TOUCH & GO (CY11) TOUCH 2 WITH GO ... - Toyota Motor Europe

TOUCH & GO (CY11) TOUCH 2 WITH GO (CY13/CY16/MM17/MM19)

SPRING 2021 MAP UPDATE RELEASE NOTES

CONTENTS

Map update information

3

Navigation features

4

Map changes4

Freshness of map updates 5

Map jewels and highlights

6

2

This Toyota Map Update Release Notes helps you stay on track with updates on the Map release for the Touch & Go and Touch 2 with Go navigation systems. It also provides product information, map changes, premium content and sales arguments.

Toyota map updates are released at least once a year, and at a maximum twice a year.

MAP UPDATE INFORMATION

Touch & Go (CY11) (only updated in Spring) Release date: Spring, 2021 Version: 2.22.0 Database: 2020.Q2 Media: USB stick System vendor: Harman

Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican.

TOUCH 2 with Go (CY13/CY16) Release date: Spring, 2021 Version: 6.17.0 Database: 2020.Q2 Media: USB stick or download by user System vendor: Harman

Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican.

TOUCH 2 with Go (MM17/MM19) Release date: Spring, 2021 Version: 2021-1 Database: 2020.Q3 Media: USB stick or download by user System vendor: Harman

Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, Liechtenstein, Lithuania, Luxembourg, North Macedonia, Malta, Moldova, Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican.

Keeping up to date with these and many more features:

Full map navigation Driver-friendly full map pan-European navigation with clear visual displays for signposts, junctions and lane guidance.

Speed limit and safety camera alerts Drive safely with the help of a speed limit display and warning, including an optional speed warning setting. Alerts notify you of fixed safety camera locations (in countries where it is legal).

Intuitive detour suggestions Real-time traffic information updates* alert you to congestion ahead on your planned route. The system calculates potential delay times and suggests a detour to avoid the problem. *Depending on local service availability.

3D city maps In major cities, maps are enhanced by 3D images of notable buildings and landmarks along your route to make navigation easier and clearer than ever before.

3

NAVIGATION FEATURES

3D Landmarks & 3D city models: a realistic environment representation will ease customer's routing thanks to recognizable buildings and monuments. Speed limits: you can check the maximum speed limit at any time and adapt your speed if necessary. 2D junction visuals: it is well-known that taking a wrong exit could extend the driving time considerably. With junction representations, you remain on the right lane and there is no doubt or hesitation at the next turn. Extended lane information: very helpful on highways and complex intersections to select the right lane and avoid dangerous last-minute manoeuvres, meaning you're better prepared and not risking driving in the wrong direction. Speed cameras: provides an awareness of fixed cameras, radar zones and stoplight intersection cameras (where allowed), helping to adjust your driving speed when needed. Traffic information: very important for itinerary calculation. Avoid traffic jams and follow less congested roads to save time during rush hours and reach your destination faster. Core POI list and search: enter a destination address or select amongst a list of points of interest. For the UK and The Netherlands, a search by extended postal codes is available. Sign-as-real: will facilitate driver directions and reduce hesitation mistakes while driving following the system guidance.

MAP CHANGES

About 15% of the road network changes every year and HERE Technologies, Toyota's map supplier, does the same to keep the map update as accurate as possible.

From the last map update (with 2020.Q1 data) to the current map update (with 2020.Q3 data), HERE Technologies has added or modified the following key changes:

For accurate guidance: + 329,623 street names + 1,451 roundabouts + 118,190 one-way roads

For safe travel: + 542,927 km of roads + 1,173,614 speed limits + 80,324 turn restrictions

For convenience: + 172,056 signpost information + 508,803 Points of Interest

More information about how much the map changes over time (Map Change Viewer):

More information about HERE Technologies' data collection and integration:

FRESHNESS OF MAP UPDATES

HERE Maps Conception

The creation of a map update is a long and tedious process. The release of a latest map update for your car involves a thorough process from data collection until the final product is made available. Below a few steps taken:

a) Data collection & integration in the database into the HERE database (3 months): this process is managed by HERE. Every quarter HERE releases updated information with changes on the road networks.

b) Data compilation & test validation (7 - 10 months): this process is done by the system vendor and Toyota. The system vendor oversees compiling data from HERE database into the Toyota navigation system. Once this is done, Toyota will proceed with the testing and approval phase for the update product. Compilation and test validations may involve several interactions before the final approval is given by Toyota.

c) Distribution (2-3 weeks): once the product has been integrated and tested into the Toyota navigation system, it would usually take about 2-3 weeks for Toyota Europe to distribute the product to all Toyota dealerships.

Why is the map in my recently bought map update outdated? Why does it take so long to compile maps while other companies (e.g. Google) do this on a daily basis?

The production of a map update for the in-dash navigation system is a very complex process from data collection, data compilation, data testing and final distribution. The duration and constraints on compilation and testing

are far greater in the automotive industry than in the consumer electronics (PND, phones), and this is due to:

a) The HERE Database is increasing: every year, the size of the map database increases significantly (new streets, new details, etc.) but the map update needs to be contained within a fixed file size.

b) Product bug checking: the final product released to the market needs to be tested, ready and perfect for use. Unlike phones or computers, bugs cannot be fixed with a simple download, a remote bug fix or even a reboot.

c) Old navigation systems: the expectation that map updates also need to run on older navigation systems designed and launched many years ago which have a longer lifetime lasting several years. In comparison, PND and phones have an average life cycle of 1-2 years.

For more information about map updates visit: toyota-mapupdates.eu/FAQ/

4

5

MAP JEWELS AND HIGHLIGHTS

Discover the major road network changes in your country. Find out where new bypasses, highways, roundabouts, sections of roads and many more are included on your new map update with 2020.Q3 data:

AUSTRIA: Stra? in der Steiermark: 1 incorporation of municipalities as per 1.1.2020. (2020.2) Wels: New exit AS Wels-Wirtschaftspark has been added along A8. (2020.2) Wernstein am Inn: New underpass has been added along L1147. (2020.2) Wien: Hospital name has been changed from Rudolfsstiftung to Klinik Landstra?e. (2020.2) Wien: Hospital name has been changed from Sozialmedizinisches Zentrum Ost (SMZ Ost) to Klinik Donaustadt. (2020.2) Wien: Hospital name has been changed from Sozialmedizinisches Zentrum S?d (SMZ-S?d - Kaiser-Franz-Josef-Spital) to Klinik Favoriten. (2020.2) Wien: Hospital name has been changed from Wilhelminenspital to Klinik Ottakring. (2020.2) Tirol - Ehrwald: New luxury hotel Zugspitz-Resort has been added in Obermoss near ski resort Zugspitzbahnen. (2020.3) Ober?sterreich - Unterweitersdorf: Postal code update for 2 cities. (2020.3) Tirol - Ehrwald: New roundabout has been added near a famous Ski Resort "Zugspitzbahnen". (2020.3)

FRANCE (including Monaco): Anet: D116: The 1 km long bypass has been added to avoid the city center of Anet. (2020.1) Appoigny: D319: the 3 km long bypass has been opened to avoid the city center of Appoigny. (2020.2) Arras: Rocade Sud d'Arras: The 5 km long bypass has been added to avoid the city center of Agny. (2020.1) Attainville: A16: the 5 km long motorway has been added in Paris area. (2020.2)

6

Aurillac: N122: the 3 km long bypass has been added to avoid the city center of Aurillac. (2020.2)

Avignon: a new traffic plan in city center has been apply. (2020.1)

Baraqueville: the 7 km long bypass has been added to avoid the city center of Baraqueville. (2020.1)

Bordeaux: Boulevard des Fr?res Moga: a new tunnel has been added to avoid the intersection. (2020.1)

Bourg-en-Bresse: D656: the 1 km long bypass has been added to avoid the city center of Sauzet. (2020.1)

Bourg-en-Bresse: Rocade Sud-Est: the 3km long bypass has been added to South-East of Bourg-en-Bresse. (2020.1)

Bourneville: ?changeur de Bourneville: the interchange between A13 and D89 has been updated to reflect reality, with a new entry and a new exit ramp. (2020.1)

Bouvron: N171: the 4 km long bypass has been added to avoid the city center of Bouvron. (2020.1)

Buchelay: Mon Beau Buchelay: new shopping center has been added in the city of Buchelay. (2020.2)

Busnes: D916: The 3 km long bypass has been added to avoid the city center of Busnes. (2020.1)

Carpentras: D942: a new stretch of road has been added to avoid a complex intersection. (2020.1)

Champforgueil: D819: The 2 km long bypass has been added to the North of Champforgueil. (2020.1)

Charolles: N79: the 7 km long bypass has been added to North of Charolles. (2020.2)

Coulombs: D4: new stretch of road of 1 km has been added to avoid a residential area. (2020.1)

?vreux: Chemin Potier: new stretch of road on 1 km has been added to avoid an industrial zone. (2020.2)

Fourques: D15 A: The 1 km long bypass has been added to avoid the city center of Fourques. (2020.1)

Hem: Avenue Aristide Briand: The 1 km long bypass has been added to avoid the city center of Hem. (2020.1)

La Bass?e: Contournement Nord: The 2 km long bypass has been added to avoid the city center of La Bass?e. (2020.1)

Lagorce: D1: The 1 km long bypass has been added to avoid a factory classified as a hazardous chemical site. (2020.1)

Le Blanc-Mesnil: N2: the intersection for entrance to "A?roport Paris-Le Bourget" has been updated with a new stretch of road. (2020.1)

Le Havre: Chauss?e Hermann du Pasquier: a new stretch of road of 2 km has been added to avoid an industrial area. (2020.2)

Marcey-les-Gr?ve: D973: The 4 km long bypass has been added to the North of Marcey-l?s-Gr?ves to avoid the city center. (2020.1)

Marignane: D20 E: The 2 km long bypass has been added to avoid the city center of Marignane. (2020.2)

Montauban: Boulevard Urbain Ouest: the 2 km long bypass has been opened to avoid the city center of Montauban. (2020.2)

Mouchamps: D48: the 3 km long bypass has been added to avoid the city center of Mouchamps. (2020.1)

Nancy: Voie de la Meurthe: new stretch of road has been added in the city center of Nancy, with a new traffic plan. (2020.2)

Nantes: Quai Pr?sident Wilson: a new stretch of road of 1 km has been added due to construction of hospital. (2020.1)

Neuville-sur-Sa?ne: Rue Jacques: a new stretch of road has been added to avoid a residential area. (2020.2)

Onet-le-Ch?teau: D658: The 2 km long bypass has been added to avoid an industrial area. (2020.2)

Puydrouard: D939: The 3 km long bypass has been added to avoid the city center of Puydrouard. (2020.1)

Richelieu: D849: the 3 km long bypass has been opened to avoid the city center of Richelieu. (2020.2)

Roffiac: D926: the 3 km long bypass has been opened to avoid the city center of Roffiac. (2020.2)

Saint-Flour: Contournement Nord de Saint-Flour: the 7 km long bypass has been added to avoid the city center of Saint-Flour. (2020.2)

Saint-Ismier: The interchange between A41 and D30 has been updated to reflect reality, with new exit and entry ramp. (2020.2)

Saint-Jacques-de-la-Lande: Porte de Saint-Nazaire: the interchange between N136 and D177 has been modified to reflect reality. (2020.1)

Saint-Macaire: Removal of railway crossing and new tunnel at the intersection between D1113 and D672. (2020.2)

Saint-Triviers-sur-Moignans: D936: the 2 km long bypass has been opened to avoid the city center of Saint-Triviers-sur-Moignans. (2020.2)

Sauvagnon: Hauban Nord-Ouest: the 2 km long bypass has been opened to avoid the city center of Sauvagnon. (2020.2)

Toutainville: Demi-?changeur de Toutainville: the interchange between A13 and D675 has been added to reflect reality, with a new entry and a new exit ramp. (2020.1)

Uz?s: D979: The 2 km long bypass has been added to avoid the city center of Uz?s. (2020.1)

Villeneuve-sur-Allier: N7: the 6 km long bypass has been added to avoid the city center of Villeneuve-sur-Allier. (2020.2)

Auvergne-Rh?ne-Alpes - Saint-Genis-Pouilly: D984 C: a new roundabout has been added. (2020.3)

Provence-Alpes-C?te - Aix-en-Provence: ?changeur d'Aix Ouest: the interchange between A51 and D64 has been updated to reflect reality, with a new entry. (2020.3)

Occitanie - Pommevic: D813: a new roundabout has been added. (2020.3)

Provence-Alpes-C?te - Marseille: Avenue Salvador Allende: a new stretch of road has been opened in the city center of Marseille. (2020.3)

Hauts-de-France - Amiens: Rue Jules Barni: a new roundabout has been added. (2020.3)

Pays de la Loire - Villaines-la-Juhel: Rue Saint-Georges: a new roundabout has been added. (2020.3)

Auvergne-Rh?ne-Alpes - Montboucher-sur-Jabron: D540: a new roundabout has been added. (2020.3)

Auvergne-Rh?ne-Alpes - Cailloux-sur-Fontaine: D85: a new roundabout has been added. (2020.3)

Bretagne - Gestel: D167: a new roundabout has been added. (2020.3)

Bretagne - Kervignac: D9: a new roundabout has been added. (2020.3)

Bretagne - Carnac: D119: a new roundabout has been added. (2020.3)

Normandie - Croix-Mare: D6015: a new roundabout has been added. (2020.3)

Normandie - Pavilly: D67: a new roundabout has been added. (2020.3)

Bretagne - Questembert: D5: a new roundabout added at the intersection with D775. (2020.3)

7

Hauts-de-France - Le Touquet-Paris-Plage: D939: a new roundabout has been added. (2020.3)

Normandie - Le Molay-Littry: D15: a new roundabout has been added. (2020.3)

Nouvelle-Aquitaine - Saint-Castin: D706: a new roundabout added at the intersection with D206. (2020.3)

Hauts-de-France - Wambrechies: Rue Obert: a new roundabout has been added. (2020.3)

Hauts-de-France - Valenciennes: Avenue de Reims: a new roundabout has been added. (2020.3)

Nouvelle-Aquitaine - Le Ch?teau-d'Ol?ron: D734: a new roundabout has been added. (2020.3)

Provence-Alpes-C?te - Solli?s-Ville: D97: a new roundabout added at the intersection with D554 E. (2020.3)

Provence-Alpes-C?te - La Falerde: D554 E: a new roundabout has been added. (2020.3)

Pays de la Loire - Angers: Rue Andr? Boquel: a new roundabout has been added. (2020.3)

Pays de la Loire - Angers: Boulevard de Monplaisir: a new roundabout has been added. (2020.3)

Bourgogne-Franche-Co - Sorans-l?s-Breurey: The interchange between N57 and C201 has been updated to reflect reality, with a new entry and a new exit ramp. (2020.3)

Bretagne - Beaussais-sur-Mer: D768: a new roundabout has been added. (2020.3)

Nouvelle-Aquitaine - Fouras: D937 C: a new roundabout has been added. (2020.3)

Bretagne - Chavagne: D21: a new roundabout has been added. (2020.3)

Occitanie - Villefranche-de-Lauragais: D622: a new roundabout has been added. (2020.3)

Pays de la Loire - Mauves-sur-Loire: M68: a new roundabout has been added. (2020.3)

Pays de la Loire - Saint-Georges-sur-Loire: D961: a new roundabout has been added. (2020.3)

Normandie - ?talondes: D126: a new roundabout added at the intersection with D78. (2020.3)

8

Nouvelle-Aquitaine - Aressy: D937: a new roundabout has been added. (2020.3)

Normandie - Soliers: D229: a new roundabout has been added. (2020.3)

Pays de la Loire - Co?eron: M17: a new roundabout has been added. (2020.3)

Pays de la Loire - Angers: Rue du Maine: a new roundabout has been added. (2020.3)

Grand-Est - Ichtratzheim: D1083: a new roundabout has been added. (2020.3)

Normandie - Les Monts d'Aunay: D6: a new roundabout has been added at the intersection with D8. (2020.3)

Nouvelle-Aquitaine - Saint-M?dard-en-Jalles: D6: a new roundabout has been added. (2020.3)

Pays de la Loire - Pontch?teau: D33: a new roundabout has been added. (2020.3)

Grand-Est - Wittenheim: D429: a new roundabout has been added. (2020.3)

Hauts-de-France - Zouafques: D943: a new roundabout has been added. (2020.3)

Provence-Alpes-C?te - Toulon: Rond-Point Bazeilles: a new roundabout has been added. (2020.3)

Nouvelle-Aquitaine - Libourne: D670: a new roundabout has been added. (2020.3)

Pays de la Loire - Vair-sur-Loire: D723: a new roundabout has been added at the intersection with D8. (2020.3)

Provence-Alpes-C?te - Sainte-Maxime: D25: a new roundabout has been added at the intersection with D74. (2020.3)

Nouvelle-Aquitaine - Soumoulou: D817: a new roundabout has been added. (2020.3)

Hauts-de-France - Pont-Sainte-Maxence: D1017: a new roundabout has been added. (2020.3)

Centre Val de Loire - Bourgueil: D635: a new roundabout has been added. (2020.3)

Centre Val de Loire - Bourgueil: Rue des Tanneries: a new roundabout has been added. (2020.3)

Bretagne - Plourhan: D9 A: a new roundabout added at the intersection with D51. (2020.3)

Bretagne - Saint-Gildas-de-Rhuys : C4: a new roundabout has been added. (2020.3)

Bretagne - Arzal: D148: a new roundabout has been added. (2020.3)

Auvergne-Rh?ne-Alpes - Chamb?ry: D1006: a new roundabout has been added. (2020.3)

Occitanie - Toulouse: Avenue de Muret: a new roundabout has been added. (2020.3)

Pays de la Loire - Lu?on: D200: a new roundabout added at the intersection with D14. (2020.3)

Pays de la Loire - Bouaye: M751 A: a new roundabout has been added. (2020.3)

Hauts-de-France - Pr?cy-sur-Oise: D44: a new roundabout has been added. (2020.3)

Provence-Alpes-C?te d'Azur - Barcelonnette: D902: a new roundabout has been added. (2020.3)

Centre Val de Loire - Vend?me: D957: a new roundabout has been added. (2020.3)

?le-de-France - Saint-Cyr-l'?cole: D7: a new roundabout has been added. (2020.3)

Hauts-de-France - Sedan: D106: a new roundabout has been added. (2020.3)

Hauts-de-France - Lille: 811 km of county roads have changed names in M?tropole Europ?enne de Lille area. (2020.3)

Auvergne-Rh?ne-Alpes - Belley: D992: a new roundabout has been added. (2020.3)

Occitanie - Gimont: D12: a new roundabout has been added. (2020.3)

Normandie - Dieppe: Due to the collapse of the cliff, the shape of the Route de Pourville has been modified. (2020.3)

?le-de-France - Saclay: Carrefour du Christ: the junction has been simplified with the removal of a roundabout and new entry and exit ramps. (2020.3)

Nouvelle-Aquitaine - Ch?tellerault: Boulevard Sadi Carnot: a new roundabout has been added. (2020.3)

Normandie - Villers-sur-Mer: D513: a new roundabout has been added. (2020.3)

Normandie - T?tes: D927: a new roundabout has been added. (2020.3)

Auvergne-Rh?ne-Alpes - La Roche-Blanche: D979: a new stretch of road has been added to avoid a roundabout and enter directly to the motorway. (2020.3)

Centre Val de Loire - Vend?me: Rue du Cimeti?re: a new roundabout has been added. (2020.3)

Pays de la Loire - Cotignac: D13: a new roundabout has been added. (2020.3)

Centre Val de Loire - Loches: Avenue Aristide Briand: a new roundabout has been added. (2020.3)

Occitanie - Labrugui?res: D56: a new roundabout has been added at the intersection with D60. (2020.3)

Provence-Alpes-C?te - Mondragon: D44: a new roundabout has been added. (2020.3)

Occitanie - Orsan: Avenue des Tavans: a new roundabout has been added. (2020.3)

GERMANY (including Lichtenstein):

Aachen: Speed Limit change of several roads within the inner-city circle ring of Aachen. (2020.2)

Ahorn: Geometry change of K2840 has been added. (2020.2)

Bad Sachsa: New bypass of B243 around the settlement of Mackenrode has been added. (2020.2)

Bad Sachsa: New parts of B243N northwest of N?xei have been added. (2020.2)

Belm: New exit AS Belm-Vehrte has been added. (2020.2)

Berlin: Diesel restrictions for vehicles attribute have been added to 8 roads in inner city of Berlin. (2020.2)

Berlin: New Sports complex "Wellenwerk", the world largest indoor surfing hall has been implemented. (2020.2)

Darmstadt: 2 roads in Darmstadt received Diesel restrictions for vehicles. (2020.2)

D?sseldorf: New ramps have been added along Heerdter Lohweg in D?sseldorf. (2020.2)

Essen: Lanes and width restrictions have been changed along A40 in Essen. (2020.2)

Essenbach: New bypass of B15N between Ergoldsbach and Essenbach has been added. (2020.2)

Feldafing: Moved hospital Benedictus Krankenhaus to new location: ThomasMann-Stra?e 6. (2020.2)

Fockbek: New bypass of K98 around Fockbek has been added. (2020.2)

Freidrichshafen: Change of crossing/routing B31/Meersburger Stra?e. (2020.1)

Freising: New part of St2350 has been added west of Freising. (2020.2)

Geseke: New rest area along A44 has been added. (2020.1)

G?denroth: New bypass of B327 around G?denroth has been opened for traffic. (2020.1)

Grammetal: 34 incorporations of municipalities in Thuringia as per 1.1.2020. (2020.2)

9

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download