SKN Document list - ESTIF



Solar Keymark Network

List of Documents

|Number |Title |Date |

|N0000 doc |Document list; continuously updated | |

|N0001 xlsx |Distribution list; continuously updated | |

| |Decision List Solar Keymark Network | |

|N0100R1 pdf |Status: Directly after 6. Meeting |2009-03-28 |

|N0100R2 pdf |Status: Directly after 7. Meeting |2009-09-11 |

|N0100R3 pdf |Status: Directly after 8. Meeting |2010-04-17 |

|N0100R4 pdf |Status: Directly after 9. Meeting |2010-10-18 |

|N0100R4CJEN doc |Marked for inclusion in scheme rules a.o. |2011-03-07 |

|N0100R5 pdf |Status after 10. Meeting |2011-05-12 |

|N0100R6 pdf |Including references to documents where decisions are included |2011-08-23 |

|N0100R7 pdf |Status after 11. Meeting |2011-12-22 |

|N0100R8 pdf |Status after 12. Meeting |2012-04-04 |

|N0100R9 pdf |Status after 12. Meeting - revised |2012-06-29 |

|N0100R10 pdf |Status after 13. Meeting |2012-10-01 |

|N0100R11 pdf |Status after 14. Meeting |2013-03-19 |

|N0100R12 pdf |Status after 15. Meeting |2013-10-07 |

|N0100R13 pdf |Revised status after 15. Meeting |2014-01-06 |

|N0100R14 pdf |Status after 16. Meeting |2014-03-17 |

|N0101R0 pdf |Minutes of 6. SKN Meeting held on March 23-24, 2009 at Pamplona (identical with|No date |

| |SK_NW_MIN6C.doc except signatures) | |

|N0102R0 doc |Solar Keymark Internal Regulations as resulting from the discussions at the 6. |2009-03-04 |

| |SKN Meeting | |

|N0102R1 doc |Solar Keymark Internal Regulations |2009-03-23 |

| |(R0 with minor editorial corrections only) | |

|N0102R2 doc |Solar Keymark Internal Regulations |2009-08-26 |

| |(R1 with all comments below included by S. Scholz) | |

|N0102R0_CCEN |N0102R0 with comments from CEN/CMC (H. Liauw) |2009-04-29 |

|N0102R0_CENEA |N0102R0 with comments from CEN/CMC (V. Sharma) |2009-04-16 |

|N0102R0_CINETI |Comments to N0102R0 from INETI (M. Carvalho) |2009-04-21 |

|N0102R1_CCERTIF |Comments to N0102R1 from CERTIF (J. Santos) |2009-08-25 |

|N0102R3 pdf |Solar Keymark Internal Regulations as agreed at 7. SKN meeting |2009-09-03 |

|N0102R4 doc |Solar Keymark Internal Regulations, proposal for revisions |2012-02-10 |

|N0102R6 pdf |Approved at 12th meeting |2012-04-04 |

|N0102R7 pdf |Proposed revision |2013-09-04 |

|N0102R8 pdf |Approved at 15th meeting |2013-10-04 |

|N0103R1 doc |7. SKN Meeting, 3. Draft Agenda |2009-08-11 |

|N0103R2 doc |7. SKN Meeting, 4. Draft Agenda |2009-08-19 |

|N0103R3 doc |7. SKN Meeting, Final Draft Agenda |2009-08-26 |

|N0103R4 doc |7. SKN Meeting, Final Draft Agenda rev1 |2009-08-28 |

|N0103R5 doc |7. SKN Meeting, Final Draft Agenda rev2 |2009-08-31 |

|N0103R6 doc |7. SKN Meeting, Final Draft Agenda rev3 |2009-09-01 |

|N0104R0 doc |Draft on CEN fees (JEN) |2009-06-19 |

|N0105R0 pdf |Fees 2010 for the Solar Keymark Network (JEN) |2009-08-11 |

|N0106R0 doc |Draft Solar Keymark specific scheme rules - 2nd revision round 2009. Version |2009-July/August |

|N0106R0annexC doc |11.01 | |

|N0106R0annexD doc | | |

|N0106R1annexD doc | | |

|N0106R0_CCERTITA doc | | |

| | | |

|N0106R2 doc |Complete draft Solar Keymark specific scheme rules as sent to CCB September |2009-09-18 |

|N0106R2annexA doc |2009. Version 11.02. (All named R2, even if some docs was not made in R0 and R1| |

|N0106R2annexC doc |versions) | |

|N0106R2annexD doc | | |

| | | |

|N0106R3 doc |Complete Solar Keymark specific scheme rules as approved by CCB September 2009 |2009-10-30 |

|N0106R3annexA doc |and CMC October 2009. Version 11.03. | |

|N0106R3annexC doc | | |

|N0106R3annexD doc | | |

| | | |

|N0106R4 doc |Complete draft Solar Keymark specific scheme rules as sent to CCB December | |

|N0106R4annexA doc |2009. Version 11.04. Changes marked. | |

|N0106R4annexC doc |Changes dealing with type definitions and fees. | |

|N0106R4annexD doc | | |

| | | |

|N0106R5 doc |Complete draft Solar Keymark specific scheme rules as approved by CCB January | |

|N0106R5annexA2-R0 doc |2010 Version 11.04. Changes accepted. Changes dealing with type definitions and| |

|N0106R5annexC pdf |fees. | |

|N0106R5annexD pdf |In principle = R4. Annex A1: See N0132R0 below. | |

| | | |

|N0106R6annexDR3 doc |N0106R6annexDR3 - draft made at 8th SKN meeting |2010-03-16 |

|N0106R6annexDR5 doc |N0106R6annexDR5 - final version approved at 9th SKN meeting |2010-10-08 |

|N0106R6 doc |Draft scheme rules including decision until end 2010 |2011-03-07 |

|N0106R7 doc |Draft scheme rules including decision until end 2010 - editorial revison |2011-03-25 |

| |N0106R6annexDR6 - approved at 10th SKN meeting | |

|N0106R6annexDR6 doc |Draft scheme rules including decisions until March2011 - sent to CCB for |2011-03-28 |

|N0106R8 doc |approval |2011-08-23 |

| |Draft scheme rules including decisions until March2011 AND “Solar water heater | |

| |stores” (EN12977-3) - sent to SKN and CCB for approval | |

|N0106R13 doc |Fees for Solar Keymark Network 2011/2012 | |

| | | |

|N0106R6annexC pdf |Specific scheme rules as approved at CCB meeting October 2011 |2011-10-10 |

| |Draft Specific scheme rules as approved at 11th SKN meeting March 2012 | |

|N0106R15 doc |Specific scheme rules as approved by CCB October 2012 |2012-01-04 |

|N0106R16 doc |DRAFT specific scheme rules including resolutions from 14th SKN meeting |2012-04-04 |

| |(including PV/T) | |

|N0106R19 doc |FINAL specific scheme rules including resolutions from 14th SKN meeting |2012-10-29 |

|N0106R20 doc |(including PV/T) (same as above – but without DRAFT stamped on front page |2013-03-19 |

| |FINAL specific scheme rules including resolutions from 14th SKN meeting (e.g. | |

|N0106R20 pdf |requirements on re-testing) |2013-04-17 |

| |… | |

| |Annex A1 to scheme rules: Harmonised factory inspection procedure & check list | |

|N0106R21 pdf |Annex A2 to scheme rules: Solar Keymark surveillance test |2013-10-04 |

| | | |

|... |Annex A3 to scheme rules: Parts list, drawings and specifications, Solar | |

|SKN_N0106_AnnexA1_R0 docx |Keymark Collectors |2012-09-09 |

|SKN_N0106_AnnexA2_R2 docx |Annex B1 to scheme rules: Harmonised format for collector data sheet | |

|SKN_N0106_AnnexA3_R0 doc |Annex B2 to scheme rules: Harmonized format for system datasheet (example)- |2012-09-09 |

|SKN_N0106_AnnexB1_R3.7 pdf |September 2012 | |

|SKN_N0106_AnnexB2_R2.2 pdf |Annex C to scheme rules: Solar Keymark Fees 2013 |2012-09-09 |

|SKN_N0106_AnnexC_R13 docx | | |

|SKN_N0106_AnnexD_R6.doc |Annex D to scheme rules: System families - requirements and extrapolation |2012-09-09 |

| |procedures (version R6 28/3 2011) | |

|SKN_N0106_AnnexE_R0.docx | |2012-09-09 |

|SKN_N0106_AnnexE_R0.docx |Annex E to scheme rules: Factory production control | |

| | |2012-09-09 |

|SKN_N0106_AnnexF_R0.pdf |Revised Annex E to scheme rules: Factory production control | |

|SKN_N0106_AnnexF_R1.pdf | |2012-09-09 |

|SKN_N0106_AnnexF_R2.pdf | |2013-02-18 |

| |SOLAR KEYMARK SCHEME RULES ANNEX F | |

|N0106_AnnexB2_R3.2-system-draft |Requirements for freeze resistance test of evacuated tube collectors with Heat |2013-04-17 |

|xlsx |Pipes following EN 12975:2006 | |

|SKN_N0106_AnnexB3_R0.2-store-draft| |2014-03-17 |

|xlsx |Draft proposal for revised Annex F (not approved and replaced by SKN_N0228R0) | |

|SKN_N0106_AnnexB4_R0.2-controller-| | |

|draft xlsx |New draft data sheets for EN 12977 series – for discussion/ JEN |2013-04-17 |

| |Annex B2: System data sheet (EN12976 & EN 12977) | |

| | | |

| |Annex B3: Store data sheet (EN 12977-3 & -4) | |

| | |2013-07-03 |

| |Annex B4: Controller data sheet ( EN 12977-5) | |

| | | |

| | | |

| | |2014-02-27 |

| | | |

| | |2014-02-27 |

| | | |

| | |2014-02-27 |

|N0107R0 doc |Rain penetration test of vacuum tube collectors |2009-08-13 |

|N0108R0 doc |Performance testing of small vacuum tube collectors with regard to required |2009-08-13 |

| |minimum temperature difference | |

|N0109R0 doc |Proposal for voting on the exchangeability of transparent covers used in |2009-08-13 |

| |thermal collectors having Solar Keymark | |

|N0110R0 doc |Physical Inspection for the Solar-KEYMARK |2009-08-14 |

|N0111R0 doc |Procedure for the physical inspection carried out by the inspectors of |2009-08-12 |

| |DINCERTCO | |

|N0112R0 doc |Changing the collector type of a Solar Keymark tested “Factory made system” |2009-08-14 |

|N0113R0 pdf |Test report iC1101EQR (pdf) |2009-08-15 |

|N0114R0 xls |Data sheet draft version 2.8 (xls) |2009-08-19 |

|N0115R0 pdf |Test results for TiNOX energy Al (pdf) |2009-08-20 |

|N0116R0 doc |Long term prediction calculation (ISO 9459-2/CSTG) (doc) |2009-08-25 |

|N0117R0 pdf |NPR 7976:2009 Determination of the thermal performance of factory made solar |2009-July |

| |domestic hot water systems - Conversion procedure based on the Dutch reference | |

| |conditions (pdf) (conc. flex. syst. perf. cal.) | |

|N0118R0 pdf |Draft minutes of 7. SKN Meeting held on September 3-4, 2009 at CEN in Brussels |2009-09-11 |

|N0119R0 doc |8. SKN Meeting, 1. Draft Agenda |2010-01-04 |

|N0119R3 doc |8. SKN Meeting, 3. Draft Agenda |2010-02-11 |

|N0119R4 doc |8. SKN Meeting, 4. Draft Agenda (final draft) |2010-02-27 |

|N0119R5 doc |8. SKN Meeting, 5. Draft Agenda (rev. final draft) |2010-03-03 |

|N0119R6 doc |8. SKN Meeting, 6. Draft Agenda (rev. final draft) |2010-09-03 |

|N0119R7 doc |8. SKN Meeting, 7. Draft Agenda (rev. final draft) |2010-11-03 |

|N0119R8 doc |8. SKN Meeting,Final Agenda |2010-14-03 |

|N0119R9 doc | |2010-15-03 |

|N0120R0 doc |Proposal for voting on harmonised requirements related to Solar Keymark for |2010-02-19 |

| |collectors |2010-02-19 |

|N0120R0AnnexA doc |Separate Annex A of document above | |

|N0121R0 doc |Proposal Periodic Surveillance Procedure |2010-02-22 |

|N0122R0 doc |Solar Keymark Physical Inspection - Collectors |2010-02-22 |

|N0123R0 doc |Solar Keymark Physical Inspection - Systems |2010-02-22 |

|N0124R0 pdf |Influence of tapping time on system performance |2010-02-19 |

|N0125R0 pdf |Simulation of low solar radiation testing days using |2010-02-26 |

| |solar radiation shield during thermal performance tests | |

| |of factory-made systems according to the CSTG | |

| |method | |

|N0126R0 doc |Remote Random Sampling of Collectors and Systems for Solar Keymark |2010-02-28 |

|N0126R1 doc |Certification | |

|N0127R0 pdf |Instructions for Completing Random Selection via Photographs |2010-02-28 |

|N0128R0 pdf |Document on absorber coating TiNOX energy Al - part I |2010-03-11 |

|N0129R0 pdf |Document on absorber coating TiNOX energy Al - part II | |

|N0130R0 pdf |Document on absorber coating TiNOX energy Al - collector test | |

|N0131R0 pdf |Document on absorber coating Alanod MIRO-THERM 0.5 MT 1300 | |

|N0132R0 doc |Solar Keymark Factory Inspection Report (Annex A1 to scheme rules) |2010-03-16 |

| |Revised version - for newer versions, see under N0106_Annex_A1 | |

|N0132R2 doc | |2012-09-05 |

|N0133R0 pdf |Minutes of 8th meeting (Rapperswil) |2010-03-16 |

|N0134R0 doc |9. SKN Meeting (Graz), Draft Agenda version 0 |2010-06-16 |

|N0134R1 doc |9. SKN Meeting, Draft Agenda version 1 |2010-09-20 |

|N0134R2 doc |9. SKN Meeting, Draft Agenda version 2 |2010-09-26 |

|N0134R3 doc |9. SKN Meeting, Draft Agenda version 3 |2010-10-01 |

|N0134R4 doc |9. SKN Meeting, Draft Agenda version 4 |2010-10-04 |

|N0134R5 doc |9. SKN Meeting, Draft Agenda version 5 |2010-10-05 |

|N0134R6 doc |9. SKN Meeting, Draft Agenda version 6 |2010-10-07 |

|N0135R0 pdf |Solar Keymark Network Secretariat - financial status 2010 & budget 2011 |2010-09-20 |

| |Revised | |

|N0135R1 pdf | |2010-10-07 |

|N0136R0 doc |System specification list (IZES/TÜV) |2010-09-22 |

|N0137R0 doc |Equivalent absorber coatings |2010-09-20 |

|N0137R2 pdf | |2010-09-20 |

|N0137R3 doc | |2011-03-28 |

|… | |… |

|N0137R8 pdf | |2012-09-07 |

|N0138R0 doc |Equivalent collector glazing |2010-09-20 |

| |R1 & R2 internal subgroup documents | |

|N0138R3 doc |Final draft proposal for decision |2011-08-12 |

|N0138R4 doc |Version with minor editorial changes |2011-09-21 |

|N0139R0 doc |Equivalent collector insulation materials |2010-09-20 |

|N0140R0 doc |Proposal for new SKN structure |2010-09-23 |

|N0141R0 doc |Solar KEYMARK Inspection Group |2010-10-01 |

|N0142R0 doc |List of documents Required by Certification Bodies |2010-10-03 |

|N0143R0 doc |Services provided by the European Solar thermal Industry (ESTIF) to the Solar |2010-10-04 |

| |Keymark Network | |

|N0143R1 doc |Revised |2011-02-17 |

|N0143R2 doc |Re-revised |2011-02-27 |

|N0144R0 pdf |Minutes of 9th meeting (Graz) |2010-10-18 |

|N0144R1 pdf |Minutes of 9th meeting (Graz) (rev) |2011-03-22 |

|N0145R1 doc |Solar Certification Fund draft |2010-10-08 |

|N0146R0 doc |10. SKN Meeting (Brussels), Draft Agenda version 0 |2011-02-07 |

|N0146R2 doc |10. SKN Meeting (Brussels), Draft Agenda version 2 |2011-02-27 |

|N0146R3 doc |10. SKN Meeting (Brussels), Final Draft Agenda |2011-03-08 |

|N0146R4 doc |10. SKN Meeting (Brussels), Final Draft Agenda (rev) |2011-03-15 |

|N0146R5 doc |10. SKN Meeting (Brussels), Final Draft Agenda (rev) |2011-03-21 |

|N0146R6 doc |10. SKN Meeting (Brussels), Final Draft Agenda (final rev) |2011-03-22 |

|N0147R0 pdf |Minutes of 1. meeting of Solar Keymark certification bodies |2011-01-25 |

|N0148R0 pdf |Revision of Decision D5.M7 — Solar Keymark Certification |2011-02-15 |

| |of PV/T collectors,U. Fritzsche, TÜV | |

|N0149R0 doc |Discussion paper on equivalent absorber coatings (related to N0137), A. Bohren,|2011-02-11 |

| |SPF | |

|N0150R0 doc |Discussion paper on equivalent insulation (related to N0139), A. Bohren, SPF |2011-02-11 |

|N0151R0 doc |Resolutions from CCB meeting 22-23/2 related to SKN |2011-02-25 |

|N0152R0 pdf |Solar Keymark Network fees as per 01-01-2011 (JEN) |2011-02-17 |

|N0153R0 pdf |Pre-aging of test products (Korbinian Kramer, ISE) |2011-02-17 |

|N0154R0 pdf |Description of program for calculation of annual solar collector energy output |2011-02-24 |

| |(Martin Persson, SP) | |

|N0155R0 pdf |Recommendation from the SCF steering group to the Solar Keymark Network - |2011-03-07 |

| |concerning the proposals for 1st SCF call (jen) | |

| |Revised | |

|N0155R1 pdf | |2011-03-21 |

|N0156R0 doc |Proposal of Revision of Annex D – Section D4/D4.1. (M. Joao Carvalho, LNEG) |2011-03-08 |

|N0157R0 doc |Guideline for the assessment of the solar collector |2011-03-15 |

| |and solar systems technical documentation. (J. Santos, CERTIF) | |

|N0158R0 pdf |Early draft on principle in global certification |2011-03-21 |

| |(J.E. Nielsen) | |

|N0159R0 pdf |Draft minutes of 10th meeting (Brussels) |2011-03-29 |

|N0159R1 pdf |Final Minutes of 10th meeting (Brussels) |2011-10-06 |

|N0160R0 doc |11. SKN Meeting (Paris), Draft Agenda version 0 |2011-08-23 |

|N0160R2 doc |11. SKN Meeting (Paris), 2nd Draft Agenda |2011-09-21 |

|N0160R3 doc |11. SKN Meeting (Paris), 3rd Draft Agenda |2011-10-03 |

|N0160R4 doc |11. SKN Meeting (Paris), Final Agenda |2011-10-04 |

|N0160R5 doc |11. SKN Meeting (Paris), Rev, Final Agenda |2011-10-05 |

|N0161R0 doc |Equivalence of absorbers in FPCs except absorber coating.doc |2011-08-22 |

| |FRANZ HELMINGER | |

|N0162R0 pdf |prEN 12975-2 Annex P, 2011-05-18 |2011-05-18 |

|N0163R0 pdf |Minutes of 1. Solar KEYMARK Inspection Group (2011-05-24).pdf |2011-05-24 |

|N0164R0 pdf |Guide – Preparation of „physical inspection reports“ … (Korbinian Kramer, ISE) |2011-09-20 |

|N0165R0 doc |List of documents required by certification bodies - (Stamatios Babalis / |2011-09-19 |

| |Costas Travasaros) | |

|N0166R0 pdf |Freeze resistance test (Uli Fritzsche) |2011-09-17 |

|N0167R0 pdf |Freeze Resistance Test of Solar Thermal Collectors | |

| |Freeze resistance test of heat pipe evacuated tube collectors | |

|N0168R0 pdf |“Global certification” - Initial first draft scheme rules (JEN) |2011-05-12 |

|N0169R0 pdf |Recommendation from the SCF steering group to the Solar Keymark Network - |2011-09-21 |

| |concerning the proposals for 2nd SCF call | |

|N0170R0 pdf |A New Tool for Standardised Collector performance calculations - Full paper |2011-09-21 |

| |ISES 2011 | |

|N0171R0 pdf |Description of program for calculation of collector energy output - general |2011-09-21 |

|N0171R1 pdf |version 2011-09-09 | |

|N0172R0 pdf |Improving the accuracy in performance prediction for new collector designs |2011-09-21 |

|N0173R0 pdf |Evaluation of calculation results of excel based collector gain calculator |2011-09-21 |

|N0174R0 pdf |Solar Keymark Network - administration budget 2012 (JEN) |2011-09-21 |

|N0175R0 pdf |Solar Keymark Network fee income (JEN) |2011-09-21 |

|N0176R0 pdf |Services provided by ESTIF to the Solar Keymark Network (2012) (Pedro Dias) |2011-09-21 |

|N0177R0 pdf |Solar Keymark Network draft financial report 2011 (Pedro Dias) |2011-09-21 |

|N0178R0 doc |Factorty Prodcution Control for SKN using EN 13172 and EN 1279 2011-09-08 rev.2|2011-09-22 |

| |(Jaime Fernandez) | |

|N0178R2 docx |Version after meeting 2012-01-20 |2012-02-24 |

|N0179R0 pdf (CCB N592) |CCB discussion paper on Solar Keymark for PVT collectors (Hoang Liauw) |2011-10-03 |

|N0180R0 pdf |Recommendations from the Solar KEYMARK empowered certification bodies to CEN, |2011-09-28 |

| |for including certification bodies from non-CEN member/affiliate countries into| |

| |the Solar KEYMARK system (Sören Scholz) | |

|N0181R0 pdf |Minutes of 11th meeting (Paris) |2011-10-10 |

|N0181R1 pdf |Revised version of above |2012-03-25 |

|N0182R0 doc |12. SKN Meeting (Berlin), Initial Draft Agenda |2012-01-18 |

|N0182R2 doc |12. SKN Meeting (Berlin), 2nd Draft Agenda |2012-03-05 |

|N0182R3 doc |12. SKN Meeting (Berlin), Agenda |2012-03-08 |

|N0182R4 doc |12. SKN Meeting (Berlin), Agenda, rev1 |2012-03-09 |

|N0182R5 docx |12. SKN Meeting (Berlin), Agenda, rev2 |2012-03-18 |

|N0182R5 docx |12. SKN Meeting (Berlin), Agenda, rev3 |2012-03-19 |

|N0183R1 pdf |Recommendation from the SCF steering group to the Solar Keymark Network - |2012-03-02 |

| |concerning the proposals for 3rd SCF call | |

|N0184R0 pdf |Paper on: MEASUREMENTS AND BENCHMARK OF PV-T COLLECTORS ACCORDING TO EN12975 |2012-02-21 |

| |AND DEVELOPMENT OF A STANDARDIZED MEASUREMENT PROCEDURE (ISE) | |

|N0185R0 pdf |Paper on:RECENT ADVANCES IN THE DEVELOPMENT AND TESTING OF HYBRID PV-THERMAL |2012-02-21 |

| |COLLECTORS (ISE) | |

|N0186R0 doc |Proposal equivalent absorbers in FPC except absorber coating (Franz Helminger) |2012-02-24 |

|N0187R0 doc |Examples for proposed equivalent absorbers in FPC except absorber coating |2012-02-24 |

| |(Franz Helminger) | |

|N0188R0 doc |DRAFT Proposal for coordinating CEN Keymark database & Solar Keymark database |2012-02-24 |

| |(and others) - not published - being developed (jen) | |

|N0189R0 docx |Minutes of Working Group for Global Certification 2012-01-20 (Jaime Fernandez) |2012-02-24 |

|N0190R0 pdf |Presentation about the "Energy Output Calculator and the new Solar Keymark Data|2012-03-02 |

| |Sheet" (Stefan Mehnert, ISE) | |

|N0191R0 doc |"Reduced" version of EN 12975-1 for presentation and discussion in the SKN.: |2012-03-02 |

| |including Julios remarks were we agreed | |

| |deleting the rain penetration test for the interface between collector and roof| |

| |as we discussed | |

| |including annex ZC | |

| |deleting everything that is not mentioned in the mandate | |

| |including the exposure test (needs to be in there from my point of view because| |

| |we can argue this is proving the durability as it is required by the mandate) | |

| |(Stephan Fischer, ITW) | |

|N0192R4 doc |Specific scheme rules including custom built systems EN 12977 series, JEN |2012-03-03 |

|N0192R6 doc | |2012 -03-16 |

|N0193R0 doc |Rules to issue Solar KEYMARK certificates and sub-licenses for other brands, |2012-03-05 |

| |product names, and sellers, Sören Scholz | |

|N0193R1 doc |Revised version |2013-03-11 |

|N0193R2 docx |R2 version |2013-09-02 |

|N0194R0 pdf |Proposal for modification to SKN decision D3.M10 |2012-03-08 |

| |„Equivalent absorber coatings“, Francis Kliem | |

|N0195R0 docx |Proposal for “Guide – Preparation of „physical inspection reports“ for Solar |2012-02-09 |

| |Thermal products according to the Solar Keymark scheme rules“, Stefan Mehnert, | |

| |ISE | |

|N0196R0 doc |Draft example Test Report for EN 12977 systems, Sebastian Laipple, Carlo |2012-03-16 |

| |Vassella, SPF | |

|N0197R0 docx |Draft example Assortment file for custom built systems, Sebastian Laipple, |2012-02-09 |

| |Carlo Vassella, SPF | |

|N0198R0 pdf |Draft Minutes of 12th meeting (Berlin) |2012-04-22 |

|N0198R1 pdf |Approved Minutes of 12th meeting (Berlin) |2012-09-07 |

|N0199R0 docx |Agenda for 13th meeting Madrid |2012-07-06 |

|N0199R1 docx | | |

|N0199R2 docx | | |

|N0199R3 docx | | |

|N0199R4 docx | | |

|N0199R5 docx | | |

|N0199R6 docx | |2012-09-05 |

|N0200R0 docx |Proposal for Resolution including new ANNEX E for FPC and ISO 9001 requirements|2012-08-20 |

| |covering production line - for newer versions of Annex E see under | |

| |N0106_Annex_E | |

|N0201R0 pdf |Financial status 2012 - budget 2013 |2012-08-20 |

|N0201R1 pdf |Revised version |2012-09-06 |

|N0202R0 pdf |Expected fee income 2013 and expense |2012-08-21 |

|N0202R1 pdf |Revised version |2012-09-06 |

|N0203R0 docx |Services provided by ESTIF to the Solar Keymark Network |2012-08-27 |

|N0204R0 doc |Guide to the Solar Keymark Factory Inspection Report |2012-08-27 |

|N0204R1 docx |Revised version |2012-09-05 |

|N0204R2 docx |Revised version |2012-10-04 |

|N0205R0 pdf |Draft minutes of 13th meeting (Madrid) |2012-09-13 |

|N0205R1 pdf |Minutes of 13th meeting (Madrid) - approved |2013-03-12 |

|N0206R0 docx |CE-marking of solar thermal products – meeting with EC – 28 June 2012 |2012-06-28 |

|N0207R0 docx |Classification of solar thermal collectors with respect to PED |2012-05-07 |

|N0208R1 docx |Proposal: SOLAR KEYMARK-Scheme Rules amendments for PVT certification. Revision|2012-12-12 |

| |2.1 issued 2012-12-12 by Ulrich Fritzsche (TÜV Rheinland). | |

| | | |

| |Revised proposal for resolution on PVT collectors | |

|N0208R3 docx | |2013-02-19 |

|N0209R1 pdf |Draft recommendation from the SCF steering group to the Solar Keymark Network -|2013-01-15 |

| |concerning the proposals for 4th SCF call | |

|N0210R0 docx |Agenda for 14th meeting SP, Boraas – different versions |2013-01-18 |

|N0210R1 docx | |2013-02-15 |

|N0210R2 docx | |2013-02-25 |

|N0210R3 docx | |2013-03-08 |

|N0211R0 docx |History and comments related to the “PV/T issue” |2013-01-16 |

|N0212R0 pdf |CEN/TC312 reaction to: “COMMISSION COMMENTS ON THE … CEN REPLIES TO MANDATES …|2010-01-07 |

| |369” of 7/4 2009 | |

| |Meeting between EC, CEN and TC 312 2/9 2009 at DG Enterprise & Industry, Rue | |

| |Belliard 101, Brussels, Version 2 including comments to version 1 of 11/9 2009,| |

| |Jan Erik Nielsen, 7/1 2010 | |

|N0213R0 docx |SOLAR KEYMARK-Scheme Rules for PVT certification |2013-02-05 |

| |Requirements and Recommendations | |

|N0214R0 doc |Minutes of 6th Meeting of Solar KEYMARK Certification Bodies |2013-03-11 |

|N0215R0 doc |SCHWARZE LISTE / BLACK LIST |2013-03-11 |

|N0216R0 pdf |Draft minutes of 14th meeting (Borås) |2013-03-11 |

| |Minutes of 14th meeting (Borås) - approved |To come |

|N0217R0 docx |Minutes of SK Inspectors meeting 6-9-2012 at Aenor, Madrid |2013-03-12 |

|N0218R0 docx |Agenda for 15th meeting DIN/Berlin – different versions |2013-07-19 |

|N0218R1 docx | |2013-09-04 |

|N0218R2 docx | | |

|N0219R0 zip |Documentation files for interchangeability for Solarceo (Cu) absorber coating |2013-09-04 |

|N0220R0 docx |PROPOSAL FOR RESOLUTION MODIFYING RESOLUTION R1.M14 - SOLAR KEYMARK SCHEME |2013-09-13 |

| |RULES FOR PVT COLLECTORS / Jaime Fernandez | |

|N0221R0 pdf |Financial status 2013 - budget 2014 |2013-09-11 |

|N0222R0 pdf |Expected fee income 2014 and expense |2013-09-11 |

|N0223R0 docx |Services proposed by ESTIF to the Solar Keymark Network 2014 | |

|N0224R0 docx |PROPOSAL FOR RESOLUTION ON ANNEX C REGARDING A CLARIFICATION ON THE FEES / |2013-09-19 |

| |Jaime Fernandez | |

|N0225R0 docx |QUESTIONNAIRE FOR SK INSPECTORS – 2013 |2013-10-01 |

|N0226R0 pdf |WG Internal Checks SKN Meeting Autumn 13 Berlin Project Report |2013-09-30 |

|N0227R0 pdf |Draft minutes of 15th meeting (Berlin) |2013-10-05 |

|N0227R1 pdf |Approved minutes of 15th meeting (Berlin) |2014-03-15 |

|N0228R0 docx |Draft proposal for revised Annex F - not approved |2013-10-02 |

|N0229R0 docx |Agenda for 16th meeting Las Palmas, Gran Canaria, Spain – different versions |2014-01-17 |

|N0229R1 docx | |2014-02-14 |

|N0229R2 docx | |2014-02-24 |

|N0229R3 docx | |2014-03-06 |

|N0229R4 docx | |2014-03-11 |

|N0230R1 pdf |Recommendation from the SCF steering group to the Solar Keymark Network - |2014-02-14 |

| |concerning the proposals for 5th SCF call | |

|N0231R0 pptx |Solar Keymark – certificates for different brands |2014-02-17 |

|N0232R0 doc |Proposal for „Selection and submission of samples in case of extension of |2014-02-28 |

| |product range by manufacturer“ proposed as paragraph 4.1.2 | |

|N0233R0 docx |Definition of classes and info material to manufacturers related to EN ISO 9806|2014-03-05 |

|N0234R0 pdf |Proposal for resolution of new version of Annex E and Annex A |2014-03-06 |

|N0235R0 docx |FACTORY PRODUCTION CONTROL |2014-03-06 |

| |BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE | |

|N0236R0 docx |Inspection Report |2014-03-06 |

|N0237R0 pdf |Review of Inspection Report and Annex E for collectors for Keymark and Global |2014-03-06 |

| |Mark | |

|N0238R0 pdf |Questionnaires for SK inspectors |2014-03-06 |

|N0239R0 pptx |Report on SCF projects - vaConsult |2014-03-07 |

|N0240R0 pdf |Draft minutes of 16th meeting (Las Palmas) |2014-03-18 |

| |Approved minutes of 15th meeting (Las Palmas) |To come |

|N0241R0 docx |Transition from EN 12975-2 to EN ISO 9806 (testing) |2014-04-29 |

|N0242R0 docx |Transition period – certification |To come |

|N0243R0 docx |Agendas for 17th meeting Brussels – different versions |2014-07-02 |

|N0244R0 doc |Editorial comments on ISO 9806:2013 |2014-06-19 |

| | | |

| | | |

| | | |

| | | |

| | | |

| | | |

| | | |

Syntax for name/number:

• All documents (except N0000 and N0001) are numbered in the this way: SKN_NXXXX(_CZZZ)(_AnnexA)_RY

• XXXX is a continuous number (starting with 100 --> SKN_0100RY

• Y is indicating the revision status

• CZZZ (optional) can be used for indicating comments to the document, ZZZ indicating who give comments

• AnnexA (optional) can be used to indicate annexes

• The first version of a document is characterised by “R0”

A list of all documents send out officially by the SKN secretariat or the SKN chairman is maintained by the SKN secretariat. This list is given here in the present document. Latest version of this document is available from (restricted area).

Harald Drück (HD)

Jan Erik Nielsen (JEN)

-----------------------

SKN_N0000

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download