SECTION 07 11 13 - BITUMINOUS DAMPPROOFING
SECTION 07 11 13BITUMINOUS DAMPPROOFINGSPEC WRITER NOTES:1. Delete text between //? ?// not applicable to project. Edit remaining text to suit project.2. Intended use is for exterior walls where no hydrostatic head occurs or is anticipated, as water percolates through the soil or in cavity spaces to weeps. Clearly identify location on drawings and interface with other waterproofing system with terminology consistent with specification section title.GENERALSUMMARYSection Includes:Bituminous dampproofing on //?concrete?// and //?masonry?// surfaces.RELATED workSPEC WRITER NOTE: Update and retain references only when specified elsewhere in this section.Section 03?00?00, CASTINPLACE CONCRETE: Concrete.Section 03?30?53, (SHORT FORM) CASTINPLACE CONCRETE: Concrete Foundation Walls.Section 04?20?00, UNIT MASONRY: Masonry Surfaces Below Grade.APPLICABLE PUBLICATIONSComply with references to extent specified in this section.ASTM?International (ASTM):C57819Rigid, Cellular Polystyrene Thermal insulation.D226/D226M17AsphaltSaturated Organic Felt Used in Roofing and Waterproofing.D449/D449M03(2014)elAsphalt Used in Dampproofing and Waterproofing.D122713(2019)e1Emulsified Asphalt Used as a Protective Coating for Roofing.D6380/D6380M03(2018)Asphalt Roll Roofing (Organic Felt).D6506/D6506M01(2018)e1Asphalt Based Protection Board for BelowGrade Waterproofing.SUBMITTALSSubmittal Procedures: Section 01?33?23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.Manufacturer's Literature and Data:Description of each product.Application instructions.DELIVERYDeliver products in manufacturer's original sealed packaging.Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.Before installation, return or dispose of products within distorted, damaged, or opened packaging.STORAGE AND HANDLINGStore products indoors in dry, weathertight //?conditioned?// facility.Protect products from damage during handling and construction operations.WARRANTYSPEC WRITER NOTE: Always retain construction warranty. FAR includes Contractor's one year labor and material warranty.Construction Warranty: FAR clause 52.24621, "Warranty of Construction."PRODUCTSSYSTEM PERFORMANCEControl moisture migration through concrete or masonry exterior walls where no hydrostatic head occurs or is anticipated.PRODUCTS - GENERALProvide each product from one manufacturer and from one production run.Hot Applied Bituminous Dampproofing:Asphalt: ASTM?D449/D449M, Type I.Cold Applied Bituminous Dampproofing:Asphalt: ASTM?D1227, Type III (spray grade).ACCESSORIESAsphalt Saturated Felt: ASTM?D226/D226M, Type I, 7?kg (15?pound).Protection Course: //?ASTM?D6506, 3?mm (1/8?inch) thick, semirigid sheets of fiberglass or mineralreinforcedasphaltic core, pressure laminated between two asphaltsaturated fibrous liners. // Smoothsurfaced roll roofing complying with ASTM?D6380/D6380M, Class S, Type III.?// Extrudedpolystyrene board insulation, unfaced, ASTM?C?578, Type?X, 13?mm (1/2?inch) thick.?//EXECUTIONPREPARATIONExamine and verify substrate suitability for product installation.Protect existing construction and completed work from damage.Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.Remove free water; surfaces may remain damp.INSTALLATION - GENERALInstall products according to manufacturer's instructions //?and approved submittal drawings?//.When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer’s Representative consideration.DAMPPROOFING INSTALLATIONApplications:Apply to surfaces where indicated on drawings.Apply dampproofing at 1?liter/square?meter (21/2 gallon per 100?square?feet), minimum, each coat.Allow 24 hours drying time between coats.Adhere protection course to conceal //?foundation?// dampproofing before backfilling.PROTECTIONProtect dampproofing and protection course from construction operations.Repair damage. - E N D - ................
................
In order to avoid copyright disputes, this page is only a partial summary.
To fulfill the demand for quickly locating and searching documents.
It is intelligent file search solution for home and business.
Related download
- read first this includes what is needed for a building
- medical safety template laboratory inspection checklist
- self inspection and declaration tool for newchapter
- elevation nc
- prosoco r guard specification
- section 07 11 13 bituminous dampproofing
- dealer requirements kentucky
- section 07 18 13 pedestrian traffic coatings
- section 07 21 19 open cell spray foam insulation
- environmental protection division
Related searches
- 07 career education corporation
- dodm 5205 07 volume 3
- 2 07 unit test biological basis
- vsa 17a 07 01 2019
- omb m 07 16 update
- 02 07 photosynthesis prezi
- 2 07 photosynthesis biology prezi
- ibc section 903 2 11 1
- assignment 07 01 evaluating a speaker
- dating sites for 11 13 year olds
- 07 01 evaluating a speaker worksheet
- 07 01 evaluating a speaker