Manufacturer

1. All equipment included on this list is approved to operate only at its designated phase and voltage level. Use on any other system configuration may require supplemental equipment to ensure compliance with the SIR. 2. Utility grade relays need not be certified per the requirements of the SIR, Section I.H. 3. ................
................