2005 NFC
|2005 NFC |
|Authority: 1972 PA 230 |
|Completion: Mandatory to obtain permit. |
|Penalty: Permit cannot be issued |
Electrical Permit Application
City of River Rouge Building Department
10600 W. Jefferson River Rouge, MI 48218
(313) 842-4209 Fax (313) 842-4208
JOB LOCATION:__________________________________________ DATE:_____________________________
All permit requests must have an address to be processed.
Property ID number Contractor’s signature
Contractor Information:
__________________________________________________________________________________________________
Contractor’s Name License Number Date Issued
__________________________________________________________________________________________________
Address City State ZIP Code
___________________________________________________________________________________________________________
Telephone Number Federal ID Number
___________________________________________________________________________________________________________
Worker’s Compensation Carrier number expiration date Driver’s license
Owner of Property Information:
Owner’s Name:______________________________________________ Phone#:__________________________________________
Owner’s Address: ____________________________________________________________________________________________
Owner’s Address City State ZIP code
Application Fee $25.00
Minimum Permit Fee +$50.00
Both must be paid for plus items:
New home construction $250
(New structure only)
Circuits:
( ) Residential
(First circuit $10, each additional $7)
( ) Commercial
($15 each for the first 25 circuits, ea. additional $10
Connections:
( ) Air Conditioner $15
( ) Above Ground Pool $20
( ) Below ground Pool $30
Buss Ducts/Feeders/Conduit
( ) First 50 ft. $15
( ) Each additional 100 ft. $7
Interruptible Air Conditioner $20
Lighting Fixtures (plugs, switches, lights):
( ) Total number of fixtures
$10 – first 10, $3 each additional 10
Heating/Furnace:
( ) $15 each furnace
Air Cleaner or Humidifier:
( ) $5 each
Services, Subpanel, etc.:
( ) $30 100 amp
( ) $40 over 100 thru 400 amp
( ) $50 Over 400 amp
Smoke and/or Heat Detectors:
$____ $5 each
Failure to Secure a Permit
$100 _____
Re-Inspection Fee $50 ____
(not ready or unattainable or unapproved)
$____ $50 non permit-able item
$____ $25 per rough inspection
Registration: ($15 Reg, $15 Processing) $30
TOTAL PERMIT FEES
$__________
Total Cost of Construction Job: $___________
Construction value is required to process permit.
This is not a permit. Installation may not commence until an Electrical permit has been secured. A copy of the permitee’s State of Michigan Photo ID/Driver’s license is REQUIRED. A copy of the licensee’s State of Michigan Electrical License is REQUIRED (Registration fee $30). An original application with original signatures must be submitted for processing. Self addressed stamped envelopes must be submitted with all mail-in permits.
Section 23a of the State Construction Act of 1972, 1972 PA 230, MCL 125.1523A, prohibits a person from conspiring to circumvent the licensing requirements of this state relating to persons who are to perform work on a residential building or a residential structure. Violators of section 23a are subject to civil fines.
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- pdreport us
- emergency vehicle operation
- micigan department of corrections
- hiring procedure for substitute bus drivers
- request to protect information michigan department of
- latest updates Últimas novedades michigan immigrant
- new driver orientation toolboxtopics
- initial foster adoption home evaluation michigan
- foreword university of michigan
Related searches
- po box 2005 greenville tx
- 2005 events timeline
- 2005 events in america
- year 2005 events timeline
- 2005 f150 5 4 engine diagram
- major events 2005 2015
- major events from 2005 to present
- 2005 major events in america
- important events in 2005 in usa
- 2005 ford 4 6 engine specs
- historical events in 2005 2010
- significant events 2005 present