNK COSTS

1831.1 The grade of the ground under buildings of joist or suspended slab construction having no basements shall not be lower than the lowest surrounding finished lot area grade in order to prevent the accumulation and standing of ground, storm or tide water under such buildings unless provided with other approved means of drainage. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download