Hydraulic Design Report Template

Sep 18, 2007 · The minimum required freeboard at this location based on bankfull width was X feet at the 100-year flow event. The water surface elevation is projected to increase by X feet for the 2080 projected 100-year flow rate. The minimum required freeboard at this site was increased to X.X feet at this site to accommodate climate resilience. If it is ... ................
................