Installation Qualification Equipment sample
[Pages:5]Project:
Equipment Description: Manufacturer: Location:
Installation Qualification Equipment
(Reference SOP: __________)
Project No: Serial No:
Model No: Protocol:
TEM-170 Issue date
Equipment No:
PROGRAM INDEX
1. OBJECTIVE..................................................................................................................................3 2. ACCEPTANCE CRITERIA............................................................................................................3 3. QUALIFICATION PROCEDURES ................................................................................................3 4. DEMAND SPECIFICATIONS........................................................................................................4 5. EQUIPMENT - MECHANICAL ......................................................................................................4
5.1. List of drawings.....................................................................................................................4 5.2. List of Supplier Quotes & Purchase Orders for Major Components.......................................5 5.3. List of Equipment / Maintenance Manuals. ...........................................................................5 6. EQUIPMENT FEATURES.............................................................................................................6 6.1. Manufacturer's Specifications...............................................................................................6 6.2. Component Materials in Product Contact..............................................................................6 6.3. Component Materials (as detailed in design spec.) not in Product Contact...........................7 6.4. Filters: ..................................................................................................................................7 6.5. Lubricants.............................................................................................................................8 6.6. Equipment SOP's .................................................................................................................8 6.7. Spare Parts List Location: ..................................................................................................9 6.8. Can machine adjustment be made without potential for product contamination? ..................9 7. ELECTRICAL INSTALLATION......................................................................................................9 7.1. Electrical Drawings ...............................................................................................................9 7.2. Equipment Rating ...............................................................................................................10 7.3. Supply Wiring .....................................................................................................................10 7.4. Distribution Details..............................................................................................................11 7.5. Instrumentation...................................................................................................................11 7.6. Calibration SOP's ...............................................................................................................12 7.7. Computerised Systems Verification ....................................................................................12 7.8. Spare Parts List:.................................................................................................................14 8. AUXILIARY EQUIPMENT / SERVICES LIST..............................................................................15 9. CHANGE PARTS .......................................................................................................................15 10. CLEANING PROCEDURES .......................................................................................................15 10.1. SOP's .................................................................................................................................15 10.2. Cleaning Records ...............................................................................................................16 11. PREVENTATIVE MAINTENANCE..............................................................................................16 11.1. Preventative Maintenance Program Identification: ..............................................................16 12. TRAINING RECORDS................................................................................................................16 13. COMMISSIONING OVERVIEW ..................................................................................................16 13.1. Equipment Operation..........................................................................................................16 13.2. Process Operation..............................................................................................................16 14. DISCREPANCIES.......................................................................................................................17 15. SIGNATURE LOG ......................................................................................................................17 16. ATTACHMENTS.........................................................................................................................17
Prepared by:
Date Prepared:
Revision No: Page 1 of 17
Installation Qualification Equipment
(Reference SOP: __________)
TEM-170 Issue date
4. DEMAND SPECIFICATIONS
The list below indicates the Demand Specifications that have been applied to this project. All Demand Specifications will be filed away with this Installation Report.
Demand Specifications Available
1. Equipment Functional Demand Specification 2. Mechanical / Design Specification 3. Electrical Demand Specification 4. Instrumentation Demand Specification 5. Operator's Control Panel Specification 6. SCADA Demand Specification 7. Technical Documentation Specification 8. Safety Requirements * = Please attach if Yes
Used in this Project* Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No
Yes/No
5. EQUIPMENT - MECHANICAL Complete a list of drawings, P&I's, specifications, purchase orders & manuals associated with the equipment/system. Document Location of the latest versions. Verify the accuracy of those drawings which represent the system "as built".
5.1. List of drawings.
5.1.1. Equipment
Drawing ID Rev. No.
Description
Location
As Built Verified Yes No
Date
Verified by
Prepared by:
Date Prepared:
Revision No: Page 4 of 17
Installation Qualification for Equipment
(Reference SOP: _________)
TEM-170 Issue date
6.5. Lubricants Use this list to verify that the lubricants used in the system conform to the equipment manufacturer's specification or those specified by the company.
6.5.1. List Lubricants in Product Contact:
Lubricant Name
Description
Used For
Verified Verified by: Yes No
6.5.2. List Lubricants (as detailed in design spec.) NOT in Product Contact:
List only those Lubricants detailed in the Design Specification.
Lubricant Name
Description
Used For
Verified Verified by: Yes No
6.6. Equipment SOP's List all SOP's currently available or requiring to be written pertinent to the proper operation of the unit. Ensure you reference the current version.
S.O.P. No:
Title
Date Issued
Prepared by:
Date Prepared:
Revision No: Page 8 of 17
Installation Qualification for Equipment
(Reference SOP: _________)
TEM-170 Issue date
7.6. Calibration SOP's List all SOP's pertinent to the calibration of the unit.
Ensure you reference the current version.
S.O.P. No:
Title
Date Issued
7.7. Computerised Systems Verification
7.7.1. Software
Check the microprocessors for functionality, program description and logic flow for all intended programs. Input and output checks, contactor state and indicator lights operation are to be checked. Installation verification
Software/Equipment:
Check
Applications program on hand and annotated to describe process or function ? User Requirement Specification. Logic flow diagram or program description chart available and reviewed ? Functional Specification. Loaded programs approved. Confirm that software is installed as per vendor instructions. Software Version Installed Ensure archiving and backup procedures followed Source code availability
Location
Verified Yes No
Verified by
N/A
Date
Prepared by:
Date Prepared:
Revision No: Page 12 of 17
Installation Qualification for Equipment
(Reference SOP: _________)
10.2. Cleaning Records
TEM-170 Issue date
Record in what form cleaning records are to be kept and where e.g. log book, as a part of batch documents.
11. PREVENTATIVE MAINTENANCE
11.1. Preventative Maintenance Program Identification: Program identification and records. For each piece of equipment list the maintenance Task Number and maintenance period:
Equipment
Task No.
Maintenance Period
12. TRAINING RECORDS
Personnel
Type of Training
State SOP/ Training Signed by Trainee Module delivered
13. COMMISSIONING OVERVIEW
13.1. Equipment Operation
Equipment
Equipment Date run
No.
Operation/s & duration
Report Operated
Doc. No.
by:
13.2. Process Operation
Process
Date run
Operation/s & duration
OK Yes No
Report Operated
Doc. No.
by:
Prepared by:
Date Prepared:
Revision No: Page 16 of 17
................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- installation and operational qualification protocol
- installation and operational qualification protocol ioq
- sample installation qualification plan
- installation qualification operational qualification
- cdc program elisa installation qualification protocol
- cm130 installation qualification equipment qualification
- installation qualification and operation qualification iq oq
- creating a pharmaceutical installation qualification
- iq oq pq protocol installation qualification operation
- installation qualification protocol for hvac system of ahu 01
Related searches
- xfinity free installation promo
- equipment installation qualification
- installation qualification template
- installation qualification requirements
- installation qualification wiki
- installation qualification checklist
- installation qualification protocol template
- installation qualification sop
- equipment qualification template
- equipment installation qualification template
- installation qualification report
- fda equipment qualification gmp