INITIAL STUDY / ENVIRONMENTAL ASSESSMENT …

The project is located in ABC County on Route ## from west of Route ## South (PM 5.00) to east of the River Causeway near Highway ## (PM 7.3). The total length of the project is 2.1 miles. Within the limits of the proposed project, Route ## is a conventional two-lane, undivided highway with two 12-foot lanes and 2- to 4-foot non-standard shoulders. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download