Jay,



PowerRICHSystem References

Utility

Company: Florida Power Corporation

Location: Central Florida

Please refer to the Power Point Presentation (Devices and Customers UR) for information on this system.

Installed By: AL Trucano

Date: 8/2/99

Contact Person: Randy Dotson

Contact Number: (407) 475-2288

________________________________________________________________________________

Distribution

Company: Merck

Location: Albany Georgia

This PowerRICHSystem has 9 Substations with approximately 80 Electro Industries devices, 29 DPU2000R, 8 Transformers, and 6 Sixtrak I/O Modules with gateways. Communication is being done through a Fiber Network. Approximate Point count one this project is 50,000 I/O.

Installed By: Willy Hernandez

Date: 8/2/99

Contact Person: Craig Smith

Contact Number: (912) 420-2774

________________________________________________________________________________

Distribution

Company: Merck

Location: Rahway New Jersey

This PowerRICHSystem has 101 Substations with approximately 300 devices, 3 Display Nodes, and 2 Redundant Servers. Communications is being done over a Fiber/Ethernet Network. Variable Point Count on this project will exceed 500,000 I/O. GE Devices include Multilin 489,F-60,PQM,745,T-60’s. ABB devices include GPU2000R.

Installed By: Willy Hernandez/Geoff Patton

Date: 1/2/01

Contact Person: Tom Leone

Contact Number: (732) 594-7432

________________________________________________________________________________

University

Company: University of Maryland

Location: Maryland, VA

This PowerRICHSystem has ABB DPU2000R, PCD2000, and Sixtrak I/O modules communication over an Ethernet Network. There is also 2 Display Nodes located at the Engineering offices of the Campus.

Installed By: PRS Team

Date: 8/2/97

Contact Person: Marlowe Leafty

Contact Number: (301) 405-7078

________________________________________________________________________________

University

Company: University of North Carolina-Chapel Hill

Location: Chapel Hill, NC

This PowerRICHSystem has 3 Substations with approximately 80 devices, 6 Internet Display Nodes, and Redundant Servers. All communications is done via the Campus TCP/IP Ethernet Network. Devices included in this project are DPU2000R,GPU2000R,PCD2000R and Sixtrak Modules. Variable Point Count on this project 150,000.

Installed By: PRS Team

Date: 11/14/00

Contact Person: Pat Andrews

Contact Number: (919-962-5244

________________________________________________________________________________

Distribution

Company: Lorillard Tobacco

Location: Greensboro, NC

This PowerRICHSystem has ABB DPU2000R, Sixtrak, Remotetrak Analog and Digital Modules, ABB KYZ meter.

Installed By: Al Trucano

Date: 5/2/99

Contact Person: Larry Law

Contact Number: (336) 335-6907

________________________________________________________________________________

Distribution

Company: Callaway Golf Ball Mfg.

Location: Carlsbad, CA

This PowerRICHSystem has ABB Microshield OC Relays, Electro Industries DMMS 300 Meters.

Installed By: Al Trucano

Date: 5/2/97

Contact Person: Troy Keltner

Contact Number: (619) 268-1444

Ruben Cancino: (619) 268-1444

________________________________________________________________________________

Utility

Company: French Broad EMC (Electric Membership Co-op)

Location: Mars Hill, NC

This is a utility company with 18 different substations each substation has its independent server. There is also a control center that has a Main server. All transmission is being done through radio, using repeaters. There are also ABB PCD 2000 being used throughout and these devices are communicating using the DNP 3.0 Protocol via radio. In case the Main server goes down, all the information will be obtained by the independent servers at each of the Substations and once the Main comes back on line, the Information automatically becomes transferred so that the Main is always up to date with all current the current information.

Written By: BCI Controls

Date: 10/1/99

Contact Person: Jeff Lovin

Contact Number: (828) 649-2051

Distribution

Company: Pfizer

Location: Vega Baja, Puerto Rico

This PowerRICHSystem has 2 Substations with approximately 16 devices. Communications is being done over a Fiber Network. Variable Point Count on this project is 5,000 I/O. GE Devices included are Multilin 489. ABB devices included are TGPU2000, and DPU2000.

Installed By: Willy Hernandez

Date: 12/16/00

Contact Person: Carlos Claudio

Contact Number: (787) 654-2374

Distribution

Company: Monsanto

Location: St. Louis

This PowerRICHSystem is Communicating with ABB DPU200R’s, TPU200R’s, via 485 Network. This project has one main server and several local display Clients.

Written By: Geoff Patton

Contact: Mark Hemmann

TEL: 314-989-9310

Date: 1/1/98

Power/Utility

Company: Chevron

Location: Orange, TX

PowerRICHSystem process control for 138 kV incoming power and

Distribution 15kV, ABB Safegear, with ABB TPU/DPU2000R protective relays and

ABB MSOC relays. Motor control in the SP building is protected by

GE Multilin 750 and 469 units with ABB DPU2000R units on the mains. The

4160 medium Voltage motors are monitored via DMMS300+ units from Electro

Industries. In the GP building the switchgear is Powell with Basler

Protection units. The whole system has 3 IO Servers and 2 manger clients.

Written by: Jay Park

Date: 12/2/98

Contact Person: Billy McMillan

Telephone: (409) 882-6067

Power/Utility

Company: Motiva

Location: Beaumont, TX USA

This PowerRICHSystem is connected to multiple substations within the plant

Grounds connected via fiber optic cable and telephone lines using short haul

MODEMS. The system monitors SEL 501 and 267 relays via the SEL 2020, Multilin 469 motor relays and ABB MSOC relays. Selected data is transferred directly into the administrative Oracle database for department power usage.

Written by: Al Trucano

Date: 7/30/99

Contact Person: Jake Berkline

TEL: 1-409-989-7215

Waste/Water

Company: City of Daytona

Location: Bethun Point Waste Water Treatment Plant

This PowerRICHSystem uses a 500 pt Licence with several managers nodes that are

used to dial into the systemApplication is running on Win NT, Communcating

to AB PLC5s via a KT card and local Sixtrak Panel via Sixnet Control Room

Written By: BCI

Date: 1/1/97

Contact: Scott Lee

Tel: (407) 847-8848 X202

Gas/Oil

Company: Pemex

Location: Villahermosa, Mexico

This PowerRICHSystem has 12 Substations with approximately 240 devices, 1 Display Node, and 2 Redundant Servers. Communications is being done over a Fiber/Ethernet Network. I/O Point Count on this project will exceed 200,000 I/O. GE Devices include Multilin 489,750,PQM,745,T-60’s. ABB devices include GPU2000R.

Installed By: Willy Hernandez

Date: 3/13/01

Contact Person: Carlos Azamar

Contact Number: (011) 52-9310-3500 X32550

Distribution

Company: Eramet

Location: Marrieta, Ohio

This PowerRICHSystem has 2 Substations with approximately 100 devices, 3 Display Node, and 1 IO Server. Communications is being done over a Fiber/Ethernet Network. I/O Point Count on this project will exceed 50,000 I/O. GE Devices included Microverstrip. ABB devices included TPU2000R, Dpu2000R. SEL Devices Included 2020,587,501. PLC’s Icluded Modicom.

Installed By: Willy Hernandez

Date: 5/17/99

Contact Person: Greg Mohr

Contact Number: (740) 374-1138

Power/Utility

Company: CNFL Utility

Location: San Jose, Costa Rica

This PowerRICHSystem is connected to multiple substations. Each Substation has its own I/O Server. There are 8 Substations in total. Future expansion includes location of a Main I/O Server at the Central Control Room to gather information from all 8 Local Substations. Connections are via fiber optic cable and telephone lines. The system monitors ABB DPU2000R’s, TPU2000R’s and PCD 2000’s. Information from the PowerRICHSystem is being transferred to a Landis and Gyr System via Ethernet Network

Written by: Willy Hernandez

Date: 5/12/99

Contact Person: Andres Alvarado

TEL: 011-506-392-1601

ADDITIONAL REFERENCES:

Avatar Utilities

Bettis Atomic Labs

Cape Canaveral Air Force Base

CH2MHILL

City of Cape Coral

City of Daytona Beach

City of Lakeland

City of St. Petersburg

City of Tallahassee

City of Tampa

Dofasco Steel

ECC, China

Florida Cities Water

Florida Water Services

Florida Wire and Cable

GE Automation Services

Genertec

Green Bay Wisconson Utility

Harris Corp.

Hillsborough County

Hooper Engineering

IMC Agrico

Jacksonville Electric Authority

Lee County Utilities

Lockheed Martin

Modelo Beer, Mexico

Montgomery Watson

NASA-Kennedy Space Center

Naval Air Warfare Center

Nucor Steel, Norfolk, NE

Performance Technical Services

Phillips Services, TN

Pratt & Whitney

Rocha Controls

Severn Trent

Souther Power

Southern Technologies

University of Illinois

VA Hospital, Cleveland OH

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download