High Temperature Gas Reactor (HTGR) - Component Test ...

[Pages:22]PLN-2763 (INL/MIS-08-14156)

Revision: 0

HIGH LEVEL REQUIREMENTS

High Temperature Gas Reactor (HTGR) Component Test Facility (CTF)

April 2008

DISCLAIMER

This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness, of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. References herein to any specific commercial product, process, or service by trade name, trade mark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the U.S. Government or any agency thereof.

PLN-2763 (INL/MIS-08-14156)

High Level Requirements

High Temperature Gas Reactor (HTGR) Component Test Facility (CTF)

April 2008

Idaho National Laboratory Idaho Falls, Idaho 83415

Prepared for the U.S. Department of Energy Office of Nuclear Energy Under DOE Idaho Operations Office Contract DE-AC07-05ID14517

PLN-2763

CONTENTS

ACRONYMS.............................................................................................................................................. vii 1. PROJECT JUSTIFICATION ............................................................................................................. 1 2. ANALYSIS TO SUPPORT THE PROJECT ..................................................................................... 3

2.1 Evaluation of Existing Facilities .............................................................................................. 4 3. IMPORTANCE OF THE PROJECT AND IMPACT IF NOT APPROVED .................................... 1 4. CONSTRAINTS AND ASSUMPTIONS .......................................................................................... 2

4.1 Constraints ............................................................................................................................... 2 4.1.1 Operational Limitations .............................................................................................. 2 4.1.2 Standardization and Standards Requirements ............................................................. 2 4.1.3 Environmental, Safety, and Health Requirements ...................................................... 2 4.1.4 Safeguards and Security Considerations..................................................................... 2 4.1.5 Legal and Regulatory Constraints and Requirements ................................................. 2 4.1.6 Stakeholder Considerations......................................................................................... 3 4.1.7 Limitations Associated with Program Structure, Competition and Contracting, Streamlining, and Use of Development Prototypes or Demonstrations ........................................................................................................... 3

4.2 Assumptions............................................................................................................................. 3 5. APPLICABLE CONDITIONS AND INTERFACES........................................................................ 4

5.1 Compatibility Requirements with Existing or Future Systems ................................................ 4 5.2 Project Interfaces...................................................................................................................... 4 5.3 Resource Requirements and Schedule ..................................................................................... 4 6. DEVELOPMENT PLAN ................................................................................................................... 6 7. REFERENCES ................................................................................................................................... 7

TABLES

Table 1. Summary of existing and planned fluid flow test facilities............................................................. 1 Table 2. Schedule of funding requirements ($1,000).................................. Error! Bookmark not defined.

v

vi

................
................