RICS new rules of measurement 2
RICS new rules of measurement
Detailed measurement for building works
2
RICS NEW RULES OF MEASUREMENT NRM 2: Detailed measurement for building works
1st edition
Acknowledgments The project stages from the RIBA Outline Plan of Work 2007 are reproduced with the permission of the Royal Institute of British Architects.
Published by the Royal Institution of Chartered Surveyors (RICS) Surveyor Court Westwood Business Park Coventry CV4 8JE UK No responsibility for loss or damage caused to any person acting or refraining from action as a result of the material included in this publication can be accepted by the authors or RICS. Produced by the Quantity Surveying and Construction Professional Group of the Royal Institution of Chartered Surveyors. ISBN 978 1 84219 716 5 Royal Institution of Chartered Surveyors (RICS) April 2012. Copyright in all or part of this publication rests with RICS. No part of this work may be reproduced or used in any form or by any means including graphic, electronic, or mechanical, including photocopying, recording, taping or web distribution, without the written permission of the Royal Institution of Chartered Surveyors or in line with the rules of an existing license. Typeset in Great Britain by Columns Design XML Ltd, Reading, Berks Printed by Page Bros, Norwich
Contents
Foreword
v
Acknowledgments
vi
Introduction
1
Status of the RICS new rules of measurement
1
The RICS new rules of measurement (NRM) suite of documents in context
2
Identity
3
Enquiries
3
Part 1: General
5
1.1
Introduction
7
1.2
Measurement in context with the RIBA Plan of Work and OGC Gateway Process
7
1.3
Purpose of NRM 2
9
1.4
Use of NRM 2
9
1.5
Structure of NRM 2
9
1.6
Symbols, abbreviations and definitions
10
Part 2: Rules for detailed measurement of building works
15
2.1
Introduction
17
2.2
Purpose of bill of quantities
17
2.3
Benefits of bill of quantities
17
2.4
Types of bill of quantities
18
2.5
Preparation of bill of quantities
18
2.6
Composition of a bill of quantities
19
2.7
Preliminaries
22
2.8
Measurement rules for building works
24
2.9
Non-measurable works
24
2.10 Risks
27
2.11 Overheads and profit
28
2.12 Credits
28
2.13 Other considerations
28
2.14 Information requirements for measurement
30
2.15 Codification of bill of quantities
33
2.16 Cost management/control
38
2.17 Analysis, collection and storage of cost data
40
Part 3:Tabulated rules of measurement for building works
41
3.1
Introduction
43
3.2
Use of tabulated rules of measurement for building works
43
3.3
Measurement rules for building works
46
Tabulated work sections:
1
Preliminaries
50
2
Off-site manufactured materials, components and buildings
120
3
Demolitions
122
4
Alterations, repairs and conservation
125
5
Excavating and filling
131
6
Ground remediation and soil stabilisation
139
7
Piling
142
8
Underpinning
145
9
Diaphragm walls and embedded retaining walls
147
10 Crib walls, gabions and reinforced earth
149
EFFECTIVE FROM 1 JANUARY 2013
RICS NEW RULES OF MEASUREMENT | iii
NRM 2: DETAILED MEASUREMENT FOR BUILDING WORKS
11 In-situ concrete works
151
12 Precast/composite concrete
159
13 Precast concrete
161
14 Masonry
164
15 Structural metalwork
169
16 Carpentry
173
17 Sheet roof coverings
176
18 Tile and slate roof and wall coverings
181
19 Waterproofing
184
20 Proprietary linings and partitions
187
21 Cladding and covering
192
22 General joinery
195
23 Windows, screens and lights
200
24 Doors, shutters and hatches
202
25 Stairs, walkways and balustrades
205
26 Metalwork
208
27 Glazing
210
28 Floor, wall, ceiling and roof finishings
212
29 Decoration
218
30 Suspended ceilings
220
31 Insulation, fire stopping and fire protection
223
32 Furniture, fittings and equipment
225
33 Drainage above ground
227
34 Drainage below ground
230
35 Site works
234
36 Fencing
238
37 Soft landscaping
241
38 Mechanical services
245
39 Electrical services
250
40 Transportation
254
41 Builder's work in connection with mechanical, electrical and transportation 256 installations
Appendices
261
A
Guidance on the preparation of bill of quantities
262
B
Template for preliminaries pricing schedule (condensed)
269
C
Template for preliminaries pricing schedule (expanded)
270
D
Template for pricing summary for elemental bill of quantities (condensed)
272
E
Template for pricing summary for elemental bill of quantities (expanded)
273
F
Templates for provisional sums, risks and credits
275
G
Example of a work package breakdown structure
276
Bibliography
279
Index
280
iv | RICS NEW RULES OF MEASUREMENT
EFFECTIVE FROM 1 JANUARY 2013
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- rockwell automation process hmi style guide
- your guide to ministerial résumés
- graduate school recommendation
- curriculum development module
- guide to writing a personal statement iupui school of
- your philosophy of social work developing a personal and
- a sample research paper thesis dissertation on
- rics new rules of measurement 2
Related searches
- fha new rules on student loans
- new rules for exempt employees
- new rules for exempt employees 2019
- si units of measurement list
- standard units of measurement chart
- converting units of measurement worksheet
- units of measurement pdf
- chemistry units of measurement pdf
- chemistry units of measurement chart
- definition of measurement in chemistry
- history of measurement system
- si units of measurement conversion