Au.int
Final Clarification and time extension for Supply and installation of Biometrics Fingerprint Reader, WIFI Jammer outdoor unit and network operation center video wall system for the African Union CommissionPROCUREMENT REF NUMBER: AUC/MIS/G/02/2020 Date June 29, 2020 Reference is made to the bid published in the AU Web site with contract name Supply and installation of Biometrics Fingerprint Reader, WIFI Jammer outdoor unit and network operation center video wall system for the African Union Commission, with Procurement Ref Number: AUC/MIS/G/02/2020Bid/ contract description: - Supply and installation of Biometrics Fingerprint Reader, WIFI Jammer outdoor unit and network operation center video wall system for the African Union CommissionProcurement Ref Number: AUC/MIS/G/02/2020 17.1The bidders shall submit their technical and financial bids electronically as per the following details. The PDF copy of the technical and financial proposals in separate Zipped files shall be submitted by EM (Electronic e-mail). The Zipped files of the technical and Financial Proposal should be separately encrypted, or password protected. The Email shall not be encrypted but only the Technical and Financial Proposals shall be encrypted or password protected. The procedure is:The separate Zipped files of the technical and financial proposals should be sent to the following email addresses: tender@africa- and getachewd@africa-bidders should ensure documents are not corrupt or affected by any computer virus that may possibly deny an access to the files. The Client shall not be responsible for such corrupt files which may deny access during the proposal opening process.The bidders will receive the confirmation email from the Borrower once the Proposal is received by e-mail.Password or encryption key should be broken into two parts for both the technical and financial proposal zipped files. The two parts should be sent to the following officially designated recipients:The first part be sent by EM to: tender@africa-The second part be sent by EM to: getachewd@africa-Time of sending of password or encryption key for the technical and financial proposals: The passwords or “encryption key” for technical proposals will be sent at least four hours before bid submission deadline. The subject of the email address should indicate the full title of the assignment and procurement reference number. ITB 22.1 For bid submission purposes only, the Purchaser’s address is: Head Procurement, Travel & Stores DivisionAfrican Union CommissionRoosevelt StreetP.O Box 3243, Addis AbabaEthiopiaTelephone: Tel: +251 (0) 11 551 7700 – Ext 4371The deadline for bid submission is: Date August 7, 2020Time: 3:00pm Addis Ababa time Bidders Shall have the option of submitting their bids electronically.ITB 25.1The bid opening shall take place at: Head Procurement, Travel & Stores DivisionAfrican Union CommissionRoosevelt StreetP.O Box 3243, Addis AbabaEthiopiaTelephone: Tel: +251 (0) 11 551 7700 – Ext 4371Date August 7, 2020Time: 3:30pm Addis Ababa time Bidders Shall have the option of submitting their bids electronically.Online opening will be undertaken through Microsoft Teams or Zoom or bluejeans. The link for attending the online opening will be shared with shortlisted consultants one day prior to the opening. Lot 2 - Supply and installation of WIFI Jammer outdoor unit for the African Union Commission.You have indicated “RFID/NFC”. Do you need either RFID OR NFC or both RFID AND NFC? This would determine whether the Access Control Terminal is meant to read RFID tags or NFC tags or both RFID tags and NFC tags. Answer: - kindly make different proposals with "and/or NFC/RFID". We are open at this point. The most important criteria are to meet the minimum technical requirement indicated in the bidding document and the cost. In regards to the technical requirement the bidding document allows a bidder to propose their alternatives as main offer and alternative offers with their respective price. The bid evaluation shall be based on the prospective bidders’ main offer only and respective technical aspect. However, the Africa Union might consider the alternative offer of the recommended for award bidder at the time of pre contract award discussion if the alternative offer is for the benefit of the Union. For the RFID tags, do you also need us to include the 200 empty cards? Answer: - Yes. We need empty cards to be configured for specific users. If so, on Q2, do you need us to include 200 x 20 systems = 4,000 cards or simply 200 cards for all the 20 systems? Answer: - We just need 200 cards. The system is supposed to be centralized. Any card should work on any reader. Should the RFID cards be EM (ID) or M1 (IC)? Answer: - no idea. The card should be compatible with the proposed reader. Will we utilize an existing Ethernet cabling to all the points the terminal will be installed? Answer: - Yes, we do. The IT department will propose RJ45 cable on the selected emplacement. If new cabling is desired, what is the cable length required? Answer: the Africa Union will handle the cabling issue if required.Will we utilize your existing Network Switch? Answer: - yes, we have a full network infrastructure. We will propose the IP plan during installation phase.Will we utilize your existing PC/Server to run the Software for the Access Control? Answer: - yes, we will handle anything concerning system and network infrastructure.?Do you still require a Key Pad? Answer: - kindly maintain the specification proposed on the bidding document.If not, would you wish to replace the Key Pad to a Facial Recognition option? Answer: - the main requirement of the bidding document is as indicated in the technical requirement of the bidding document. However, you can propose the facial recognition as alternative. the AUC needs the system to have Answer: - ?????? Key Pad, Card Reader and Facial RecognitionYou mention 2400-2500 MHz (2.4 GHz-2.5 GHz). Wi-Fi operates under 2.4GHz and 5.8 GHz. Do you then need these two frequency bands jammed? Answer: - Our WIFI access point used for outside zone run under 2.4 GHz. However, fell free to propose a jammer handling 2.4 and 5Ghz Is the 100W Power Output necessary? Our system is able to achieve a 50m Radius using a 40W Power Output due to our antenna system. Answer: - Well noted. We are open to any specific proposal provided that the new proposal is for the benefit of the Africa Union. Please note that jamming these frequencies will also affect all other devices that operate in this frequency range and not only Wi-Fi; therefore, Bluetooth devices, Commercial-of-the-Shelf drones, etc. Answer: - the purpose is to stop our WIFI signal out of the premises. The jammer will be deployed on the perimeter wall. The most important criteria is to be able to configure the jamming distance to avoid disturbing neighbour’s facilities. Please note that jammers are also controlled/restricted/ items subject to export controls by various governments. In the case we may require End-user Certifications, please confirm that AUC would be able to provide this.Answer: - we will handle the legislation part and custom clearance. AU will deal with the host country authority.Will these be installed in the open areas of the AUC complex? Where will these be mounted? Would we need to factor in Poles/Tripods or are these available? Answer: - the jammers will be installed on some specific areas on the perimeter fences to avoid non authorized people from outside to get access to our WIFI network. Lot 3 - Supply of network operation center video wall system for the African Union Commission.Kindly confirm that you need a total of 5 Videowalls, with each Videowall being of a 4 x 4 configuration. Answer: - We only need 1 4x4 videowallKindly confirm that the Videowalls are for Indoor use. Answer: - yes The videowall is for indoor Use for Network Operation Centre.Will all the Videowalls be Wall-mounted or Free-standing? Answer: - Both are welcome but we prefer free standing for ease of maintenance.Is there an existing Network Switch and Ethernet cabling to each of the 5 Videowall locations that we can integrate into? Answer: - There is existing networking and cabling but we would welcome improvements.What Tablets or Pads would be used? Android, iOS, other? If other, please describe.Answer: - Yes, all IOS, Android and windows tablets will be used to manage it.?Could you kindly describe the requirement in more details since we need to have a better understanding in order to address certain key information from the project scope such as below:?What is the best case match for the project?Answer: - Control Room / Operations CentreWhat type of content will be displayed?Answer: - Live cable or satellite TV,Videos and images, IP video feeds, Web content, dashboards, KPIs, PC Desktops and applications, Other HDMI input devicesFrom the 8 inputs desired, what is the maximum number of Full HD (1920x1080) media sources that could run at once? (Includes video or image files, HDMI, or network video streams)Answer: - Minimum 4 inputs to be Full HD.From the 8 inputs desired, what is the maximum number of interactive sources, if any, that could be playing at once? (Web applications, remote and local desktops)Answer: - Minimum 4 inputs How many content sources will you use on the Videowall?Answer: - Multiple sources per screen, e.g., using multi window or picture in pictureWhat features do you need? Answer: -Create distinct zones inside bezel lines (Multi-Window, Picture-in-Picture)Dynamically add, remove and manipulate content in real-time (Command & Control)Execute fast content or layout changes (Source Switcher, Preset Switcher)Real-time, interactive control of all displays and contentHave a single source span the entire Video Wall(s)Map one content source per displaySynchronize content across multiple displays, walls or zones (Mirror Groups)What type of external content sources will be displayed? (Such as: Flash, HTML5, WebGL, 3d, RDP VNC, RTSP, RTP) Answer: -Real time live camera feedLaptop/PCHDMI/SDI sourceUSBTablets/PadsWhat type of local content sources will be displayed? Answer: -CMS contentVideo Codecs (Such as: FLAC, AAC, H.264, H.265, DV, MPEG2, Theora, Vorbis,VPX, XviD)Video Containers (Such as: AVI, ADF, MKV MPG, MP4, OGV, MOV)Static Images (Such as: gif, pbm, pgm, png, ppm, qif, qti, tif, tiff, jpe, jpg, jpeg, qtif, webp)Browser based content: if so, how manyDesktop applicationsHow many types of content will be playing simultaneously? Answer: -At least 4Do you require interaction with a keyboard and mouse? For example - To login to a portal or to open tabs in a browser and navigate with keyboard and mouse. Answer: YesPlease share any additional notes about the deployment that may be important: Answer: This video wall is meant for the purpose of Network Operation Centre which will be displaying a of Real-time monitoring. ? Regards, ................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related searches
- det nsw au staff portal
- au access parent portal
- immigrer au canada
- immigrer au canada gratuitement
- immigrer au quebec
- comment immigrer au canada
- immigrer au canada site officiel
- comment immigrer au canada gratuitement
- immigrer au canada quebec
- immigrer au canada pour travailler
- comment immigrer au quebec
- au holiday 2020