SECTION 104 .us

Station 10+50 to Station 12+75 Lt. MTA has no facilities in this location, but plans on. installing a 4. inch PVC conduit for future use in a joint trench with MEA. All new facilities. along this segment will be installed 12 inches below the proposed depth of excavation of. the retaining walls. MTA will complete the above work in 11 calendar days. ................
................