Section 1 General Contract Requirements

Exhibits 1 through 4 are to be submitted along with the PBSW. Exhibit 5 is for the CO or designee, and Facility Manager. Exhibit 6 is to be included in SMART buildings running ... Aerial and scissor lifts, if used, must inspected before each use in accordance with 29 C.F.R.1910.67 (c) (2) (i) and the manufacturers specifications. C.5.4.6 Lock ... ................
................