High Temperature Gas Reactor (HTGR) - Component Test ...
[Pages:22]PLN-2763 (INL/MIS-08-14156)
Revision: 0
HIGH LEVEL REQUIREMENTS
High Temperature Gas Reactor (HTGR) Component Test Facility (CTF)
April 2008
DISCLAIMER
This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness, of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. References herein to any specific commercial product, process, or service by trade name, trade mark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof.
PLN-2763 (INL/MIS-08-14156)
High Level Requirements
High Temperature Gas Reactor (HTGR) Component Test Facility (CTF)
April 2008
Idaho National Laboratory Idaho Falls, Idaho 83415
Prepared for the U.S. Department of Energy Office of Nuclear Energy Under DOE Idaho Operations Office Contract DE-AC07-05ID14517
PLN-2763
CONTENTS
ACRONYMS.............................................................................................................................................. vii 1. PROJECT JUSTIFICATION ............................................................................................................. 1 2. ANALYSIS TO SUPPORT THE PROJECT ..................................................................................... 3
2.1 Evaluation of Existing Facilities .............................................................................................. 4 3. IMPORTANCE OF THE PROJECT AND IMPACT IF NOT APPROVED .................................... 1 4. CONSTRAINTS AND ASSUMPTIONS .......................................................................................... 2
4.1 Constraints ............................................................................................................................... 2 4.1.1 Operational Limitations .............................................................................................. 2 4.1.2 Standardization and Standards Requirements ............................................................. 2 4.1.3 Environmental, Safety, and Health Requirements ...................................................... 2 4.1.4 Safeguards and Security Considerations..................................................................... 2 4.1.5 Legal and Regulatory Constraints and Requirements ................................................. 2 4.1.6 Stakeholder Considerations......................................................................................... 3 4.1.7 Limitations Associated with Program Structure, Competition and Contracting, Streamlining, and Use of Development Prototypes or Demonstrations ........................................................................................................... 3
4.2 Assumptions............................................................................................................................. 3 5. APPLICABLE CONDITIONS AND INTERFACES........................................................................ 4
5.1 Compatibility Requirements with Existing or Future Systems ................................................ 4 5.2 Project Interfaces...................................................................................................................... 4 5.3 Resource Requirements and Schedule ..................................................................................... 4 6. DEVELOPMENT PLAN ................................................................................................................... 6 7. REFERENCES ................................................................................................................................... 7
TABLES
Table 1. Summary of existing and planned fluid flow test facilities............................................................. 1 Table 2. Schedule of funding requirements ($1,000).................................. Error! Bookmark not defined.
v
vi
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- sd 1 display customer master record
- study programme data no parameters data logistics
- chamber of commerce number netherlands format
- starting your own business kvk
- conditions of use of the legal entity identifier kvk
- erkende referenten recognised sponsors arbeid regulier
- manual kvk api developers portal
- purchasing associate kvk tech inc
- hiring process a recruiter s perspective of the think like
- the id register
Related searches
- high school reading test pdf
- high school grammar test printable
- high school english test pdf
- diagnostic reading test high school
- printable grammar diagnostic test high sc
- high school aptitude test free
- high school grammar test pdf
- take high school diploma test online
- high cost test worksheet
- online high school diploma test for adults
- high c reactive protein test result
- venous blood gas test labcorp