SECTION 104 .us

Also included is the asphalt material in the Prelevel/Leveling Course (rut repair) HMA and Temporary HMA as part of 401, Approach HMA as included in 401 or 639 and Pathway HMA as part of 608. 2. This provision shall only apply to cost changes in asphalt material that occur between the date of bid opening and the date the asphalt material is ... ................
................