SPD Information Systems Single Stage - World Bank

The most notable changes of this version include: (1) adopting the overall structure of the Plant Design, Supply and Installation SBD; (2) introducing support for electronic tendering; (3) expanding the suggested outline structure for the Technical Requirements; (4) including recurrent cost items for the warranty period in the contract while recurrent cost items for post-warranty are neither ... ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download