The City of Sheboygan Falls – Sheboygan Falls, Wisconsin



Appendix 14A1General Building Permit and Inspection FeesA.OneFamily and TwoFamily Residences–New Construction –1.Plan Examination$ 100.002.Inspections (including general construction, energy, heating, and ventilation inspection)400.003.State Stamp 50.004.Excavation 25.005.Stormwater/erosion control 75.006.Trade PermitsElectric 150.00Plumbing 75.00HVAC+ 75.00Subtotal$950.007.Construction–based on floor area1,200 to 1,800 sq. ft.$300.00Total Permit Fee $1,250.001,801 to 2,400 sq. ft. $350.00Total Permit Fee $1,300.002,400 > sq. ft. $400.00Total Permit Fee $1,350.00B.OneFamily and TwoFamily Residences–Additions –1.Plan Examination$ 100.002.Inspectionssee G below3.State Stampnone required4.Excavation 25.005.Stormwater/erosion control 75.006.Trade Permits (If Required)HVAC….75.00Electric150.00Plumbing+ 75.00Subtotal$700.007.Construction–based on floor area 1 to 300 sq. ft.$100.00Total Permit Fee - $800.00301 to 500 sq. ft.$150.00Total Permit Fee - $850.00500 + sq. ft.$200.00Total Permit Fee - $900.00C.Miscellaneous – NOTE: $25.00 minimum on all permit fees1.Other structures, alterations, siding, and repairs:$5.00 per $1,000.00 – minimum $25.002.Garage and accessory building$25.00 plus $0.20 per ft2 3.Driveway and concrete slab$50.004.Fence permits (includes Excavation Fee)$35.005.Yard shed permits$5.00 per $1,000.00 – minimum $35.006.Swimming pool permits$50.007.Flammable liquid storage$5.00 per 1,000 gallons of capacity – minimum $50.00$100.00 maximum8.Wrecking and razing (all buildings)$25.009.Moving building over public ways (all buildings)$100.00D.Electrical Permits –1.Remodel and additions (Plus applicable Inspection Fees).$75.00E.Plumbing Permits –1.Remodeling and additions (Plus applicable Inspection Fees).$75.002.Sprinkler systems (includes Fire Department Inspection)$150.003.Sewer lateral repair or replacement.$50.004.Clearwater compliance inspections$50.00F.Heating, Ventilation, and Air Conditioning (HVAC) Permits –1.Hot water and steam systems:a.New installation$40.00b.Replacement boiler to existing piping$30.00c.Install additional radiation to existing system$30.002.Warm air heating systems:a.New installation$40.00b.Replacement furnace to existing duct work$30.00c.Install additional radiation to existing duct work$30.003.Central air conditioning:a.New installation$40.00b.Replacement central air$30.004.Air to air heat exchanger new installation$30.005.Conversions $30.006.Oil or gas burner assembly$30.007.Unit heaters gas or oil fired per unit$30.00G.Electrical and Plumbing Inspection Fees –1.New Home electrical and plumbing, start single family$330.002.New Home electrical and plumbing, start two family$550.003.Manufactured home installation without foundation$110.004.Manufactured home installation with foundation$220.005.Residential Additions:a.Additions$110.00b.Additions with plumbing alterations$165.006.Remodeling:a.Remodeling opening walls (rewiring)$110.00b.Remodeling opening walls with plumbing$165.00c.Finished basement...$110.00d.Finished basement with plumbing$165.007.Residential Accessory Uses:a.Attached Garages$110.00b.Detached Garages (rough/final)$110.00c.Sheds, Gazebos$55.00d.Pool (in ground)$110.00e.Pool (above ground)$55.008.Residential Electrical:a.Electrical service upgrade/installation$55.00b.Electrical wiring ONLYsee inspector9.Residential Plumbing:a.Residential plumbing ONLYsee inspectorAppendix 14A2Street Opening Permit Fee ScheduleSTREET SURFACE TYPERepair ChargeGravel$80.00 L.S.Bituminous/Gravel$10.00/S.F.*Portland Cement Concrete$8.00/S.F.*Bituminous over Concrete or Brick$14.00/S.F.*Sawing Fee$10.00/L.F.Minimum Sawing Fee$53.00Curb Replacement$46.00/L.F.Permit Fee$50.00*Minimum Fee $50.00Section 3.Repealing and Recreating Code. Appendices 14B-1 (Commercial Building Permit Fee Schedule) and 14B-2 (Commercial Inspection Fee Schedule) are hereby repealed and recreated to read as follows:Appendix 14B1Commercial Building Permit Fee ScheduleA.New Construction –1.Plan Examination (with no state-approved plans)$ 100.002.Inspections See separate Appendix3.State stampNone required4.Excavation 10.005.Stormwater/erosion control 50.006.Trade PermitsElectric 75.00Plumbing 75.00HVAC 75.007.Construction–based on total cubic feet ($20.00 minimum)mercial, business, institutional andoffice buildings$5.00 per 1,000 ft.3b.Manufacturing and industrial building$4.00 per 1,000 ft.3 B.Remodeling/Additions –1.Plan examination (with no stateapproved plans)$ 75.002.InspectionsSee separate Appendix3.State StampNone required4.Excavation 10.005.Stormwater/erosion control 50.006.Trade Permits (If Required)Electric 75.00Plumbing 75.00HVAC 75.007.Construction–based on floor area 1 to 300 sq. ft. 50.00301 to 500 sq. ft. 75.00500 > sq. ft..100.00C.Electrical Permits – 1.Remodel and additions.$100.00D.Plumbing Permits –1.Remodeling and additions.$100.002.Sprinkler systems (includes Fire Department Inspection)$150.003.Sewer lateral repair or replacement.$50.004.Clearwater compliance inspections$25.00E.Heating, Ventilation, and Air Conditioning (HVAC) Permits –1.Hot water and steam systems:a.New installation$40.00b.Replacement boiler to existing piping$30.00c.Installation additional radiation to existing system$30.002.Warm air heating systems:a.New installation$40.00b.Replacement furnace to existing duct work$30.00c.Install additional radiation to existing duct work$30.003.Central air conditioning:a.New installation$40.00b.Replacement central air$30.004.Air to air heat exchanger – new installation$30.005.Conversions $30.006.Oil or gas burner assembly$30.007.Unit heaters – gas or oilfired – per unit$30.00Appendix 14B2Commercial Building Inspection Fee Schedule, Sheboygan Falls, mercial – 1.New Commercial Construction:a.Business, Office, Multifamily, Mercantile, etc.$.23 per ft2b.Manufacturing, Industrial, Storage Occupancies, etc.$.17 per mercial Buildings (All Disciplines included):a.Remodels that require inspections minimum fee$385.00b.Remodels that require inspections$.09 per ft2 or $385.00 (whichever is greater)mercial “Build-out” (strip mall, downtown retail, etc.)$385.004.Erosion Control$82.00B.Electrical – mercial Electrical Service$55.002.New Commercial Electrical Construction$.05 per ft2(Business, Office, Multifamily, Mercantile, etc.)3.New Manufacturing/Industrial Electrical$.04 per ft2C.Plumbing – mercial Plumbing; minimum fee$55.002.New Commercial Plumbing Construction$.05 per ft2(Business, Office, Multifamily, Mercantile, etc.)3.Manufacturing & Industrial Plumbing$.04 per mercial & ResidentialRelaying/Replacing of Sanitary or Storm Sewer, or other underground plumbing required inspection$55.005.Storm Sewer or Sanitary Sewer Connection$55.00D.HVAC – 1.New Commercial HVAC Construction$.05 per ft2(Business, Office, Multifamily, Mercantile, etc.)2.Manufacturing & Industrial HVAC$.03 per mercial HVAC Appliance replacement (minimum)$55.00or $6.00/$1,000.00 of value (whichever is greater)The Building Inspector is responsible to approve total fee charges, and items not listed. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download