SECTION 02551 - Government of New York

A. Transport pre-insulated pipe on the Site using fabric slings and supported by a wood or steel beam at least 1/2 times the length of the pipe section. Do not transport the pipe with steel forks bearing on the pipe casing, and do not drag pipe across the ground. 1.06 WARRANTY ................
................