SECTION 104

Apply a 1/8 inch thick band of joint adhesive over the cold mat according to manufacturer’s recommendations. The Engineer shall evaluate the difference in elevation of the final surface of adjacent mats each side of the longitudinal joint, at the joint, with a straight edge and by requiring the Contractor to flood the joint surface with water. ................
................