Sample RFP Water - Mueller Systems

6.4.12 All Meters shall be 100% factory tested for accuracy and have the factory test results provided with each meter. 6.4.13 Meters shall be pressure tested to ensure against leakage. 6.4.14 Meters shall comply with the AWWA C710 accuracy requirements as specified in section 3.8 of the standard for a period of one year from the date of ... ................
................

To fulfill the demand for quickly locating and searching documents.

It is intelligent file search solution for home and business.

Literature Lottery

Related searches