FORT LOUDOUN ELECTRIC COOPERATIVE



[pic]FORT LOUDOUN ELECTRIC COOPERATIVE

ELECTRIC RATES

(Effective January 2007)

 

Residential Rates – Schedule RS

      

Customer Charge:     $11.94 per month                                                                           

            Plus

Energy Charge           All Kilowatt hours - @$0.08199 per KWH

General Power Rate – Schedule GSA

GSA-1        

Demand less than 50 KW and less than 15,000 KWH

Customer Charge:                     $14.20 per month

 

Energy Charge:                         All Kilowatt hours @$0.09174 per KWH

GSA-2   

 Demand greater than 50 KW and less than 1,000 KW or less than 50 KW and greater than 15,000 KWH

Customer Charge:                     $14.20 per month

Energy Charge:                         First 15,000 kilowatt hours @$0.09174 per KWH

                                               Additional kilowatt hours @$0.04860 per KWH

Demand Charge:                       First 50 KW no charge

                                               Over 50 KW @$12.98 per KW

 

 

 

GSA-3

Demand greater than 1,000 KW or highest of 12 month billing demand greater than 15,000 KWH

Customer Charge:                     $14.20 per month

Energy Charge:                         All Kilowatt hours @$0.04981 per KWH

Demand Charge:                       First 1,000 KW @$13.06 per KW

                                               1,001 to 5,000 KW @$14.20 per KW

LP RATE SCHEDULE – OUTDOOR LIGHTING

Energy Charge: $0.06387 per KWH PLUS Facility Charge as listed below:

 

TYPE OF FIXTURE

WATTS

ENERGY KWH

ENERGY CHARGE

FACILITY CHARGE

TOTAL CHARGE

Mercury Vapor

175

70

$4.26

$2.74

$7.00

 

400

155

$9.43

$4.11

$13.54

 

1000

378

$22.99

$7.04

$30.03

High Pressure Sodium

100

42

$2.55

$4.18

$6.73

 

250

105

$6.39

$5.22

$11.61

 

400

165

$10.03

$7.02

$17.05

Metal Halide

400

174

$10.58

$7.02

$17.60

 [pic] Sweetwater Utilities Board

            SWEETWATER UTILITIES RESIDENTIAL RATES                   

 

A.                 Electric – Effective July 1, 2009

 

 

All Kilowatt Hours -----------------------

$ 0.08160 per Kilowatt hour

 

Customer Charge

$ 6.70

            B.        Water – Effective September 1, 2009

                        

 

1st 2,000 gallons-------------------------

$10.00 (minimum)

 

Next 50,000 gallons---------------------

$  3.34 per 1,000 gallons

 

Over 50,000 gallons---------------------

$  3.16 per 1,000 gallons

 

 

 

 

 

 

WATER SERVICE OUTSIDE CITY LIMITS 50% ADDITIONAL

C.            Sewer – Effective September 1, 2009

       

 

1st 2,000 gallons-------------------------

$10.00 (minimum)

 

Next 50,000 gallons---------------------

$  3.34 per 1,000 gallons

 

Over 50,000 gallons---------------------

$  3.16 per 1,000 gallons

 

 

SEWER SERVICE OUTSIDE CITY LIMITS 50% ADDITIONAL

D.            Gas – Effective July 1, 2009

       

 

General Gas Rate

 

 

 

All 100 cu. ft.

$   .88 per 100 cu. ft.

07/18/05

 

School Rate

 

 

 

All 100 cu. ft.

$   .86 per 100 cu. ft.

07/18/05

 

Customer Charge

$ 4.50

 

 

 

 

 

 

 

 

2.             COMMERCIAL PART 1 -               Effective July 1, 2009

   A.  

All Kilowatt Hours -----------------------

$0.08995 per Kilowatt hour.           

 

Customer Charge

$10.70

           

 

 

A.           Outdoor Lighting

 

BASE RATE

$   0.0742

 

 

175 watt MV

$   7.93

 

 

400 watt MV

$ 14.76

 

 

1000 watt MV

$ 33.17

 

 

100 watt HPS

$   7.48

 

 

250 watt HPS

$ 12.05

 

 

400 watt HPS

$ 17.62

 

 

1000 watt HPS

$ 33.69

 

 

 

  |  | | 

\

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[pic]



Gas Rates

Effective August 1, 2005

Customer Charge - $3.25

Therms used - 1.40

 

Process Load (Over 50,000 therms)

Fixed Cost - % of customer's daily demand to LUB fixed charges (demand, take or pay charges, SWS and FERC ordered charges).

 

Plus

Variable Charges - per therm charge for gas and commodity charge Plus

 

Margin - Less than 200,000 therms per month.

 

A.  Less than 200,000 therms per month

First 100,000 therms - $.044 per therm

Over 100,000 therms - $.037 per therm

 

B.  Over 200,000 therms per month

First 750,000 therms - $.024 per therm

Next 750,000 therms - $.022 per therm

Over 1,500,000 therms - $.020 per therm

 

CITY OF MADISONVILLE UTILITIES



WATER & SEWER RATES

EFFECTIVE JULY 1, 2008

 

|Gallons Per Month |Per 1,000Gallons |

|  |Inside |Outside |

|FIRST 2,000 (Minimum) |$11.82 |$22.00 |

|NEXT 13,000 |$4.04 |$5.90 |

|OVER 15,000 |$4.04 |$5.90 |

|  |  |  |

|Tap Fees |  |  |

|WATER TAP |$300.00 |$700.00 |

|SEWER TAP |$300.00 |$300.00 |

 

The Sewer Rates are the same as the Water Rates except that tax is added to water and not to sewer

 

 

TELLICO AREA SERVICES SYSTEM

 

| |

|Effective date July 1, 2009 |

|  |

| |

|  |

|  |

|  |

| |

|  |

|  |

|  |

| |

|First |

|2,000 gallons |

|minimum bill        $13.92 |

| |

|All over |

|2,000 gallons |

|$3.39/thousand gallons |

| |

|  |

|  |

|  |

| |

|Minimum bill on 1 inch and larger meters will stay at the minimum until water consumption reaches a |

|dollar value larger than the minimum bill. |

| |

|  |

|  |

|  |

| |

|METER SIZE |

|MINIMUM BILLUSAGE UP TO MINMUM |

| |

|¾ inch |

|    $13.92 |

|    2,000 gallons |

| |

|1 inch |

|    $22.40 |

|    4,500 gallons |

| |

|1 ½ inch |

|  $105.45 |

|  29,000 gallons |

| |

|2 inch |

|  $180.00 |

|  51,000 gallons |

| |

|3 inch  |

|  $261.40 |

|  75,000 gallons |

| |

|4 inch |

|  $515.65 |

|150,000 gallons |

| |

|6 inch |

|  $980.00 |

|287,000 gallons |

| |

|8 inch  |

|$1444.50 |

|424,000 gallons |

| |

|  |

|  |

|  |

| |

|REGULAR ¾ INCH WATER SERVICE FEE $900.00       |

|1 INCH WATER SERVICE FEE $1530.00       |

|2 INCH WATER SERVICE FEE $4530.00 |

|PLUS BORE COST IF APPLICABLE ON ALL METER SETS |

| |

|  |

|  |

|  |

| |

|APPROVED REDUCED PRESSURE ZONE BACK FLOW PREVENTERS REQUIRED ON ALL INDUSTRIAL TYPE SERVICES. |

| |

|  |

|  |

|  |

| |

|Fire Protection |

|  |

|  |

| |

|Sprinkler Size |

|Monthly Charge |

|  |

| |

|6 inch |

|  $81.05 |

|  |

| |

|8 inch |

|$121.57 |

|  |

| |

|10 inch            |

|$162.08 |

|  |

| |

|12 inch            |

|$202.61 |

|  |

| |

|  |

|  |

|  |

| |

|FIRE LINE SERVICE |

|To be determined by Tellico Area Services System on an individual basis. |

| |

|  |

| |

|DETECTOR CHECK WITH LEAK INDICATOR METER REQUIRED ON ALL FIRE LINE SERVICES |

| |

|  |

| |

|  |

 

 

|TASS 2009 WASTEWATER RATE SCHEDULE |

| |

|Effective date July 1, 2009 |

|  |

| |

|  |

|  |

|  |

| |

|First |

|2,000 gallons |

|minimum bill   $17.00 |

| |

|All Over |

|2,000 gallons   |

|$5.05/thousand gallons |

| |

|  |

|  |

|  |

| |

|METER SIZE |

|MINIMUM BILL |

|USAGE UP TO MINMUM |

| |

|¾ inch |

|    $17.00 |

|  2,000 gallons |

| |

|1 inch |

|    $30.00 |

|  4,500 gallons |

| |

|1 ½ inch |

|  $138.20 |

| 26,000 gallons |

| |

|2 inch |

|  $226.00 |

| 44,000 gallons |

| |

|3 inch |

|  $352.30 |

| 69,000 gallons |

| |

|4 inch |

|  $594.75 |

|117,000 gallons |

| |

|6 inch |

|$1104.75 |

|218,000 gallons |

| |

|8 inch |

|$1614.80 |

|319,000 gallons |

| |

|  |

|  |

|  |

| |

|REGULAR  SEWER SERVICE FEE $900.00       |

|PLUS BORE COST IF APPLICABLE ON ALL SEWER SERVICES |

|SEWER SERVICES WILL BE AT SAME COST OF WATER METER |

| |

|  |

|  |

|  |

| |

|TRDA Fee- $1500.00 if applicable in addition to sewer service fee. |

|Construction cost of Pump Systems - All construction cost of grinder pumps, step system or other |

|types of on-site system is to be paid by individuals or POA.  TASS will furnish standard |

|specifications and will inspect construction prior to making sewer service. |

| |

|  |

|  |

|  |

| |

|  |

| |

|  |

|  |

|  |

| |

|  |

|  |

................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download