Thiokol Corporation - NASA
_
f_
TWR-61561
SHUTTLE
_)
Solid Rocket Motors
Thiokol Corporation
TECHNICAL
EVALUATION MOTOR NO. 7 (TEM-07)
INTERIM
8 February
REPORT (60
day)
1991
Prepared for:
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GEORGE C. MARSHALL SPACE FLIGHT CENTER
MARSHALL SPACE FUGHT CENTER, ALABAMA 35S12
Contract No.
NAS8-30490
DR. No.
5-3
WBS.No,
HQ601-20-10
ECS No.
1028
7"'___41_
SPACE
PO
Box
CORPORATION
OPERATIONS
707,
Brigham
C;ty,
UT
84302-0707
(801)
863-3511
_I_
(,,
Technical
Evaluation
Motor
No.
7
Interim
Report
(60
day)
Prepared
Systems
Approved
Certification
Planning
(TEM-07)
by:
Engineer
by:
_eer
Supervisor
Data
ECS#
M_agem_/Re
lease
SSI028
TWR-61561
Page
i
f
7
f
Major
contributors
to
this
report
were:
Instrumentation:
D.
South
Case/Leak
T.
Swauger,
R.
Ash,
Insulation:
J.
Passman,
S.
Manz
Nozzle:
R.
George,
R.
Lange,
Systems:
C.
Prokop,
K.
Rees
Properties:
A.
Drendel
R.
Buttars,
M.
Fairbourn,
J.
Curry
C.
Larsen
Joint
Check/Seals:
Protection
Ballistics/Mass
Aero/Thermal:
Structural
Postfire
Photo
Analysis:
Hardware
Instrumentation:
Evaluation:
E.
G.
Mathias,
D.
F.
Abawi
Weiler
D.
Ruddell
Bright
TWR-61561
Page
ii
f
jr
/J
/
f
I i
J
/
i -I
ABSTRACT
Technical
Evaluation
Motor
No.
7
(TEM-7)
was
a full
scale,
duration
static
test
firing
of
a high
performance
motor
configuration
solid
rocket
motor
(SRM)
with
nozzle
vectoring.
static
test
fire
occurred
on
II
December
1990
at
the
Corporation
This
Static
interim
results
hardware
in
time
Included
performance,
objectives
Evaluation
test'report
available
activities
to
support
after
the
submitted
Test
no
T-97.
documents
the
procedures,
performance
and
through
22
January
1991.
Critical
post
test
and
assessment
of
test
data
are
not
complete
a complete
final
test
report
submittal
60
days
test
date.
later
than
are
Bay
full(HPM)
The
Thiokol
A
complete
19 .April
1991.
a
presentation
anomalies,
and
outlined
in CTP-OI07
Motor
No.
7 (TEM-07)
and
test
final
test
report
discussion
of
result
concurrence
Revision
Static
A,'Space
Fire
Test
Shuttle
Plan.
will
be
the
TEM-7
with
the
Technical
TWR-61561
Page
iii
J
I
j
CONTENTS
Pa_gg_
Section
1.0
INTRODUCTION
I.I
TEST
1.2
TEST
1.2
1
1.22
1.23
1.24
1.25
1.26
1.27
1.28
Case/Seals
..................
Internal
Insulation/Liner/Inhibitor
Propellant
..................
Ignition
System
...............
Nozzle/TVC
..................
Leak
Check
Port
Plugs
............
Adjustable
Vent
Port
Plugs
..........
Joint
Protection
System
...........
2.0
TEST
3.0
EXECUTIVE
4.0
INSTRUMENTATION
4.1
INTRODUCTION
4.1
5.0
6.0
OBJECTIVES
3
3
4
12
.....
13
13
13
19
19
19
....................
SUMMARY
20
...................
22
....................
...................
23
23
...................
23
OBSERVATIONS
PHOTOGRAPHY
1
......................
ARRANGEMENT
AND
FACILITIES
..........
ARTICLE
DESCRIPTION
.............
.............
24
STILL
MOTION
.................
..................
24
24
TEST
6.1
6.1.1
6.1.2
RESULTS
......................
CASE
PERFORMANCE
.................
Introduction
.................
Observations
.................
6.2
CASE
INTERNAL
INSULATION
PERFORMANCE
.......
6 2.1
Introduction
.................
6 2.2
Observations
.................
6 3
SEALS/LEAK
CHECK
PERFORMANCE
...........
6 3.1
Introduction
.................
27
27
27
27
29
29
29
36
36
6
6
6
6
6
6
6
6
6
6
6
37
43
43
43
46
47
48
48
48
52
52
6
PHOTOGRAPHY
PICTURES
.........
5.!
5.2
3.2
Observations
4
NOZZLE
ASSEMBLY
4.1
Introduction
4.2
Observations
.........
o ........
PERFORMANCE
............
.................
.................
4.3
TEM-07
Nozzle
Strain
Gage
Response
4.4
Nozzle
TVC
Performance
............
5
IGNITION
SYSTEM
PERFORMANCE
............
5.1
Introduction
.................
5.2
Observations
.................
6
JOINT
PROTECTION
SYSTEMS
PERFORMANCE
6.1
Introduction
.................
6.2
Observations
.................
Summary
.......
52
TWR-61561
Page
iv
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- giv srm 51 11 00 1dm
- instruction manual surface resistivity meter srm 110
- reusable solid rocket motor—accomplishments lessons and
- srm 4555 modern process equipment
- structural repair manual
- certificate of analysis nist
- certification of srm 114q part i
- thiokol corporation nasa
- srm external supplier profile creation
- srm 3020tes l echo depend on it
Related searches
- nasa astronaut corps
- nasa astronaut requirements
- spacex nasa astronauts return
- nasa ufo files declassified
- list of nasa astronauts
- nasa has proof of aliens
- nasa extraterrestrial announcement
- nasa evidence of alien life
- nasa announces first alien contact
- nasa announcement today
- nasa releases evidence alien life
- nasa proof aliens exist