Depreciation of Portable Modular Buildings

The destruction of the structural integrity of the building, the high cost of material loss due to disassembly, and the high costs of re-assembly. Relocation of site constructed structures regularly requires an entirely new review process of structural and systems approval, since the design of the structure did not initially consider, and was ... ................
................