Chapter V Site Environment Supervision



World Bank Loan Project

Hebei District Green Transport Improvement Project

Environment Management Plan

Tianjin Yongqing Environment Engineering Technilogy Consultant Co. Ltd

World Bank Project Management Office

Tianjin Construction Commission

July, 2018

Table of Contents

Chapter I General Introduction 1

1.1 Project Objective 2

1.2 Project Outline 3

1.3 China’s Framework of Laws and Regulations 4

1.3.1 Laws and Regulations 4

1.3.2 Technical Standards 7

1.3.3 Relevant Plans 8

1.3.4 Project Documents 8

1.3.5 Applicable Standards 8

1.4 World Bank Safeguard Policy 9

1.5 Environmental Sensitive Points 10

1.5.1 Ecological Protection Objective 10

1.5.2 Protection Objective for Environment Air and Sound Environment 10

1.5.3 Protection Objective of Cultural Relics 24

Table 1.5-2 Cultural Relics Protection Objectives 25

Chapter II Setting of Environment Management Planning Agency 35

2.1 Environment Protection Bureau (EPB) 36

2.2 Owner Party (Project Management Office) 37

2.3 Contractors (CET) 38

2.4 Construction Supervision Engineer (CSE) 39

2. 5 Independent Environmental Monitoring Consultant (EMC) 40

Chapter III Project Environment Impacts 42

3.1 Ecological Environment 42

3.2 Water Environment 43

3.2.1 Construction Period 43

3.2.2 Operation Period 43

3.3 Sound Environment 44

3.3.1 Construction Period 44

3.3.2 Operation Period 44

3.4 Environment Air 46

3.4.1 Construction Period 46

3.4.2 Operation Period 47

3.5 Solid Wastes 47

3.6 Accident Risks 48

3.7 Analysis on Social Environment Impacts 49

Chapter IV Mitigation Measures of Environment Impact 50

Chapter V Site Environment Supervision 89

5.1 Requirements of law and contract 89

5.2 Site supervision 89

5.3 Punishment system 90

5.4 Environment complaints 90

Chapter VI Environmental Monitoring Plan 91

6.1 Overview 91

6.2 Environmental monitoring 91

6.3 Monitoring equipment and records 93

Chapter VII Staff Training 95

Chapter VIII Reporting 97

8.1 Submission of contractor project document 97

8.2 Environment management plan report 97

8.3 Data Records 98

Chapter IX Environment Management Plan Budget 100

9.1 Environment investment estimation 100

9.2 Annual operation expenses of environment protection facilities 102

Chapter I General Introduction

Environment Management Plan (EMP) is prepared by Tianjin Yongqing Environment Engineering Technilogy Consultant Co. Ltd (TYEETC) for World Bank Loan Tianjin Urban Transport Improvement Project (Project). The Environment Management Plan is prepared in accordance with major conclusions and suggestions of Project Feasibility Study Report and Project Environment Impact Assessment Report (EIA) and includes the major contents of setting of organization institution for implementation of the environment management plan, major environment problems in the project implementation and operation, environment mitigation measures in all stages of the project, monitoring plan and report regulation and training plan and cost budget. In the project assessment stage, EMP shall be reviewed and approved by World Bank Project Management Office of Tianjin Construction Commission (PMO) and shall be fully executed in the project implementation stage.

Environment assessment is very important in the preparation process of the project to be constructed, and aims at predicting the potential impacts of the project to be constructed on the social environment and natural environment and formulating the environment impact mitigation plan. In the project preparation stage, the environment impact report is prepared to ensure that the environment problems can be fully solved and include these problems into all stages; Environment Management Plan is to propose measures and solutions for removing, reducing or mitigating adverse environment impacts and reducing the negative environment impacts to acceptable level. The environment management plan shall be carried out as part of the environment assessment work. In the project solution design process and environment assessment project, we shall full consider various factors such as project cost, and finally determine the recommendation solution based on minimized environment impacts.

The environment impact assessment has been carried out as part of the project preparation and assessment, and the Environment Management Plan (EMP) has been formulated as part of environment impact assessment report. The report is prepared based on the environment impact assessment process, especially the identified adverse impacts in the project construction and operation period as well as corresponding mitigation measures to meet national and local environment standards and conform with applicable safety safeguard policies of World Bank. The environment assessment documents including the Environment Management Plan are the interactive products of project design personnel, and are also the comparative products of project solution design and environment sensitive targets protection solution to minimize the potential environment and social impacts of the project to be constructed.

To ensure the effective and feasible implementation of Environment Management Plan, the cost budget of environment protection measures shall be listed into the project budget in the project preparation stage, various environment mitigation measures shall be included into the technical specifications for project procurement, environment management training shall be carried out for project managers, executors, construction supervision units and construction units, and training cost and consultancy fee for environment management plan shall be included into the total project investment estimation. Meanwhile, the project owner will employ qualified and experienced environment monitoring consultants (EMC) to carry out independent external supervision work, supervise whether the construction units perform various environment protection measures in accordance with bidding documents and also supervise the validity and rationality of various environment protection measures proposed in the project preparation stage to provide further suggestions for optimizing and enhancing the environment stage in the construction period and operation period.

1 Project Objective

The proposed Urban Transport Improvement Project of Tianjin by Using the World Bank Loans (hereinafter referred to “Tianjin Urban Transport” or proposed project) is located in Tianjin. The project applies loans of RMB700.6376 million from the World Bank, and Project Development Objective (PDO) is to improve the service capability and efficiency of urban infrastructures;

Quiet design to raise transit efficiency;

In the project area: widen pedestrian and NMV lanes, improve junctions, add focilitities of protection poles, rails and safty islands, add seperation belt when conditions allow, so that to increase slow traffice only area to 50% for safety;

Reasonably arrange road side parking areas and facilities to realize a 100% legal parking;

Add facilities of rails and signs to increase transfer rate between pidestrian and metro by 5

%;

Arrange bike parking area around stations to increase transfer rate between cyclists and metro by 7%;

Construct sponge city works to add road vitality and increase street greening rate by 10%, annual total net flow control rate to 63%, with a rain water usage rate of 4.0%.

Reconstruct current drainage network to realize a drainage/sewage seperation rate of 100%.

Figure 1.1-1 Geographic Location Map of Tianjin Urban Transport Improvement Project

2 Project Outline

This project is outside of Tianjin Urban Transport Improvement Project, at a different location, and limitted to 46 roads in Hebei District. Project includs 2 major sub-projects, Technical Assistance (TA) and Road Network System Improvement, which covers four sub-projects: Non Motor Traffic road construction, overhead lines entry ground, drainage reconstruction, sponge city greening construction and ancillary facilities.

Road network smoothing system project includes: 1) Slow road works: demolish seperation facilities between motored an non-motered vehical lanes and sidewalks of 564.3 thousand m2, construct vehicla lanes, sidewalks, pedestrian roads and bikelanes of 532.8 thousand m2, new traffic mark lines of 149.7 thousand m, traffic signs of 616, MV and NMV seperations of 46.1 thousand linear meters, 87.3 thousand seperation poles, 124 safety islands, bus-stop sheds of 4350 m2, and ralated roadside parking management systems and smart traffic sytems, relocation of current 555 road lights, 706 scenery road lights, power line rearrangement of 28.5 thousand m and new power lines of 33.6 thousand m; 2) powerline imbedment works: removal of 1002 poles, imbedment of 4-6 hole power pipeline of 25.8 thousand m and 4-6 hole communication pipeline of 25.8 thousand m, together with construction of concerned pipeline utilities; 3) Drainage improvement works: new d300 collection branch pipelines of 35 thousand m, new collection wells of 3167, new d400-d2600 drainage pipeline of 8378m, new d400 sewage pipeline of 7422m and concerned pipeline utilities; 4) Spontage city greening works and auxiliary facilities: new roadside green belt and side seperation green belt of 39.2 thousand m2, replanting of 3691 trees, construction of roadside rain water gardens of 1500 m2; 121 new roadside benches and 1408 trash bins.

TA project includes: research on green transport development strategy in center city area in Tianjin; research on motor development policies and green gas emission in Tianjin; policy support system for optimizing public transit network in center city area; research on public bicycle management and operation model; multi-channel financing mechanism for sustainable development of urban road smoothing project; implementation standards for urban disaster prevention and recovery system project; demonstration platform for disaster prevention and recovery system; and advertising and promotion for comprehensive improvement of urban transport.

Project improves 46 roads in an area of 4.5 km2 in Hebei District, with a road length of 35.22 km and a total road area of 900.8 thousand m2. Project plans to start construction in Dec, 2018 and to be completed and accepted in Nov, 2020, with a construction period of 24 months. Total construction cost is estimated to be RMB700.6376 million, and one-time environment investment is RMB25.01 million, 3.57% of the total.

3 China’s Framework of Laws and Regulations

1 Laws and Regulations

Law of Environmental Protection of the People's Republic of China (Jan, 2015);

Environmental Impact Assessment law of the People's Republic of China (September, 2016);

Law of Land Administration of the People's Republic of China (August 28, 2004);

Law of The People's Republic of China on Water and Soil Conservation (March 1,2011);

Law of the People's Republic of China on the Prevention and Control of Atmospheric Pollution (Jan, 2016);

Law of the People's Republic of China on the Prevention and Control of Water Pollution (Revised in 2017);

Law of the People's Republic of China on Prevention and Control of Pollution From Environmental Noise (March 1, 1997);

Law of the People's Republic of China on Prevention of Environmental Pollution Caused by Solid Waste (Revised in 2016);

Law of the People's Republic of China on Response to Emergencies (November 1, 2007);

Law of the People's Republic of China on the Protection of Cultural Relics (Revised in 2017);

Highway Law of the People's Republic of China (August 28, 2004);

Cleaner Production Promotion Law of the People's Republic of China (March 2, 2012);

Circular Economy Promotion Law of the People's Republic of China (August 29, 2008) (President Decree [2008] No.4 of the People’s Republic of China);

Regulations on the Administration of Construction Project Environmental Protection (Decree [2017] No.682 of the State Council of the People’s Republic of China);

Decision of the State Council on Implementing Scientific Outlook on Development and Enhancing Environment Protection (the State Council Decree [2005]No.39)

Measures for Environment Protection Management of Transport Construction Project (Decree [2003] No. 5 of the Ministry of Transport of the People’s Republic of China);

Notice on Environment Supervision of Transport Project (Decree [2004] No. 314 of Transport and Environment of the Ministry of Transport of the People’s Republic of China);

List of Classified Management of Environment Impact Assessment of Construction Project (Decree [2017 No. 44] of the Ministry of Environment Protection of the People’s Republic of China and 2018 Rivision);

Notice on Relevant Problems of Environment Noise in Environment Impact Assessment on Construction Projects of Highway, Railway and Others (Decree [2003] No. 94 of Environment);

Interim Method for Public Participation in Environment Impact Assessment (Decree [2006] No.28 of Environment);

National Proposal for Response to Emergent Environment Incidents (January 24, 2006);

Regulation on the Safety Management of Hazardous Chemicals (Decree No. 591 of the State Council of the People’s Republic of China);

Provisions on the Administration of Road Transport of Dangerous Goods (Decree [2010] No.9 of the Ministry of Transport of the People’s Republic of China);

Notice on Enhancing Highway Plan and Building Environment Impact Assessment (Decree [2007] No. 184 of Environment);

Technical Policy for Noise Pollution Prevention and Treatment of Ground Transport (Decree [2010] No.7 of Environment)

Guiding Suggestions on Enhancing Prevention and Treatment of Environment Noise Pollution and Improving Urban and Rural Sound Environment Quality (Decree [2010] No. 144 of Environment);

Tianjin Municipal Management Method for Environment Protection of Construction Project (Decree No.58 of Tianjin People’s Government) (2015 Rivision)

Tianjin Municipal Regulation on Air Pollution Control (revised in 2017);

Tianjin Municipal Management Method for Environment Noise Pollution Control (Decree [2003] No.6 of Tianjin People’s Government);

Tianjin Municipal Regulation on Urban Landscaping (2004);

Tianjin Construction Standards for Urban Road Landscaping (2004);

Tianjin Municipal Management Method for Water Pollution Control (Decree [2004] No. 67 of Tianjin People’s Government);

Tianjin Municipal Interim Method for Dust Prevention and Management of Construction Site (Tianjin Municipal Urban and Country Construction and Transportation Committee Decree [2004]149);

Decision for Enhancing Environment Protection and Optimizing Economic Growth (JZ [2006] No.86);

Tianjin Municipal Regulation on Civilized Construction (Decree [2006] No. 100 of Tianjin People’s Government);

Tianjin Municipal Regulation on Domestic Wastes (implemented as of May 1, 2008);

21 Prohibitions for Construction in Tianjin (September, 2009);

Letter for Adjustment of Division of Applicable Areas of in Tianjin (JHBGH [2015] No. 590 of Tianjin Municipal Bureau of Environment Protection);

Tianjin Method for Implementation of Administrative License for Engineering Sediment Discharge (JRH [2005] No. 162 Document)

Notice of Tianjin People’s Government on Issuing Clean Air Action Plan (JZF [2013] No.35);

Tianjin People’s Governmen Office Notice on Tianjin Heavy Pollusion Weather Contingency Plan (Jinzhengban [2017] No. 107, Oct, 26, 2017)

Decision of Executive Committee of Tianjin People’s Congress on Approval of Division of Ecological Area for Permanent Protection, 2013 (No.1 Notice of Executive Committee of Tianjin People’s Congress);

2 Technical Standards

(1) Technical Guideline for Environment Impact Assessment-General Principle, HJ2.1-2016;

(2) Technical Guideline for Environment Impact Assessment-Atmospheric Environment, HJ2.2-2008;

(3) Technical Guideline for Environment Impact Assessment-Surface Water Environment, HJ/T2.3-93;

(4) Technical Guideline for Environment Impact Assessment-Sound Environment, HJ2.4-2009;

(5) Technical Guideline for Environment Risk Assessment of Construction Project,HJ/T 169-2004;

(6) Technical Guideline for Environment Impact Assessment-Ecological Impact, HJ/T19-2011;

(7) Technical Standard for Acceptance of Environment Protection for Completion of Construction Project-Ecological Impact, HJ/T394-2007;

(8) Environment Impact Assessment Standard of Highway Construction Project, JTGB03-2006;

(9) Technical Standard for Urban Dust Pollution Control, HJ/T393-2007, the State Bureau of Environmental Protection;

(10) Water and Soil Loss Control Standard of Development Construction Project (GB50434-2008);

(11) Water and Soil Loss Reservation Technical Specifications of Development Construction Project (GB50433-2008).

3 Relevant Plans

Tianjin General Urban Plan (2005-2020);

Tianjin Municipal Thirteenth Five-year Plan on Integrated Transportation;

Tianjin Intelligent Transport Plan for Center City Area;

Tianjin Plan for Pedestrian Facilities in Center City Area;

Tianjin Special Public Transport Plan;

Tianjin General Plan for National Road Transport Junction;

Tianjin Plan for Passenger and Freight Transport Hubs;

4 Project Documents

1) Technical Contract for Project Assessment signed by project entrusting unit and

2) Feasibility Report for Tianjin Hebei District Green Transportation Improvement Works by Tianjin Tianle International Engineering Consulting Co., Ltd., May, 2018;

5 Applicable Standards

The applicable standards for environment impact assessment are as follows according to environmental function zoning requirements.

Atmospheric Environment

Refer to table 1.3-1 for Environment Air Quality Standard GB3095-2012) Class 2.

Table 1.3-1 Environment Air Quality Standard Unit: mg/Nm3

|Pollutant |Density limit |Remark |

| |Annual Average |24Hour Average |1Hour Average | |

|SO2 |0.06 |0.15 |0.50 | |

|NO2 |0.04 |0.08 |0.20 | |

|PM10 |0.07 |0.15 |—— | |

|PM2.5 |0.035 |0.075 |—— | |

|NOX |0.05 |0.1 |0.25 | |

|CO |—— |4 |10 | |

|O3 |—— |0.16* |0.2 | |

Sound Environment

Residential areas in the project assessment area shall follow Type II, 4a standards of Sound Environment Quality Standard (GB3096-2008). The relevant standards in the Construction Site Boundary Environmental Noise Emission Standards (GB12523-2011) shall be implemented The standard values are shown in table 1.3-2, 1.3-3.

Refer to table 1.3-2, 1.3-3 Sound Environment Quality Standard for specific standard value.

Table 1.3-2 Sound Environment Quality Standard (GB3096-2008) dB(A)

|Type |Day Time dB(A) |Night Time dB(A) |

|2 |60 |50 |

|4a |70 |55 |

Table 1.3-3 Environment Noise Discharge Standard Within Construction Boundary (GB12523-2011) dB(A)

|Day Time |Night Time |

|70 dB |55 dB |

4 World Bank Safeguard Policy

Environmental Assessment (OP/BP4.01,1999.1)-the policy shall be fully applied.

Natural Habitats (OP4.04,2001.6)-the project does not involve important natural habitats defined in the policy and the policy is not applicable.

Pest Management (OP4.09,1998.12)-the project does not involve plant diseases and insect pests and the policy is not applicable.

Indigenous People (OP4.10,1991.9)-people with aboriginal characteristics defined in OP4.10 are not found and the policy is not applicable.

Physical Cultural Resources (OP4.11,1999.8)-protected cultural resources are involved in the surrounding areas of the project and the policy is applicable.

Involuntary Resettlement (OP4.12,2001.12)-the project involves no resettlement and the policy is not applicable.

Forests (OP4.36,1993.9)-the project does not involve land for forests use and the policy is not applicable.

Safety of Dams (OP4.37,2001.10)-the project does not involve dams, and the policy is not applicable.

Projects on International Waterways (OP7.50,2001.6) the project does not involve international waterways, and the policy is not applicable.

Projects in Disputed Areas (OP7.60,2001.6)-the project does not involve disputed areas, and the policy is not applicable.

Disclosure of Information (BP17.50,1993.9)-the policy shall be fully used in the project.

Environmental, Health, and Safety Guidelines International Financing Company (IFC), World Bank (WB) General Guideline for Environment, Health and Safety-the policy shall be fully used in the project.

5 Environmental Sensitive Points

1 Ecological Protection Objective

The ecological protection objective mainly includes temporary land use and vegetable in the scope of land use.

2 Protection Objective for Environment Air and Sound Environment

Determine the protection objective for noise and atmospheric environment according to the project characteristics and site survey and investigation results, and summarize the environment protection objectives for sub-projects according to the characteristics of the project.

1) Green transport (slow travel system) improvement project in the core zone of center city area mainly refers to protection objectives of sensible targets around the roads in the construction period, and mainly involves Hebei District. The results are shown as table 1.5-1.

Table 1.5-1 Environment Protection Objectives of Project

|No |Name |Direction&Distance |Scale |Road Name |

| |Jinyuan Building |South side,15m |1residencebuilding |ZhongshanluZhongshanlu(Ligong|

| | | | |cidajieYuanweiluLigongcidajie-|

| | | | |Yuanweilu-Huangweilu) |

| |Penglaixinli |South side,3m |2 residence buildings | |

| |Commercial Bank(Tianjin Zhongshanlu |South side,5m |1office building | |

| |Branch) | | | |

| |Chuanyunli Community |South side,3m |5 residencebuildings | |

| |Bank of China(Tianjin Zhongshanlu |South side,5m |1office building | |

| |Branch) | | | |

| |Jinhuili |South side,2m |1residencebuilding | |

| |Tianjin No 2 Hospital |North side,40m |1clinic building | |

| |Tianjin Wanke Center |North side,5m |1office building | |

| |Tianjin Fine Arts College |North side,5m |1 fine arts museum | |

| |Yuankangli |North side,3m |1residential building | |

| |Yuanjili |North side,3m |1residential building | |

| |Junminli |East side,3m |3residential buildings |Wumalu(LigongcidajieLigongcid|

| | | | |ajie-Huangweilu) |

| |Ouwenxipu Kindergarden |East side,20m |1classroom building | |

| |Yuantaili |West side,3m |3residential buildings | |

| |Tianjin Fine Arts School |West side,3m |1classroom building | |

| |Yuyingli Primary School |West side,3m |1classroom building | |

| |Renheng River Garden |West side,23m |1residential building | |

| |Hebei District State Tax Bureau |West side,2m |1office building |ShengliluShenglilu(Haihedongl|

| | | | |uJianguodaoHaihedonglu-Jianguo|

| | | | |dao) |

| |Appart.Haihejinwan Apart. |West side,7m |2 residential buildings | |

| |Shanlinli |West side,15m |1 residence building | |

| |Banyunli |West side,7m |1 residence building | |

| |Shananli Community |East side,7m |1 residential building |Shenglilu(Jianguodao-Jinweilu|

| | | | |) |

| |Guangfudao Police Station |West side,30m |1office building | |

| |Tianjin Shiyan Hebei Wanghai School |West side,25m |1classroom building | |

| |Qinhai Apart. |West side,12m |2 residential buildings | |

| |Longxinli |West side,7m |1residential building | |

| |Reihaimingyuan |West side,25m |2 residential buildings | |

| |Yangshanli |South side,5m |1 residential building |ShengliluShenglilu(Jinweilu-K|

| | | | |unweilu) |

| |Yangshanli |South side,5m |3 residential building | |

| |Yingyue Apart. |South side,5m |1 residential building | |

| |Defenghuayuan |South side,5m |1 residential building | |

| |Heibei Teacher Training School |North side,15m |1 classroom building | |

| |Kunweilu No 1 School Branch |North side,85m |1classroom building | |

| |Beianhuating |North side,15m |4 residential buildingss | |

| |Changhai Apart. |North side,7m |2 residential buildings | |

| |Shenghai Apart. |North side,7m |1 residential building | |

| |Tianjin Power Co. |East side,12m |1office building |Wujinglu(Haihedonglu-Ziyoudao|

| | | | |) |

| |Tongyuli8 |East side,20m |2residential buildings |Wujinglu(Ziyoudao-Jinbudao) |

| |Tianjin Modern Woman Hospital |East side,20m |1inpatient building | |

| | | |1 clinic building | |

| |Guoyin Building |West side,10m |1office building |Wujinglu(Jinbudao-Jianguodao |

| | | | |) |

| |Tianjin 254 Hospital |East side,17m |5clinic building |Huangweilu(Bamalu-Wumalu) |

| |254 Hospital Community |West side,5m |1residential building | |

| |Hongshunli 254 Community Committee |West side,3m |1office building | |

| |Yuantaili |West side,20m |3residential building | |

| |Tianjin Modern Art School |West side,3m |1residential building | |

| |Jinzhen Apart. |East side,30m |3residential building |Jinweilu(Zhongshanlu-Shenglil|

| | | | |uShenglilu) |

| |Jinzhaoyuan |East side,7m |2residential building | |

| |Jinhai Gargen |East side,7m |2residential building | |

| |Futai Appart. |East side,7m |1residential building | |

| |Zhenhaili |East side,7m |2residential building | |

| |Hongji Appart. |East side,7m |2residential building | |

| |Jinshiwenqiuan Appart. |East side,6m |2residential building | |

| |Fuxiyuan |East side,6m |1residential building | |

| |Guangfudao Pollice Station |West side,30m |1office building | |

| |Jiahai Garden |West side,20m |3residential building | |

| |Jinhaian Appart. |West side,20m |3residential building | |

| |Jinguli |West side,6m |4residential building | |

| |Jinchenyuan |West side,6m |3residential building | |

| |Jinhuijiayuan |West side,7m |6residential building | |

| |Jinhuili |West side,2m |2residential building | |

| |Hebei District Congress Standing |North side,20m |1office building |Jinbudao(Haihedonglu-Wujinglu|

| |Committee | | |) |

| |CCTV Finance&Economy Channel,Spot |North side,15m |1office building | |

| |Market Studio | | | |

| |Tianjin TV Tech. Research Institute |North side,10m |1office building | |

| |Guoyin Building |North side,10m |2office building | |

| |Tianjin Norde Center |North side,12m |3residential building |Luweilu(Bamalu-Zhongshanlu) |

| |Tianjin Railway No 1 School |North side,10m |1office building | |

| |ludili |North side,10m |4residential building | |

| |Zerenli |North side,10m |2residential building | |

| |Tianjin Norde Center |South side,30m |3residential building | |

| |No 35 Yard |South side,3m |2residential building | |

| |Zhonghui Building |South side,5m |1office building | |

| |Jingjin Hospital |South side,5m |1clinic building | |

| |Guangyuanli Building |South side,30m |1residential building | |

| |Zhongshan Building |South side,7m |1office building、1residential | |

| | | |building | |

| |Shouchuang Metropolitan |East side,65m |1residential building |Kunweilu(Zhongshanlu-Shenglil|

| | | | |uShenglilu) |

| |Juteng Appart. |East side,15m |3residential building | |

| |Kunweilu No 1 Prim. School |East side,55m |1classroom building | |

| |Hebei Administration Permission |East side,12m |1office building | |

| |Service Center, Hebei Construction | | | |

| |Commission | | | |

| |Kunpuli |East side,3m |2residential building | |

| |Kunshili |East side,3m |1residential building | |

| |Kunshiyuan of Hebei No1 Kindergarden |East side,40m |1classroom building | |

| |Kunyunli |East side,3m |2residential building | |

| |State Power Grid Co., Tianjin Tianjin|East side,3m |2office building | |

| |Branch | | | |

| |Kunfengli |East side,6m |1residential building | |

| |Tianjin No 2 Middle School |East side,12m |3classroom building | |

| |Beidou Garden |East side,42m |2residential building | |

| |Kunweilu No 1 Prim. School Branch |West side,15m |1classroom building | |

| |Hebei Teacher Training School |West side,15m |1classroom building | |

| |Kunhongli |West side,3m |2residential building | |

| |Jinkunli |West side,3m |2residential building | |

| |Hebei Branch of Traffic Police |West side,3m |1office building | |

| |Hebei Planning Bureau |West side,3m |1office building | |

| |Hebei News Building |West side,18m |1office building | |

| |Wanghailou Community Service Center |West side,15m |1 Clinic Building | |

| |Huisen Middle School |West side,22m |1classroom building | |

| |Jiandeli |West side,3m |2residential building | |

| |Chunliu Appart. |West side,15m |1residential building | |

| |No 57 Middle School |West side,55m |2classroom building,1office | |

| | | |building | |

| |Qianhuayuan |West side,5m |1residential building | |

| |Hebei Beiyang Hospital |North side,6m |1clinic building |Shizilindajie(Haihedonglu-Kun|

| | | | |weilu) |

| |Hebei District Govern. |North side,15m |1office building | |

| |Hebei Private Economy Service Center |North side,9m |1office building | |

| |Taihong Building |North side,10m |1office building | |

| |JinhaianAppart. |North side,15m |3residential building | |

| |Milan jinshijiayuan |North side,10m |6residential building | |

| |Kunweilu No 1 Prim. School Branch |South side,35m |1classroom building | |

| |Beianhuating |South side,15m |3residential building | |

| |State Audit |South side,7m |1office building | |

| |Jinshi Spring Appart. |South side,7m |3residential building | |

| |Jiahai Garden |South side,15m |4residential building | |

| |Wanghai International Square |South side,7m |2office building | |

| |Tiangu Appart. |West side,14m |2residential building |Sanmalu(Ligongcidajie-Luweilu|

| | | | |) |

| |Tuanjie li |West side,8m |3residential building | |

| |Hebei |West side,9m |1office building | |

| |District Court of Law | | | |

| |Shengtianli Community |West side,7m |3residential building | |

| |Sanrongli Community |West side,7m |3residential building | |

| |Hebei Women & Children Hospital |West side,7m |1clinic building | |

| |Yihai Appart. |West side,10m |2residential building | |

| |Yongnianli |West side,5m |1residential building | |

| |Tianjin No2 Middle School, Junior |West side,25m |1classroom building | |

| |Part | | | |

| |Tianjin No57 Middle School |West side,70m |1classroom building | |

| |Chenyue Building |North side,15m |1office building | |

| |Hebei Road Management Office |North side,12m |1office building | |

| |Chenrunli |North side,12m |1residential building | |

| |Zhonghui Building |North side,12m |2office building | |

| |Zhongshan Building |South side,35m |1office building | |

| |Guangyuanli Building |South side,5m |1residential building | |

| |Tianjin Railway Procuratorate |South side,10m |2office building | |

| |Chenquli |South side,7m |4residential building | |

| |Yuehaoli |South side,7m |1residential building | |

| |Xinkai Prim. School |East side,60m |1classroom building | |

| |Riyingli |East side,7m |2residential building | |

| |Baoxingli |East side,7m |5residential building | |

| |Erxianli |East side,7m |3residential building | |

| |Hebei District Archives Bureau |East side,7m |1office building | |

| |Qiushli |East side,7m |2residential building | |

| |Diweilu 17 Building |East side,9m |1residential building | |

| |Hebei City Appearance and Gardening |East side,7m |1office building | |

| |Commission | | | |

| |Tianjin No 2 Hospital |East side,27m |2 clinic/hospital building | |

| |Jinyuan Building |North side,17m |1residential building |Jinhaidao(Haihedonglu-Jinzhon|

| | | | |glu) |

| |Jinzhong Appart. |North side,4m |4residential building | |

| |Jinmingli |North side,4m |2residential building | |

| |Muzhai Middle School |North side,64m |1classroom building | |

| |Jinbiyuan |North side,4m |2residential building | |

| |Jinhuijiayuan |North side,7m |1residential building | |

| |Jinzhaoyuan |North side,7m |2residential building | |

| |Jinxiali |North side,4m |1residential building | |

| |Jinboli |North side,4m |4residential building | |

| |Jintian Garden |South side,4m |3residential building | |

| |Jinhai Garden |South side,4m |2residential building | |

| |Jinchenyuan |South side,4m |2residential building | |

| |Jinmengyuan |South side,4m |2residential building | |

| |Jinzhongjiayuan |South side,4m |2residential building | |

| |Wanghailoubeili |South side,4m |3residential building | |

| |Wanghai Church |South side,7m |1residential building | |

| |Zhendeli |North side,11m |1residential building |Jintiandao(Jinweilu-Jinzhongl|

| | | | |u) |

| |Futai Appart. |North side,7m |1residential building | |

| |Jintian Appart. |North side,7m |1residential building | |

| |Jintian Garden |North side,7m |2residential building | |

| |Hongji Appart. |South side,7m |1residential building | |

| |Milan Jinshijiayuan |South side,7m |3residential building | |

| |Hebei Experiment Prim. School |South side,10m |1classroom building | |

| |Renhenghebin Garden |East side,25m |2residential building |Ligongcidajie(Qimalu-Zhongsha|

| | | | |nlu) |

| |Ligongci Jiandao No 2 Building |East side,28m |1residential building | |

| |Riyuanli |North side,3m |1residential building |Riweilu(Wumalu-Zhongshanlu) |

| |Yongnianli |North side,3m |3residential building | |

| |Xinkai Prim. School |North side,80m |1classroom building | |

| |Yuejiaoli |North side,3m |1residential building | |

| |Fuhai Appart. |North side,12m |2residential building | |

| |Riguangli |South side,5m |2residential building | |

| |Riyingli |South side,3m |2residential building | |

| |Yihai Appart. |South side,5m |4residential building | |

| |Rizhaoli |South side,3m |1residential building | |

| |Rizhao Appart. |South side,5m |2residential building | |

| |Yueguiyuan |West side,5m |4residential building |Chenweilu(Bamalu-Zhongshanlu |

| | | | |) |

| |Hebei Procuratorate Bureau |West side,5m |1office building | |

| |Simalu No 8 Yard |West side,9m |1residential building | |

| |Tianjin No 57 Middle School |West side,3m |1classroom building | |

| |Hebei Environ. Sanitation Bureau |West side,22m |1office building | |

| |Chenyue Building |West side,4m |1residential building | |

| |Yuehao li |South side,7m |1residential building | |

| |Tianjin Shangshan Traditional |South side,3m |1clinic building | |

| |Medicine Hospital | | | |

| |Yuyang Appart. |South side,5m |1residential building | |

| |Jinxiuyuan |North side,7m |1residential building | |

| |Pingyunli |North side,7m |1residential building | |

| |Chenyuli |North side,7m |1residential building | |

| |Chenrunli |East side,5m |1residential building | |

| |Chenliangli |East side,5m |2residential building | |

| |Norcheng Garden |East side,14m |2residential building | |

| |Jingtian Building |East side,3m |1residential building |gangweilu(Zhongshanlu-Dongsij|

| | | | |inglu) |

| |Qianhuayuan |East side,3m |1residential building | |

| |Tianjin No 57 Middle School |East side,7m |1classroom building | |

| |Jinboli |East side,7m |2residential building |Jinxialu(Zhongshangongyuanlu-|

| | | | |Chenweilu) |

| |Jintian Garden |East side,5m |5residential building | |

| |Jintian Appart. |East side,10m |4residential building | |

| |Futai Appart. |West side,4m |3residential building | |

| |Hebei Wanghailou Pollice Station |West side,7m |1office building | |

| |Zendeli |West side,7m |2residential building | |

| |Jinhai Garden |West side,7m |2residential building | |

| |Jinxiali |West side,5m |1residential building | |

| |Zhongyuanli Community |West side,5m |2residential building | |

| |Renhehebin Garden |North side,22m |4residential building |Qimalu(Ligongcidajie-Yuanweil|

| | | | |u) |

| |Renhehebin Garden |South side,30m |3residential building | |

| |HongshuiliCommunity Medical Service |South side,20m |1office building | |

| |Center | | | |

| |Caierfang Kindergarden |South side,70m |1classroom building | |

| |Tianjin No 57 Middle School |North side,7m |1office building |Dongsijinglu(Gangweilu-Kunwei|

| | | | |lu) |

| |Chunliu Appart. |South side,25m |3residential building | |

| |Jinzheng Appart. |North side,10m |1residential building |Jinzhonglu(Jinweilu-Shizilind|

| | | | |ajie) |

| |Zhongyuli |North side,7m |2residential building | |

| |Jinlanyuan |North side,25m |1residential building | |

| |Jinlei Garden |North side,7m |4residential building | |

| |Jinzhaoyuan |South side,7m |1residential building | |

| |Zhongyuanli Community |South side,7m |4residential building | |

| |Jinboli Community |South side,5m |4residential building | |

| |Jinkunli |East side,9m |1residential building | |

| |Kunhongli |East side,9m |1residential building | |

| |Tianjin Fuyuan |East side,35m |1office building | |

| |occupational training school | | | |

| |Jintian Garden |West side,5m |3residential building | |

| |Milan Jinshijiayuan |West side,7m |5residential building | |

| |Minsheng Building |North side,7m |1office building |Boaidao(Shenglilu-Wujinglu) |

| |Yuanyang Building |South side,10m |1office building | |

| |Junlin Building |South side,10m |1office building | |

| |Tianjin Fine Art College |South side/North |6office,classroom buildings |Tianweilu(Sanmalu-Zhongshanlu|

| | |side,4m | |) |

| |254 Hospital Kindergarden |North side,10m |1classroom building |Yuanweilu(Bamalu-Zhongshanlu |

| | | | |) |

| |254 Hospital Community |North side,12m |5residential building | |

| |Yuanheli |North side,3m |1residential building | |

| |Tianjin Fine Art Middle School |North side,5m |2classroom building | |

| |Junminli |North side,7m |2residential building | |

| |Tuanjieli |North side,7m |2residential building | |

| |Qiushili |North side,7m |5residential building | |

| |Hebei Central Prim. School |North side,7m |2classroom building | |

| |Yuanjili |North side,7m |2residential building | |

| |Renhenghebin Garden |South side,15m |3 residential building | |

| |Caier Kindergarden |South side,15m |1 classroom building | |

| |Yuyingli Prim. School |South side,15m |1office building | |

| |Tianjin Fine Art College |South side,10m |1dormitory building | |

| |Yuankangli |South side,12m |1residential building | |

| |ChuanyunliCommunity |North side,15m |1residential building |Xiangweilu(Zhongshanlu-Jiangu|

| | | | |odao) |

| |Jingminli |North side,5m |4 residential building | |

| |Jinzhong Appart. |South side,5m |4 residential building | |

| |Jinmengyuan |East side,12m |4 residential building | |

| |Jintingli |East side,3m |5 residential building | |

| |Hongtai Building |East side,3m |1office building | |

| |Jiahai Garden |East side,9m |1 residential building | |

| |Wanghaigongfu |East side,15m |3 residential building | |

| |Rhuihaimingyuan |East side,15m |6 residential building | |

| |Tianjin Baijinwan |West side,10m |2 office building | |

| |Tianjin Haihe Yuerongzhuang |West side,20m |1 office building | |

| |Wanghai International |West side,20m |2 office building | |

| |Jinzhongjiayuan |West side,5m |1residential building | |

| |Jinzeli |West side,3m |1residential building | |

| |Guandi No 3 |West side,10m |4 residential building |Pinganjie(Jianguodao-Shenglil|

| | | | |u) |

| |Buyunli |East side,3m |2 residential building | |

| |Fengyunli |West side,3m |3 residential building | |

| |Guanli |East side,3m |4 residential building | |

| |JianguoAppart. |East side,7m |1 residential building |Minzulu(XinglongjieJinbudao)|

| |Tianjin State Tax Bureau |East side,7m |1 office building | |

| |Tianjin Commerce & Industry |West side,7m |1office building | |

| |Administration Bureau | | | |

| |Ruihaimingyuan |North side,18m |5 residential building |Jianguodao(Haihedonglu-Xiangw|

| | | | |eilu) |

| |Shananli |North side,25m |2 residential building | |

| |LiyuanAppart. |North side,7m |2 residential building | |

| |Hebei District Political Consultancy |North side,18m |1 office building | |

| |Conference | | | |

| |Buyunli |South side,12m |1 residential building | |

| |Zhianli |South side,5m |2residential building | |

| |Haihejinwan Appart. |South side,10m |1 residential building | |

| |Jianguo Appart. |South side,12m |2 residential building | |

| |Ligongci DongjiandaoLigongci |East side,7m |1residential building |Ligongci |

| |Dongjiandao No 2 Building | | |Dongjiandao(Ligongcidajie-Tia|

| | | | |nweilu) |

| |Tiangu Appart. |East side,5m |2residential building | |

| |Jintingli |South/North side,7m |2 residential building |Jintingdao(Xiangweilu-Jinweil|

| | | | |u) |

| |Qianyili |South/North side,7m |4 residential building | |

| |Jinchenyuan |North side,5m |2 residential building | |

| |Jinguli |South side,5m |2 residential building | |

| |Wanghai Appart. |North side,35m |4 residential building |Binhaidai(Xiangweilu-Shenglil|

| | | | |u) |

| |Tianjin Experiment Wanghai Prim. |North side,125m |1 classroom building | |

| |School | | | |

| |Ruihaimingyuan |South side,15m |3 residential building | |

| |Qinhai Appart. |South side,15m |3 residential building | |

| |Buyunli |North side,5m |1 residential building |Minzhudao(Haihedonglu-Wujingl|

| | | | |u) |

| |Hebei No 1KindergardenYiaoyuan |North side,5m |1 classroom building | |

| |Banyunli |North side,7m |1 residential building | |

| |Guanli |South side,5m |2 residential building | |

| |Tianjin Entry and Exit Administration|South side,5m |1 office building | |

| |Bureau | | | |

| |Tianjin Commerce & Industry |North side,5m |1 office building | |

| |Administration Bureau | | | |

| |Tianjin State Tax Bureau |North side,7m |1 office building | |

| |Guoyin Building |South side,5m |2 office building | |

| |Yingda Changan Insurance Group Ltd |North side,9m |1 office building |Ziyoudao(Minshenglu-Wujinglu |

| | | | |) |

| |Tianjin Fine Art College |South/North side,6m |2 Dormitory building |Diweilu(Simalu-Zhongshanlu) |

| |Yuankangli |North side,9m |1 residential building | |

| |Jinhuili |North side,3m |3 residential building |Jinhuilu(Zhongshanlu-Jinhaida|

| | | | |o) |

| |Jinhuijiayuan |North side,3m |4 residential building | |

| |Jinbiyuan |South side,3m |9 residential building | |

| |Qianhuayuan |North side,12m |2 residential building |Dongsanjinglu(Gangweilu-Xinda|

| | | | |lu) |

| |Hebei Administration Permission |North side,7m |1 office building | |

| |Service Center | | | |

| |Kongweilu No 1 Prim. School |North side,7m |1 classroom building | |

| |Tianjin No 57 Middle School |South side,7m |2 classroom building | |

| |Kunpuli |South side,7m |2 residential building | |

| |Yuanyang Building |East side,10m |1 office building |Minshenglu(Jianguodao-Haihedo|

| | | | |nglu) |

| |Minsheng Building |East side,7m |1 office building | |

| |Guoyin Building |East side,7m |1 office building | |

| |Milan Appart. |West side,6m |1 residential building | |

| |Yingfeng Appart. |West side,3m |2 residential building | |

| |Junlin Building |West side,7m |1 office building | |

| | | | |Minzulu(Boaidao-Haihedonglu)|

| |Junminli |West side,3m |4 residential building |Simalu(Tianweilu-Suweilu) |

| |Tuanjieli |East side,3m |5 residential building | |

| |Kangzhenli |West side,3m |4 residential building | |

| |Shengtianli |East side,3m |4 residential building | |

| |Hebei No 2 Kindergarden |West side,25m |1 classroom building | |

| |Yuxuanli |West side,3m |2 residential building | |

| |Tianjin Yaoyuan Occupation Training |West side,3m |1 classroom building | |

| |School | | | |

| |Sanjieli |East side,3m |2residential building | |

| |Rizhao Appart. |West side,3m |2residential building | |

| |Yihai Appart. |East side,3m |2 residential building | |

| |Riyuanli |West side,3m |3 residential building | |

| |Yongnianli |East side,3m |1 residential building | |

| |Simalu No 8 Yard |West side,3m |2 residential building | |

| |Tianjin No 57 Middle School |East side,3m |1 classroom building | |

| |Chengliangli |North side,3m |2 residential building | |

| |Chenrunli |South side,3m |2 residential building | |

| |Chengquli |North side,7m |3 residential building |Ermalu(Diweilu-Suweilu) |

| |Yuehaoli |North side,7m |1 residential building | |

| |Pingyunli |South side,7m |2 residential building | |

| |Yueyun Appart. |South side,7m |2 residential building | |

| |Hebei No 6 Kindergarden |West side,4m |1 classroom building | |

| |Yuejiaoli |West side,4m |2 residential building | |

| |Xinkai Prim. School |West side,40m |1 classroom building | |

| |Riyingli |West side,6m |1 residential building | |

| |Fuhai Appart. |East side,12m |2 residential building | |

| |Riguangli |East side,4m |2 residential building | |

| |Baoxingli |West side,5m |2 residential building | |

| |Erxianli |West side,5m |3 residential building | |

| |Ermeili |East side,3m |2 residential building | |

| |Tianjin No 1 No 1 Primary School for |East side,3m |1office building | |

| |Railway Worker’s Children Tianjin | | | |

| |Railway | | | |

| |Qiushli |West side,5m |2 residential building | |

| |Yuanjili |East side,5m |4 residential building | |

| |Hebei Central Prim. School |East side,5m |1 classroom building | |

| |Yuxuanli |North side,5m |1 residential building |Yuweilu(Wumalu-Zhongshanlu) |

| |Sanjieli |North side,5m |3residential building | |

| |Longfugong Home for the Aged |North side,5m |1 residential building | |

| |Kangzhenli |South side,5m |2 residential building | |

| |Shengtianli |South side,5m |3 residential building | |

| |Baoxingli |North side,3m |4 residential building | |

| |Tianjin No 1 Primary School for |North side,3m |1 classroom building | |

| |Railway Worker’s Children | | | |

| |Tatongli |North side,3m |1 residential building | |

| |Erxianli |South side,3m |5 residential building | |

| |Ermeili |South side,3m |1 residential building | |

| |Rizhaoli |North side,7m |3 residential building |Yuweilu(Wumalu-Zhongshanlu) |

| |Hebei Central Prim. School |North side,5m |1 classroom building | |

| |Yihai Appart. |North side,5m |4residential building | |

| |Tianjin Yaoyuan Occupation Training |South side,5m |1 classroom building | |

| |School | | | |

| |Hebei District Geneal Union |South side,5m |1 office building | |

| |Hebei District Greening Committee |South side,5m |1 office building | |

| |Office | | | |

| |Hongshunli Community Sanitation |South side,5m |1 office building | |

| |Service Center | | | |

| |Hebei Woman & Children Health Care |South side,5m |1 Clinic Building | |

| |Hospital | | | |

| |Riyingli |North side,5m |4 residential building | |

| |Riguangli |North side,5m |2 residential building | |

| |Baoxingli |South side,5m |5 residential building | |

| |Daren Hospital |South side,5m |1 Clinic Building | |

| |Yueguili |North side,12m |5 residential building |Yueweilu(Bamalu-Zhongshanlu)|

| |Rishengli |South side,7m |2 residential building | |

| |Yuejieli |North side,5m |1 residential building | |

| |Riyuanli |South side,5m |1 residential building | |

| |Tianjin No 57 Middle School |North side,2m |1 Offic Building | |

| |Tianjin No 2 Middle School |South side,7m |1 office building | |

| |Chenyue Building |North side,5m |1 residential building | |

| |Yuehaoli |North side,5m |2 residential building | |

| |Yueyun Appart. |North side,7m |3 residential building | |

| |Yuyang Appart. |North side,7m |1 residential building | |

| |Yueqiuli |South side,5m |2 residential building | |

| |Hebei No 6 Kindergarden |South side,5m |1 classroom building | |

| |Yuejiaoli |South side,5m |1 residential building | |

| |Xinkai Prim. School |South side,5m |1classroom building | |

| |Tianjin Nuode Center |South/North side,12m|6 residential building |Suweilu(Bamalu-Zhongshanlu) |

| |Chenliangli |South side,3m |2 residential building | |

| |Industry Co. Ltd of Tianjin No 3 |North side,3m |4 Dormitory | |

| |Railway Design Institute, | | | |

| |Hongkangli |North side,3m |2 residential building | |

| |Tianjin No 3 Railway Design Institute|South side,3m |1 Clinic Building | |

| |Hospital | | | |

| |Chenrongli |South side,3m |1 residential building | |

| |Economy & Tch. Develop. General Co. |North side,3m |1 office building | |

| |of Tianjin Branch Railway Bureau | | | |

| |Hebei Boda Hospital |North side,7m |1 Clinic Building | |

| |Tianjin Railway Transport |North side,20m |1 office building | |

| |Procuratorate | | | |

| |Chenquli |South side,5m |1 residential building | |

| |Pingyunli |South side,5m |1 residential building | |

| |Jinxiuyuan |South side,5m |1 residential building | |

| |Jinbiyuan |North side,5m |5 residential building | |

| | | | |Dongheyandajie(Jinzhongnanlu-|

| | | | |Jintingdao) |

| |Jinmingli |South side,5m |2 residential building | |

| |Muzhai Middle School |South side,15m |1 classroom building | |

| |Jinchenyuan |North side,3m |6 residential building | |

| |Jinmengyuab |South side,3m |1 residential building | |

| |Qianyili |South side,3m |2 residential building | |

| |Yuehai Buildig |East side,12m |1 residential building |Shouanjie(Jianguodao-Jinbudao|

| | | | |) |

| |Banyunli |East side,7m |2 residential building | |

| |Tianjin Entry and Exit Administration|East side,5m |1 office building | |

| |Bureau | | | |

| |Hebei District People’s Congress |East side,5m |1 office building | |

| |Standing Committee | | | |

| |Guanli |West side,3m |4 residential building | |

3 Protection Objective of Cultural Relics

For cultural relics protection objectives, see Table. 1.5-2.

For protection objective of cultural relics statistics, see Table. 1.5-3

Table 1.5-3 Statistic Results of Environment Sensitive Targets

|Serial |Type of Sensitive Objective |Quantity (units) |Scale Estimation |

|No. | | | |

|1 |Residence |480 |19,000 households and 57,000 people |

|2 |Hospital |10 |800 beds in total |

|3 |School |20 |About 19,000 students |

|4 |Kindergarten |7 |700 children |

|5 |Cultural relics |28 |- |

|Total |- |545 |76,700 |

As shown in table 1.5-3, the project involve 545 various sensitive objectives in all districts of Tianjin, including 480 residence sensitive points, 10 hospitals, 20 various schools and 7 kindergartens. There are a total of about 76,700 persons in the sensitive objectives.

Table 1.5-2 Cultural Relics Protection Objectives

|Serial No. |Name of Protected Cultural Relics |Corresponding Project |

|Project |Project Leading Group Coordination Office in |Direct,supervise,coordinate and generally organize Project |

|Preparation |TDRC (PCO) | |

|Stage | | |

| |Project Management Office (PMO) of Tianjin |Responsible for the implementation of EMP and organizing the design |

| |Construction Commission |unit to integrate the environment mitigation measures into technical |

| | |specifications when the bidding documents are prepared. |

| | | |

|Construction |PMO |1. Guide, supervise and coordinate various work in the implementation |

|Period | |period; |

| | |2. Regularly submit the progress report on EMP implementation |

| | |(semi-annual report and annual report) to the World Bank. |

| |Contractor (CET) |1. Be responsible for implementation of EMP and other environment |

| | |protection measures; |

| | |2. Be responsible for organizing the construction personnel to |

| | |participate in environment protection training. |

| |Construction Supervisor (CSE) |1.Carry out daily supervision to ensure the implementation of |

| | |environment protection measures; |

| | |2. Organize environment training of implementation staff |

| |Independent EMP (EMC) |1, Training of Owners, Constructors and other concerned units; |

| | |2, Regular site inspection; sampling inspection of water, air, noise |

| | |pollutant to check the realness of Supervisor daily environment record|

| | |and the validity of the mitigation measures in EAR |

| |District EPBs involved |Check the environment management during the construction period. |

|Operation |Project Management Office, Owner Unit |Same as construction period. |

|Period | | |

| |Environment protection bureaus in all |Check the environment management situations during the operation |

| |districts of Tianjin |period. |

| |Qualified supervision unit |Monitoring for the operation period and accident monitoring. |

| |Tianjin Planning Bureau |Control the construction of sensible targets for development along |

| | |newly built roads. |

1 2.1 Environment Protection Bureau (EPB)

As supervision department, bureaus at all levels shall formulate environment laws, regulations and policies for construction and operation of project, and be responsible for forcible implementation of laws, regulations, standards, guidelines and relevant environment policies within the scope of authority.

National Environment Protection Bureau is the highest functional department of environment protection in China,and shall guide Tianjin Environment Protection Bureau for forcible implementation of relevant laws and regulations; Tianjin Environment Protection Bureau shall review and approve the environment impact assessment report and guide environment bureaus at all districts for general environment management of the project; and the environment protection bureaus of all districts shall be directly responsible for supervision and forcible implementation of environment laws, regulations and standards.

As a provincial environment supervision and administration agency, Tianjin Environment Protection Bureau has the following roles and responsibilities:

Supervise the implementation of environment management plan;

Forcibly implement applicable laws, regulations and standards;

Coordinate matters related to environment protection among relevant departments;

Check and supervise the construction, completion and operation of environment facilities;

Guide the environment bureaus at municipal and county levels to manage the environment.

Environment protection bureaus at all districts shall have the following roles and responsibilities:

Supervise the construction unit to implement the environment management plan, and forcibly implement the applicable laws, regulations and standards;

Coordinate matters related to environment protection among relevant departments;

3) Check and supervise the construction, completion and operation of environment facilities within the scope of authority.

2 2.2 Owner Party (Project Management Office)

The Tianjin Municipal people's Government set up a project leading group headed by the deputy mayor in charge of overall project decision-making and comprehensive coordination. A Project Coordination Office (PCO), under the leading group, in the Tianjin Development and Reform Commission, is responsible for the specific coordination of relevant departments in Tianjin, as well as for communication and coordination with the relevant departments of the World Bank during the preparation and implementation of the project.

PMO of Tianjin Construction Commission (hereinafter to as PMO), a daily management organization of Tianjin Municipal Government leading Group, shall take final responsibility for the environment condition during construction and operation period. The PMO will be fully responsible for the World Bank safeguard policy related to the preparation and implementation of the Tianjin urban transport project, including, but not limited to, the following five areas:

I. In the project preparation stage, to prepare project environment regisrtation form, including supporting and supervising the project entities to complete Environment Management Plan to meet relevant domestic laws, regulations, standards and technical guidelines and requirements of safeguard policies of the World Bank and obtain the approval of local competent department for administration of environment protection and review by the World Bank.

II. Ensure the interaction of environment impact assessment consultancy unit and project research and design consultancy unit to combine with mitigation measures and other environment aspects to integrate the procedure and requirements into integration of project design and include the cost of environment protection measures into the total engineering investment.

III. The final supervisor for environment mitigation measures and other environment protection measures during the construction period shall integrate the environment requirements into the construction contract, organizing the training on contractors, construction supervisors and local project office, implementing other environment management procedure and organizing regular inspection on the construction site.

IV. Implement and supervise the environment supervision procedure, review the supervision journal of construction supervision company (CSE) as well as external monitoring report of external monitoring company (EMC) of environment management plan, check the environment performance of contractors, and adopt necessary rectification actions to respond to the problems and suggestions found in the external monitoring report, including any urgent situations and accidents in the construction period.

V. In project preparation and implementation stages, carry out public consultancy to local public, relevant agencies, World Bank and other shareholders to ensure them to fully understand the existing potential environment problems and mitigation measures in the project process and listen and respond to their problems and suggestions on environment protection.

3 2.3 Contractors (CET)

During the construction stage, the contractor is the one of key points for environment management, pollution control and impact mitigation. The contractors shall adopt a series of measures to ensure and be aware of the responsibilities and obligations for environment protection. The obligations of the contractor and special environment management personnel shall include but not be limited to:

The mitigation measures and requirements listed in the EMP shall be included into the bidding documents for civil work and shall serve as the annex for construction contract. The contractor must strictly implement the measures specified in the report of Environment Management Plan;

The contractor must initiatively take the environment responsibilities and provide the environment performance journals once per day or once per week. These records shall be submitted to the construction supervisor and reviewed by the project office and construction supervisor, and shall be subject to self-inspection and rectification;

Compliance with relevant environmental legal requirements ;

Work in the scope of contract and other tender conditions;

Each contractor shall arrange one special person to be responsible for implementation of environment protection measures and work jointly with External Monitoring Company (EMC) of environment management plan appointed by the owners for implementation of mitigation measures, site inspection and correction measures requested by any owners and/or EMC of owners.

After receiving the instruction on environment management plan from owners or External Monitoring Company (EMC) , stop the construction activities producing unfavorable impacts; if necessary, adopt other construction methods to minimize the environment impacts;

The contractor is requirsted the sufficient public participation in the community around the site, and set billboard for introuduction of the major construction activities and construction period in the special site. Meanwhile, the billboard shall provide the name of contract, contact person and telephone number for the pubic to facilitate them to express their cares and complaints on the construction activity;

Before the start of the construction, all contractors must participate in the environment training., mainly including the contents in the following 8 aspects:

1) National and local laws, regulations and standards;

2) Environment impact assessment reports;

3) Environment mitigation measures;

4) Cultural, assessment and protection provisions;

5) Emergency measures;

6) Environment monitoring methods and requirements as well as report procedure specified in the contract;

7) Long-time public consultancy and response;

8) Environment protection obligations of the contractor.

4 2.4 Construction Supervision Engineer (CSE)

The construction supervision engineer (CSE) shall be responsible for the supervision on the construction activities and contractor’s diligence of the envirenmtnt protection ,in order to ensure in compliant with the relevant environment laws, regulations, technical guidelines, standards, specifications and contract requirements. The supervision engineers shall take the following responsibilities:

Review the construction organization plan to ensure that is in compliant with the project design and environment protect and mitigation measures in《Envirenment Management Plan》.The construction activities shall not be carried out before the supervision engineer approve the environment measures;

Provide necessary assistance in the project management and supervision for owners and EMC appointed by the owners;

Regularly check the environment management of contractor in site. If the supervision engineer believes that the environment management personnel of the contractor fail to observe the responsibilities or contractual requirements, they shall instruct the contractor to change the environment management personnel;

Require the contractor to adopt rectification measures within the specified time. In case of breach of contract and the strong public complaints, the supervision engineer shall instruct the contractor to correct, change or stop work, and report to relevant agencies and owners at same time;

Supervise the activities of the contractor and ensure to fully meet the requirements of environment management plan and the mitigation measures specified in the contract;

Instruct the contractor to take actions to reduce the impacts and prevent from the occurrence of breach of contract in accordance with the approved requirements of 《Environment Management Plan》;

Once any environment problems occur, the contractor shall solve the environment problems in the current month and shall be paid after the approval of the supervision engineer;

If the contractor finds any cultural relics in the construction site, the supervision engineer shall order them to protect the site and inform relevant units and owners;

Adhere to follow the procedure for complaint investigation.

5 5 Independent Environmental Monitoring Consultant (EMC)

(EMC), an external monitoring consultant for the environmental management plan, is responsible for supervising whether the contractor is in full compliance with the requirements of the Environmental Management Plan on behalf of the owner, and will report directly to the owner and be responsible to the owner. Owners will hire qualified consulting units through competitive procurement procedures to carry out external monitoring of the environmental management plan. Hired emc should have at least 5 years experience in similar projects, similar consulting services, familiar with relevant environmental laws, regulations, technical standards, specifications and guidelines. The consultants are familiar with the work through the review of the reports, including the World Bank approved Environmental Management Plan, environmental issues and protection needs in the construction of the project. The main responsibilities of (emc), an external monitoring consultant for the environmental management plan, are as follows:

a) To be appointed by the Owner to review whether the design of the construction organization is in accordance with the requirements of the 《Environmental Impact Registration Form》 and the 《Environmental Management Plan》 , which has been documented , and in particular on the requirements of the on - site environmental management and mitigation ;

b) To monitor and inspect the contractor's environmental management system on-site and the environmental performance, experience and ability of the construction supervision engineer to deal with environmental problems on the site and, if necessary, EMC has the right to recommend the owner the replacement of the contractor and the supervisor specially in charge of environment management

c) Regular inspections of the implementation of the 《Environmental Management Plan》 by contractors and construction supervision units;

d) In the event of an environmental emergency, EMC should be involved in coordination and handling; activities.

e) To monitor the environmental behaviour of the contractor and, if any breach of the contract or the requirements of the 《Environmental Management Plan》is found to be necessary, to order a temporary cessation of work and to provide recommendations for corrective measures or penalties to the owner;

f) Submit semi-annual and annual consultation report to the owner on time;

g) Participation in environmental inspections by the World Bank project team or other relevant departments at the request of the owner;

h) Conduct an investigation at the request of the owner and provide an independent investigation report to the owner; in the event of an environmental pollution accident during the contract period,

i) Assist owners and construction supervisors to investigate and evaluate environmental complaints at Owner request.

Chapter III Project Environment Impacts

The proposed project will produce sewage, noise and solid wastes in the implementation process, which may cause certain impacts on the surrounding environment. In this chapter, we will analyze the possible environment problems and their impacts of the proposed project in the construction period and operation period from such eight aspects as ecological environment, water environment, sound environment, environment air, solid wastes, accident risk, accumulated impacts and social impacts.

1 3.1 Ecological Environment

(1) The road construction in the project may increase certain amount of permanent land use and remove the green isolation belts, border trees, lawns, shrubs and others along the roads in the implementation process. Thus, in the construction process, the green area in the ecological system will be reduced, the total plant coverage rate will be reduced and adjustment function of the ecological system will be certainly reduced. However, the affected plants are common species in the scope of assessment, and have wide growth scope and high adaptability. They will not lead disappeared or extincted plant species in the area. After the completion of construction, the road landscape will compensate partial ecological losses.

(2) After the completion of the project, the overall land use of Tianjin will be increased. Despite the benefits to the urban transport, the increase of concrete and asphalt coverage will certainly intensify the urban heat island effects. Especially in the early completion of the land, the landscape function has not appeared, and the heat island effects are most obvious.

(3) Construction soil, spoil and piled construction debris will bring some impacts on the ecological environment, and are mainly expressed that extraction and discharge of soil may disturb the original flora and fauna habitats and destroy the vegetation; the extraction of soil may cause low-lying earth,, change the original drainage system and form a local hydrops; and the extraction of soil may damage the soil structure, drop the fertility and decline the soil productivity.

(4) In the excavation and placement of road base,, the ground cover vegetation is damaged, the original soil structure is destroyed, and slopes are formed. Under function ground runoff of rain water, surface runoff may be formed due to the height difference between the road base and bilateral sides, soil particles may be taken away, and soil erosion is formed. In the construction process, water and soil losses cannot be avoided in case of rainstorm. As it is predicted, the water and soil loss amount in the project is 2,358 t, in which the water and soil loss amount in the construction period (including construction preparation period) is 1,561 t, the water and soil loss amount in the natural recovery period is 797 t, and the water and soil loss amount newly increased is 1,579 t.

(5) The construction process may inevitably affect the various ground and underground lines and pipes in the urban municipal project, such as water supply and drainage pipelines, gas pipes, heat pipes and communication power line. Some pipelines are also required to be relocated and transferred, which may damage the urban roads and affect the urban landscape. In the construction process, foundation excavation, earthwork, and piling of building materials, especially the temporary piling of construction wastes and building garbage will also affect the urban health environment and urban landscape.

(6) The construction project area involves the street green belts and the trees on every road locating in the red line of the road. To promote and upgrade the sponge greening space in urban area will add new scenery and modern atmosphere along the road at same time.

2 3.2 Water Environment

1 3.2.1 Construction Period

The main sources of sewage during the construction period are living sewage of construction personnel and construction waste.

The living conditions of construction personnel are simple, and living sewage is less. The living sewage is mainly from sewage from daily life and fecal water. The sewage mainly contains various organic matters such as animal fats and plant oil, food residue and detergents. If they are directly discharged without treatment, adverse impacts may be caused for the surrounding water quality. After the construction, the impacts of living sewage will disappear.

The machinery waste water from construction is mainly the waste water from cleaning and maintenance of machines and vehicles. Vehicle cleaning water may be generated when the machines and transport vehicles are maintained in the site. The vehicle cleaning water contains high amount of sediments. According to the investigation on construction waste water in similar project, the vehicle cleaning water of construction machines and vehicles contains 50~80mg/L of COD, 1.0~2.0mg/L of oil and 150~200mg/L of SS. The construction waste water will pollute the water along the roads if they are directly discharged. It is prohibited from directly discharge into rivers and water body along the roads. The construction waste water shall be recycled after the precipitation by oil separation.

2 3.2.2 Operation Period

This project has no life and construction wastewater produced during the operation period.

3 3.3 Sound Environment

1 3.3.1 Construction Period

In the stone and earthwork stage of operation of the single machine, the noise value at 60 m away from the construction machine in day time can meet the standard of 70dB(A) in accordance with 《Standard for environmental noise emission from construction site boundary》, and the noise value at 300 m away from the construction machine in night can meet the standard of 55dB(A); in the structural stage, the noise value at 40 away from the construction machine in night time can meet the standard of 70dB(A) in accordance with 《Standard for environmental noise emission from construction site boundary》 and the noise value at 200 m away from the construction machine in night time can meet the standard of 55dB(A).

The main affected objects of the project include residential areas, schools, hospitals, kindergartens and so on. The above sensitive points are distributed in the range of 5--200 m around the site. Therefore, the noise of construction machinery during the construction period will have a different degree of impact on it. Diurnal construction exceeding the standard about 3.0~14.0 dB(A), night construction exceeding the standard 2.0~24.0 dB(A).

2 3.3.2 Operation Period

: (1) The prediction result of traffic noise environmental impact.

According to the engineering design data, 10 roads:Wumalu, Huangweilu, Shhizilindajie, Jinbulu, Wujinglu , Boaidao, Jinhaidao, Pinganjie, Diweilu and Jintingdao, have already represented the different road grades, cross-section forms and traffic flow of 46 roads involved in this EIA. Therefore, the effect of traffic noise on the sound environmental quality along the route during the operation period of other roads can be referred to the above calculation results.

a, The two sides of the different grade roads involved in this project are significantly affected by traffic noise. The results of horizontal section prediction show that the larger the predicted value of traffic flow during the operation period, the higher the noise impact value, and the farther away from the road, the lower the impact of traffic noise.

b.The diurnal noise at the red line of Wumalu (20m from the central line of the road) is 66.61dB (A), and 62.74dB from the central line of the road respectively. The predicted result shows that the 200m distance between the red line and the central line of the road is reduced to 48.44db / 44.57dB (A);. The noise value of Wumalu is less than 60dB (A) at 37m away from the center line at day time, at night at 82m away from the center line and less than 50dB (A).

c, The day and night noise values at the red line of Huangweilu (25m of the center line) are 63.79,59.06dB (A) and 48.20,43.48dB (A) at the distance of 200m from the center line at the center line of the road, and the prediction results show that the noise value of the Huangweilu is lower than 60dB (A) outside the center line 63m in day time, and the noise value is lower than 50dB .at 78m away from the center line at night.

d. The diurnal noise at the red line of Shizilindajie (20m from the central line of the road) is 66.98, and 63.65db(A), respectively. The predicted results show that the diurnal noise value is reduced to 50.41, 47.08db (A); at the distance of 200m from the central line of the road. The noise-level of Shizilindajie is lower than that of 60db (A),43m away to the center line; 127m away from the center line, lower than that of 50db (A). at night

e. the diurnal noise at the red line of Jinbudao (11.5m from the central line of the road) is 65.11 ~ 59.96db (A), from the center line of the road, and the attenuation is 45.80, 40.64db (A) at the distance of 200m;. The prediction results show that, The noise-level of the Jinbudao is lower than that of 60db (A), at night when the noise is 65 m away from the center line, and the noise value is lower than that of 50db (A). at 133m away from the center line.

f. The diurnal noise at the red line of Wujinglu (16m from the central line of the road) is 67.16, 62.36db (A), from the center line of the road, and the predicted result shows that at the distance of 200m between the red line of Wujinglu and the central line of the road is 49.46, 44.66db (A);. The noise-level of Wujinglu is lower than that of 60db (A), at 37m away from the centerline at day time and at night, 82m away from the centerline is lower than that of 50db (A).

g. The diurnal noise values at the red line of Boaidao (12.5m from the central line of the road) are 63.27, 58.49db (A), from the central line of the road, and the predicted results show that at the distance of 200m between the red line and the central line of the road will be reduced to 44.47, 39.69db (A);. The noise-level of Boaidao is lower than that of 60db (A), at daytime, 21 m away from the center line, and lower than that of 50db (A). at night, 37 m away from the center line.

h. the diurnal noise at the red line of Jinhaidao (10 m from the central line of the road) is 62.54, 60db (A), from the center line of the road, and the predicted result shows that at the distance of 200m between the red line of Jinhaidao and the center line of the road is reduced to 42.33,39.78db (A);. The noise-level of Jinhaidao is lower than that of 60db (A), at day time, 15 m away from the center line, and lower than that of 50db (A). at night, 38m away from the center line.

i. The diurnal noise at the red line of Pinganjie (11m from the central line of the road) is 61.75 , 57.85db(A) from the center line of the road, and the attenuation is 41.98, 38.08db (A) at the distance of 200m between the red line of Pinganjie and the center line of the road. .The noise-level of Pinganjie is lower than that of 60db (A), at day time, when it is 15 m away from the center line and 30 m away from the center line is lower than that of 50db (A). a night.

j. The diurnal noise at the red line of the Diweilu (4.5 m from the central line of the road) is 54.04, 52.93db (A), from the center line of the road, and then attenuates to 33.99-32.87db (A);. The noise-level of Diweilu at the red line is lower than that of 60db (A),at day time and at night, 14 m away from the center line is lower than that of 50db (A).

k、The diurnal and night noise values at the red line of Jintingdao (8 m from the central line of the road) are 56.48b, 51.43db (A),and at 200m from the central line of the road, the values reduced to35.28、30.23db(A) respectively. The predicted results show that the distance of reaching the standard of (A); is 35.28, 30.23db. The noise-level of Jintingdao at the red line of the road is lower than 60db (A) at day time, and lower than 50db (A)., 11m away from the centerline at night.

l. the prediction results of vertical section show that the traffic noise effect on the buildings at 10 m away from the red line of different grades of roads is "gradually increasing-showing the trend of maximum value-gradual decline" with the increase of height. At 10 m away from the red line of Wumalu, Huangweilu, Shizilindajie, Jinbudao, Wujinglu, Boailu, Wujinglu, Boaidao, Jinhailu, Pinganjie, Diweilu and Jintingdao, the maximum noise values in day time and at night are respectively 64.89,61.03db(A),63.26,58.54db(A),67.38,64.05db(A),64.87,59.72db(A),67.42,62.62db(A),63.35,58.57db(A),62.15,59.60db(A),61.64,57.74db(A),53.84,52.72db(A),56.08,51.03db(A). The maximum value appears near the height of 2 ~ 3 layers.

The above calculation results are obtained under the ideal conditions of open space on both sides of the line and no building occlusion. In fact, the development and construction of the adjacent roads in the central urban area will be emphasized. In areas with multiple rows of buildings built along the road, the impact of traffic noise on the first row of buildings along the road is relatively higher than that the row of building standing behind. .

4 3.4 Environment Air

1 3.4.1 Construction Period

(1) In the construction process, the construction site may cause TSP pollution under the effects of wind. According to the actual investigation materials on similar projects that have been built, the wind dust for buildings without shields are very serious, and the pollution scope can reach 250 m from the site in the downwind direction. The TSP concentration of affected area is averagely 0.756mg/m3 and is 1.87 times to the comparative point and 2.52 times the quality standard of atmosphere environment. If the shields are provided, the wind dust is significantly improved compared to the situations without shields. The scope of dust pollution is within 200 m away from the site in the downwind direction, and TSP concentration of affected area is reduced by 1/4. The TSP concentration of affected area is averagely 0.585mg/m3 and is 1.4 times of the comparative point and 1.95 times of the quality standard of atmosphere environment. As it is confirmed that the distance between the environment protection objective and construction site is less than 100 m, the area is affected by construction dust; the areas with relatively great impacts are pedestrians in the construction section and environment protection objectives such as residential buildings within 50 m to the site.

(2) According to the information of urban roads building in Tianjin or in other cities, asphalt fume does not have significant impacts basically on the residential area 50 m away from the construction site if commercial asphalts are used to pave the road surface. Moreover, we currently apply fast-curing modified asphalt. Open-air operation can also timely diffuse a small amount of asphalt. Thus, as long as we rationally adjust the proportion in the project to shorten the time of asphalt transport vehicles to wait in the site, the asphalt fume will not cause significant impacts on the environment protection objectives.

2 3.4.2 Operation Period

The automobile exhaust is mainly the influence of environment impact during operation period

a. For branch road with cross section of 20 m, NO2 concentration in the areas 15 m away from center line of bilateral roads in the heating and non-heating season meets the daily concentration requirements according to GB3095-1996 《Environment Air Quality Standards 》(Second Class), and the NO2 concentration in the areas 200 m away from center line under most unfavorable conditions meets the primery concentration requirements according to 《Environment Air Quality Standards》 (Second Class).

b. For sub-branch road with cross section of 20 m, the NO2 concentration in the areas 15 m away from bilateral roads in the heating period and non-heating season meets the daily average concentration requirements according to GB3095-1996《 Environment Air Quality Standards》 (Second Class), and the NO2 concentration in the areas within 30 m meets the requirements; and the prediction points within 200 m under most unfavorable conditions exceed the standard value.

c. For sub-branch road with section surface of 25 m, the NO2 concentration in the areas 50 m away from bilateral roads in the heating period and non-heating period meets the daily average concentration requirements according to GB3095-1996 《 Environment Air Quality Standards》(Second Class), and the NO2 concentration in the areas within 80 m meets the requirements; and the prediction points within 200 m under most unfavorable conditions exceed the standard value.

d. For main trunk with section surface of 40 m, the NO2 concentration in the areas 150 m away from bilateral roads in the heating period exceeds the standard, and the NO2 concentration in the prediction points 200 m away from roads in non-heating period and unfavorable conditions also exceeds the standard.

e. For main trunk with section surface of 90 m, the NO2 concentration in the areas within200 m away from bilateral roads in the heating period, non-heating period and unfavorable conditions also exceeds the standard.

f. With the increase of width of section surface, the scope of exceeding the standard for NO2 concentration is gradually increased, mainly due to the increase of section width and increase of traffic flow.

5 3.5 Solid Wastes

The solid waste during the construction period is mainly earth-rock excavation, construction waste produced by house demolition, and domestic waste produced by construction personnel.

According to the preliminary estimate of the design data, the earth-rock cutting of the construction site is allocated and utilized as far as possible for the project. The excavating is 128700 m3, the filling is 147800 m3, and the abandoned soil is 100000 m3. The abandoned soil is moved out by the transportation unit which is selected by the construction unit and approved by the government. The abandoned soil will transport to the site of other project following in the residue management department. Due to the linear distribution of some solid wastes scattering along the road during the construction period, the vegetation along the road will be destroyed and the water body will be polluted if the stacking is improper or the disposal is not timely. The dust will also have an impact on nearby residents after the dust has been covered for too long. Therefore, during road construction, such effects should be reduced and prevented by strengthening construction management, clearing and handling in time.

During the peak period of construction, there are about 200 construction workers and 0.1 t of daily garbage. The garbage produced by the construction workers, such as food residue, plastic packaging, waste batteries and so on, will affect the landscape and cause great pollution to the environment at the same time. Unorganized waste can cause stench, attract a lot of mosquitoes, fly and mice, pose a threat to the health of the workers. Meanwhile, unprotected garbage will produce sewage, resulting in water, soil pollution. Especially waste batteries contain a large number of heavy metals, the pollution of which to water and soil is very serious.

The domestic waste generated by the construction personnel shall be collected and handed over to the sanitation unite for gathering disposal the construction waste gathered shall be transported to the waste landfill by the municipal residual soil management department of Tianjin in a unified and timely manner. .After the above measures are expected to be taken, the solid waste produced during the construction has little impact on the surrounding environment.

6 3.6 Accident Risks

The project belongs to large municipal projects. Due to the factors such as construction methods, organizational management, personnel composition, construction environment and work time, there are various inevitable risks of accidents in the construction. Activities that may cause major influences on the environment include: destruction of water supply and drainage pipelines and gas pipelines, combustion and exposition of such flammable and explosive products as diesel fuel and gasoline. caused by construction.

Environment Risk of Destruction of Water Supply and Drainage PipelinesThe reason of the risks are mostly failure to understand the paving the existing underground pipelines in the construction area or improper use of construction machines. The outcomes mainly include that: sewage and tap water flow to roads to cause water accumulation on roads and even cause soil and water losses and accumulation in the drainage pipelines. These accidents can be removed by closing valves or repairing the leakages, and will basically not cause substantial impacts on human health and environment quality.

(2) Environment Risk of Destruction of Gas Pipelines.

Once gas pipelines are destroyed, the direct environment impact is the leakage from gas or natural gas, affecting the atmosphere quality nearby. More serious impacts of these accidents are risks of explosion of leaked gas.The sharp increase of gas or natural gas in the air may cause suffocation.of people. After such accidents occur, it takes a period of time to reduce the pollutant concentration in the air to the original level.

(3) Environment Risks of Combustion and Explosion of Diesel and Gasoline

If the construction is not well managed, accidental combustion and explosion of stored diesel and gasoline may occur in the construction site. The direct impacts are CO and NOX pollution on the environment air generated by diesel and gas combustion. and these accidents generally influence the work site and basically do not cause great impacts on the sensible objectives out side the work site. Currently, as relevant departments vigorously advocates civilized construction and enhance site management, the probability of such accidents is very low. Moreover,it is not allowed to keep a large amount of flammable and explodeable products in the urban construction area, so that the probability of such accidents is not high.

There are likely various accidents in the construction period. Most accidents mainly cause personal injury and property damage, and only few accidents have direct and obvious impacts on the environment. From analysis of the causes of accidents, most accidents are caused by mismanagement and operational errors, and some cases are caused by unclear pipeline routes and depth. Thus, most accidents can be avoided if we enhance construction management, intensify the responsibility awareness and make detailed investigation before construction. In recent years, there are basically no great environment accidents in Tianjin during the municipal engineering construction.

7 3.7 Analysis on Social Environment Impacts

The construction vibration of machines gets smaller as the distance increases. At site 30 m away from the vibration source, Z vibration level is less than 72 dB, which meets the vibration standards for 72 dB at “mix zone” at night time according to 《Urban Regional Environment Vibration Standard.》 However, the area 10~20 m away from the vibration source will be affected. In particular, the construction during night may cause obvious impacts on the surrounding sensible points. Thus, we must enhance control and management on the high vibration construction machines and equipment.

According to the road relations between the project and cultural relics unit, the project undergoes many cultural protection units which are mostly distributed in the city center. After the confirmation of relevant cultural relics departments, there are 28 cultural protection units and relics buildings, in which 3 national key cultural protection units, 25 Tianjin cultural relics protection units.. After the site surveying, it’s confirmed that project will not occupy the protection scope of cultural relics, which are located outside the red line. Thus, the construction will not cause direct occupation and destruction.

In accordance with relevant provisions of 《Law on Cultural Relics Protection of the People’s Republic of China》, 《Implementation Regulation of Cultural Relics Protection Law of the People’s Republic of China》and 《Regulation on Cultural Relics Protection of Tianjin》, to maximally reduce the impacts on the cultural relics, the construction unit plans to adopt the following measures to enhance the protection on the cultural relics. Before the construction, they shall survey the cultural relics in the scope of construction site and immediately stop work to protect the site if any cultural relics are found to prevent any personnel from moving or damaging them. They shall immediately report to the administration department of cultural relics for protection.

Chapter IV Mitigation Measures of Environment Impact

We shall adopt measures to enhance the favorable impacts and reduce unfavorable impacts for the potential impacts of the project. The mitigation measures referred in the section mainly target at the unfavorable impacts generated in the project design and implementation process. The contractor shall formulate detailed and specific implementation plans for environment measures of all sub- projects and construction sites. This requirement is also included into the bidding documents of the contractor. Refer to the major environment mitigation measures in the following table.

The contractor shall ensure that the required mitigation measures are fully implemented in the construction period. The external monitoring company (EMC) for environment management plan appointed by the owner shall supervise the performance of general environment protection and respective obligations and responsibilities of the contractor. and also report the to the project management office to adopt necessary actions.

The Table 4 The Measures of Environment Management Plan

|category |

|route selection |

|Environment |wind dust |1. Formulate and implement |contractor(design|112 |the cost |PMO, Tianjin|

|air |at site |dust pollution governance |unit”s | |included in |Transport |

| | |programs for the construction|responsibility to| |contract budget|Bureau, |

| | |site, and include the dust |incorporate it | | |Tianjin |

| | |control situations in the |into bidding | | |Environment |

| | |credit management system of |material) | | |Protection |

| | |the building enterprise as an| | | |Bureau |

| | |important evidence in bidding| | | | |

| | |material; all projects shall | | | | |

| | |be provided with sign labels | | | | |

| | |with name of construction | | | | |

| | |unit, name of project | | | | |

| | |manager, telephone number, | | | | |

| | |dates of start and planned | | | | |

| | |completion, approved document| | | | |

| | |No. of construction license | | | | |

| | |and others and labels with | | | | |

| | |environment protection | | | | |

| | |measures. | | | | |

| | | | | | | |

| | |2. In the construction site, | | | | |

| | |we shall strictly adopt the | | | | |

| | |engineering measures such as | | | | |

| | |close site, high fence and | | | | |

| | |spraying, harden road surface| | | | |

| | |in the sites, and other sites| | | | |

| | |shall been fully covered or | | | | |

| | |afforest. except the | | | | |

| | |operation site The soil | | | | |

| | |shall be collectively piles | | | | |

| | |by the methods of coverage or| | | | |

| | |curing. Construction | | | | |

| | |programs must be provided | | | | |

| | |with environment protection | | | | |

| | |measures for leakage and | | | | |

| | |spray pollution.and also | | | | |

| | |prepare operation standards | | | | |

| | |for dust prevention. | | | | |

| | | | | | | |

| | |3.. Set fences in the | | | | |

| | |construction site to separate| | | | |

| | |the site from the outside,The| | | | |

| | |fences shall conform with | | | | |

| | |relevant provisions in terms | | | | |

| | |of heights, materials, | | | | |

| | |entrances and exit setting, | | | | |

| | |width and others. Meanwhile, | | | | |

| | |simple forestation measures | | | | |

| | |will be adopted on the land | | | | |

| | |not to be developed | | | | |

| | |temporarily; | | | | |

| | |4. Set vehicle washing | | | | |

| | |facilities at the entrances | | | | |

| | |of the construction site and | | | | |

| | |avoid any impacts on the | | | | |

| | |local transport at area of | | | | |

| | |the entrances of site. | | | | |

| | |Arrange special persons to | | | | |

| | |wash the vehicle wheels and | | | | |

| | |vehicle sideboards and clean | | | | |

| | |the entrances to ensure that | | | | |

| | |the vehicles drive without | | | | |

| | |mud and vehicles shall also | | | | |

| | |be discharged in a civilized | | | | |

| | |manner during transportation.| | | | |

| | | | | | | |

| | | | | | | |

| | |5. Set the regulations of | | | | |

| | |water spray and cleaning road| | | | |

| | |in the project construction | | | | |

| | |site, and appoint special | | | | |

| | |person to be responsible for | | | | |

| | |spraying water and cleaning | | | | |

| | |at least twice (work start | | | | |

| | |and close ) every day. In | | | | |

| | |addition, load and unload of | | | | |

| | |scatter materials, transport | | | | |

| | |and other procedures may | | | | |

| | |generate great amount of | | | | |

| | |dust, and thus shall be | | | | |

| | |carried out under clear | | | | |

| | |weather. It is forbidon to | | | | |

| | |carry out operations that may| | | | |

| | |cause a great amount of dust | | | | |

| | |and in case of weather with | | | | |

| | |wind of fourth grade or | | | | |

| | |above. | | | | |

| | | | | | | |

| | |6. Keep the construction site| | | | |

| | |clean Often, timely clear and| | | | |

| | |transport the project spoil, | | | | |

| | |keep the pedestrian passages | | | | |

| | |clean, level and smooth; in | | | | |

| | |case of dry and dusty | | | | |

| | |earthwork operation, spray | | | | |

| | |water to control dust, and | | | | |

| | |shorten the operation time in| | | | |

| | |dust. | | | | |

| | |7. Keep the completeness | | | | |

| | |condition of carriages for | | | | |

| | |transporting spoil and | | | | |

| | |building material without | | | | |

| | |overload, maintain normal | | | | |

| | |vehicle speed and prevent | | | | |

| | |from scattering during the | | | | |

| | |transport process. All | | | | |

| | |transport materials must be | | | | |

| | |covered with tarpaulins. | | | | |

| | | | | | | |

| | |8. Rationally plan the routes| | | | |

| | |for construction transport | | | | |

| | |vehicles, and drive according| | | | |

| | |to the designated routes; | | | | |

| | |arrange special persons to be| | | | |

| | |responsible for clearing the | | | | |

| | |mud on the roads, and timely | | | | |

| | |clear them out; for road | | | | |

| | |sections with high | | | | |

| | |requirements on the | | | | |

| | |environment, select to | | | | |

| | |transport during night | | | | |

| | |according to the actual | | | | |

| | |conditions to reduce the | | | | |

| | |impacts of dust on the | | | | |

| | |environment; and select the | | | | |

| | |transport methods according | | | | |

| | |to the local conditions, | | | | |

| | |maximally adopt large-tonnage| | | | |

| | |dump trunk and mechanical | | | | |

| | |vehicles to reduce the | | | | |

| | |transition step, and forbid | | | | |

| | |to transport in overload. | | | | |

| | | | | | | |

| | |9. Regularly inspect the | | | | |

| | |construction dust and | | | | |

| | |exhausts of construction | | | | |

| | |machines and construction | | | | |

| | |transport vehicles; forbid to| | | | |

| | |use bad fuels, and enhance | | | | |

| | |the mechanical maintenance to| | | | |

| | |fully burn the fuel up and | | | | |

| | |reduce the exhaust emission | | | | |

| | | | | | | |

| | |pletely adopt | | | | |

| | |commercial asphalt concrete | | | | |

| | |in the project, and prohibit | | | | |

| | |to burn any wastes and | | | | |

| | |materials that may generate | | | | |

| | |harmful and toxic gases, | | | | |

| | |smoke and odor, and use | | | | |

| | |sealed device for loading | | | | |

| | |molten pitch and other toxic | | | | |

| | |materials; and if stuff | | | | |

| | |conteen are set in the site, | | | | |

| | |use clean energy, and forbid | | | | |

| | |to use coal ranges or apply | | | | |

| | |wood, asphalt felt and paint | | | | |

| | |as fuel. | | | | |

| | | | | | | |

| | |11. Forbid to pile cement and| | | | |

| | |lime in open air during the | | | | |

| | |construction process, and | | | | |

| | |reduce using lime, blending | | | | |

| | |lime or other operations that| | | | |

| | |may cause serious dust | | | | |

| | |pollution in site; strictly | | | | |

| | |forbid to apply the waste | | | | |

| | |building materials as fuel | | | | |

| | |energy, and timely recover | | | | |

| | |the roads and plants in the | | | | |

| | |occupied land after the | | | | |

| | |construction. | | | | |

| | |12.According to the relevant | | | | |

| | |requirements in 《Notice of | | | | |

| | |Tianjin People’s Government | | | | |

| | |on Forwarding The Management | | | | |

| | |Method of Tianjin for Control| | | | |

| | |of House Demolition Dust, | | | | |

| | |Drafted 》by Bureau of Land | | | | |

| | |and House Administration, | | | | |

| | |requist : to set shields for | | | | |

| | |house demolition according to| | | | |

| | |relevant municipal government| | | | |

| | |provisions, and forbid the | | | | |

| | |over flow of soil; when | | | | |

| | |dismantling houses and | | | | |

| | |cleaning soil, spray water to| | | | |

| | |control the dust and avoid | | | | |

| | |dust pollution; in | | | | |

| | |dismantling houses in the | | | | |

| | |construction site, | | | | |

| | |comprehensively control the | | | | |

| | |dust by setting high fences, | | | | |

| | |spraying and other methods, | | | | |

| | |timely clear the garbage from| | | | |

| | |demolition, set storage sites| | | | |

| | |for those that cannot be | | | | |

| | |cleared temporarily and adopt| | | | |

| | |dust control measures such as| | | | |

| | |cover and water spray; and in| | | | |

| | |case of wind fifth grade or | | | | |

| | |above (including fifth | | | | |

| | |grade), stop house | | | | |

| | |demolition. | | | | |

| | | | | | | |

| | |13.Enhance management, | | | | |

| | |implement management | | | | |

| | |accountability system, and | | | | |

| | |advocate construction in a | | | | |

| | |civilized manner. Must set | | | | |

| | |cost for construction in a | | | | |

| | |safe and civilized manner, | | | | |

| | |and ensure the special fund | | | | |

| | |to be used for designated | | | | |

| | |purpose. Refer to the | | | | |

| | |specific technical details | | | | |

| | |for dust control measures in | | | | |

| | |relevant requirements of | | | | |

| | |《Technical Standard for | | | | |

| | |Control of Urban Dust | | | | |

| | |Pollution》(HJ/T393-2007). | | | | |

| | | | | | | |

| | |14.Implement the emergency | | | | |

| | |proposal for heavy pollution | | | | |

| | |weather in Tianjin and | | | | |

| | |implement the work suspension| | | | |

| | |measures according to the | | | | |

| | |warning levels for heavy | | | | |

| | |pollution weather based on | | | | |

| | |the requirements of emergent | | | | |

| | |proposals. | | | | |

|Construction|Environmen|Temporary storage sites for |TSP、 PM10、PM2.5|Once/quarter | |EMC |

|Period |t air |solid waste and periphery of | |(Densify the monitor according to|3-4 times each | |

| | |environment protection | |the circumstances in the |time | |

| | |targets long the line | |construction peak) | | |

| |Noise |

|All |1) Environment training record (such as attendance record of environment consciousness |

| |training and discussion meeting); |

| |2) Site log and site inspection record; |

| |3) Environment work log book, complaint work log book and notification form for |

| |standard-exceeding of environment quality restriction; |

| |4) Construction procedure and progress plan; |

| |5) Equipment maintenance and repair record; |

| |6) Contact with interested parties and other parties of the environment problems; |

| |7) Minutes of the meeting. |

|Air |1) Emission plan at the construction site; |

| |2) Routing and scheme of building material transportation; |

| |3) Relieving measures relevant with air effect, such as watering; |

| |4) Monitoring result of air quality. |

|Noise control |1) Update the current electromechanical equipment list on sites ; |

| |2) If any environmental sensitive points are influenced, periodic inspection should be |

| |carried out and detailed materials of the inspection results should be provided. |

|Water pollution control |1) Drainage plan on the construction site; |

| |2) Record reuse of the collected waste inflated mud and quantity of the repaired and disposed|

| |drilling mud; |

| |3) Record maintenance and clearance of sediment and petroleum/grease; |

| |4)Record toilet sewage disposal (without connecting the existing sewage main pipe); |

| |5) Record of final discharge quality of waster water and pollutant concentration. |

|Management of solid wastes |1) Backup the relevant valid certificates of waste transport vehicles and waste collectors in|

| |the environment management plan; |

| |2) Record quantity of reused and regenerative wastes; |

| |3) Record the quantity of inert wastes transferred into site active substance (if any) |

|Ecological resource |Record locations of sensitive ecological resources and relevant protection plan. |

Chapter VII Staff Training

Smooth execution of various environment management activities in this “Environment Management Plan” depends on knowledge and experience of environment management staffs. The new methods of environment management in content of projects such as road construction, public transport and intelligent transport are new things for the local departments and organizations. Therefore, training needs to be carried out widely. The domestic and oversea training provides the plan for the interested parties of the project. Oversea training will be carried out in countries with abundant experience of road construction and operation management. Domestic training is guided by experts from universities, research institutions and professional consulting organizations.

Concluding experience of the following projects, it is necessary to improve the environment protection consciousness of construction unit and supervision unit. At the same time, the environment protection consciousness needs to be improved and the supervision over management authority should be enhanced. It is necessary to provide training courses to improve their environment protection consciousness.

Staff training includes environment laws and regulations, standards, responsibilities, management methods and etc. The detailed content of staff training is shown in the following table.

Table 7-1 The detailed contents of staff training

|Type |Contents |Staff |Training Content |Number of |Time |Date(Year) |Expense |

| | | | |Persons | | |(10 thousand |

| | | | | | | |Yuan) |

|Oversea |Environment |Relevant department |Advanced experience |6 |10 day |2018 |16 |

| |management |management staffs of|and best practice of | | | | |

| | |project coordination|environment management| | | | |

| | |office |in construction period| | | | |

| | |Project management |Environment management|20 |14 day |2019 |40 |

| | |office, professional|technologies and | | | | |

| | |staffs of |methods in | | | | |

| | |proprietors’ unit |construction period | | | | |

|Domestic |Environment |Environment staffs |Environment basic |10~20 |4 day/time|2018 -2020 |8.5 |

| |protection |of construction |theories and | | | | |

| | |units |supervising methods, | | | | |

| | | |supervising report, | | | | |

| | | |position training | | | | |

| | | |Once each year: | | | | |

| | | |Environment management| | | | |

| | | |plan | | | | |

| | | |Environment monitor | | | | |

| | | |and report | | | | |

| | | |Contingency plan | | | | |

| |Supervision |Environment |Environment protection|5~10 |5 day/time|2018 -2020 |5.5 |

| | |protection |law and regulation, | | | | |

| | |supervising |construction planning,| | | | |

| | |engineer, |environment monitor | | | | |

| | |environment |criterion and | | | | |

| | |management staff of |planning, environment | | | | |

| | |construction party |air monitor and | | | | |

| | | |control technology, | | | | |

| | | |noise monitor and | | | | |

| | | |control technology | | | | |

|Total |70 |

Chapter VIII Reporting

8.1 Submission of contractor project document

According to requirements of the bidding documents, before starting the construction, the contractor compiles “Environment Management Implementation Plan” for this project engineering. This plan should be submitted to the construction supervising unit (CSE) for review, in order to make it conform to relevant laws, regulations and requirements of the approved “Environment Impact Report” and “Environment Management Plan”. Any changes of the submitted documents should be reviewed and approved by the representatives of construction supervising engineers. The “Environment Management Implementation Plan” approved by the supervising engineer will be submitted to EMC for inspection. If EMC has any additional suggestions, they will feedback to the contractor through supervising engineer. Relevant documents will be updated regularly.

8.2 Environment management plan report

The inspection results and relevant suggestions of all environment management plan report work required in the project will be recorded in the quarterly (half-year, annual) environment management report prepared by MEC. If it is necessary, MEC will prepare concise monthly report, especially when violation behaviors occur. The environment management implementation plan report will be submitted within two weeks after each report period. The first phase progress report will be submitted within the first month after the construction starts.

The quarterly (half-year, annual) environment management report at least includes the following content:

(a) 1-2 pages of execution conclusion

1) situation of violation of environment protection regulations;

2) Complaint record;

3) Report changes;

4) Key problems in the future.

(b) Basic project information

1) Project organizations, including names and contact telephone numbers of key staffs

2) Construction procedure;

3) Management structure;

4)Work needs to be completed in this quarter.

(c) Environment situation

1) Graphic illustration of work carried out in the quarter (such as project location and activities);

2) Graphical representation of locations of project areas, any environmental sensitive points and monitor stations.

(d) Conclusion required by the environment management plan

1) All monitor parameters;

2) Environment conformance level

3) Environment evaluation report of this project and execution situation of environment relieving measures recommended by environment management plan;

4) Requirements for the environment in the contract documents.

(e) Implementation situation

Suggestions for implementation situation of environment protection measures and pollution prevention and relieving measures, such as what recommended by the environment evaluation report and environment management plan of this project. They will be concluded in implementation plan.

(f) Monitor result

Provide monitor result and following information:

1) Monitor method

2) Name of laboratory: device type and calibration details

3) Monitor parameters;

4) Monitor location (and depth);

5) Monitor date, time, frequency and time limit;

6) Monitor the weather situation during the period;

7) Any other factors which are possible to influence the monitor result;

8) Quality assurance, quality control result and monitor restriction.

(g) Report violation behaviors, complaints, notifications and etc

1) Records of all inconformity (exceeding standard) of environment quality performance;

2) Record all the received complaints (in written form or oral form), including location and property of complaint investigation, adopted contact and consulting methods, actions and follow-up procedures, results and conclusions;

3) Record all the behaviors violating the local environment protection laws.

(h) Other

1) Introduction about inspection of key factors in the future from the work plan and work method announcement.

2) Suggestions for management situations of noise, atmosphere, water and solid wastes.

8.3 Data Records

Generally speaking, site documents such as site original monitor record, laboratory analysis record, video, pictures needn’t to be included in the submitted quarterly environment management plan report. However, the document will be kept by CSE of the proprietors so that it can be submitted at any time. All the relevant information will be recorded in the document explicitly and systematically.

The monitor data also needs to adopt electronic records. All the documents and materials will be stored in the construction period of the project. And within one year after the project is completed, if the proprietors have needs, they can acquire the relevant materials at any time.

Chapter IX Environment Management Plan Budget

Environment management expense estimation includes environment facility expense, monitor expenses, training expenses and external monitor consulting service fee of environment management plan. All the expenses have been included in the total investment estimation of this project.

9.1 Environment investment estimation

The total investment of the project is estimated to be RMB 700.6376 million Yuan. The environment protection investment includes expenses of environment protection facilities, equipment, environment monitor in construction period and etc. According to the environment protection countermeasures in this report, the initial estimation of one-off engineering environment protection investment of this project is RMB 25.01 million Yuan. The environment protection investment accounts for 3.57% of the total investment of the project. Among them, RMB 18.7704 million Yuan are listed in project investment. And newly added environment protection investment is RMB 6.2396 million Yuan. See Table 9.1-1 for environment protection investment.

Table 9.1-1 Investment Estimation of Environment Protection Measures

|Time Period |Content |Investment |

| | |Estimation |Total |

|Construction Period|Social environment|Investigations of ground and underground |150 |198 |

| | |pipelines | | |

| | |Media information |4 | |

| | |Billboard of construction site |4 | |

| | |Temporary substitute facilities of power and gas |40 | |

| | |pipelines and etc | | |

| |Ecological |Stacking and maintenance of earth acquiring and |10 |850 |

| |measures |spoil bank. | | |

| | |Replanted plants and trees transplantation and |800 | |

| | |etc | | |

| | |Ecological recovery of earth acquiring stations |40 | |

| |Air |Hardening treatment of construction site |30 |112 |

| | |Clean the wheel |10 | |

| | |Watering system |30 | |

| | |Complete enclosure on construction site |40 | |

| | |Monitor |2 | |

| |Environmental |Noise prevention such as equipment noise |100 |102 |

| |noise |elimination | | |

| | |Monitor |2 | |

| |Sewage |Simple disposal of sanitary sewage in |2 |10 |

| | |construction period | | |

| | |Disposal of waste water from vehicle washing |8 | |

| |Solid waste |Project spoil earth disposal |10 |15 |

| | |Disposal of household garbage |5 | |

| |Total |-— |1287 |

|Operation Period |Ecological |Greening measures such as replanted flowers, |100 |120 |

| |compensation |grass and trees | | |

| | |City sculpture and furniture |20 | |

| |Atmosphere |Road maintenance |50 |52 |

| | |Monitor |2 | |

| |Noise |Noise prevention such as sound insulation window|1035 |1037 |

| | |Monitor |2 | |

| |Total |-— |1209 |

| |Training of environment protection technical staffs |5 |5 |

|Total |-— |2501 |

9.2 Annual operation expenses of environment protection facilities

The operation fees of environment protection facility in the first three years of operation period are included in World Bank loan. Post-period operation fees of environment protection facility are included in the fees of company operation. The operation fees of environment protection facilities of this report are considered as three years and 0.66 million Yuan in total. See Table 9.2-1 for details.

Table 9.2-1 Annual Operation Fees of Environment Protection Facilities

|Serial No. |Project |Fees(10 thousand Yuan) |Remarks |

|1 |Environment monitor expenses in operation |10 |—— |

| |period | | |

|2 |Maintenance and updating of environment |8 |Sponge city facilities, solid waste|

| |protection facilities | |collection system and etc. |

|3 |Wages and service fees of facility |4 |—— |

| |maintenance staffs | | |

|Subtotal |22 |—— |

|Total |66 |3 years |

Appendix A: Tianjin Urban Transportation Project

External Environment Monitoring Consultant Service Outline

● Project Background

The project is located in Tianjin Heibei District, belongs to the Tianjin Urban Transportation Improvement Project. The green transportation improvement project in Heibei district financed by the World Bank consists of two major projects: technical assistance and. the unimpeded road network system project, which covers four sub-projects of Non Motor Traffic road construction, overhead line entry ground, drainage reconstruction, sponge city greening construction and ancillary facilities.

The unimpeded road network system project: ① Non Motor Traffic road construction: the total area of roadway breaking, sidewalks and side belt is 564,300 square meters; The total area of newly built roadways, sidewalks pedestrian street and bike lane is 532,800 square meters; Another 149,700 linear meters of traffic mark lines will be redrawn; added 616 traffic signs; newly built guardrail motor and non-motor lane 46,100 linear meters; newly built 87,300 shelter piles; newly built 124 safe islands; newly built bus shelter 4350 square meters; roadside parking management system and smart transportation system were built; relocating the original 555 road lamps; newly built 706 landscape street lamps; restructuring the power line 28,500 meters; newly built power line 33,600 meters. ② Overhead line grounding: 1002 electrical poles removed; laying 4-6 hole electric pipeline 25,800 meters; laying 4-6 hole communication pipelines 25,800 meters; at the same time network supporting facilities were built; .③ drainage improvement project: newly built d300 water intake branch pipe 35,000 meters; newly built 3167 water intake; newly built d400-d2600 rainwater pipe network 8378 meters; newly built d400 waste water pipe network 7422 meters; at the same time, network supporting facilities were built; ④sponge city greening construction and ancillary facilities: newly built greening belts along roadside and lateral zonations of greening belt 39,200 square meters; planted 3691 trees; building rainwater garden along roadside 1500 square meters; newly built 121 seat chairs along roadside; setting up 1408 trash can.

Technical assistance project: study on the development strategy of green transportation in center urban areas in Tianjin; research on motor vehicle development strategy and greenhouse gas emission in Tianjin; priority and decision support system for bus network in center urban areas; study on public bicycle management and operation model; multiple channel financing mechanism for sustainable development of unimpeded urban road project; standards of implementation for urban disaster preventing and rehabilitation system; pilot platform for disaster preventing and rehabilitation system; dissemination and promotion of urban traffic comprehensive improvement.

To achieve the objectives of the environmental management plan, the project Owner (Tianjin Construction Commission World Bank Finance Project Management Office ) will entrust supervision unit to arrange a special person to take responsibility of the environmental supervision during the construction period of project, in addition, the Owner will use the World Bank loan through a competitive procurement to hire external monitoring consultant with qualified and experienced environmental management plan, who can independently carry out external monitoring work and take in charge of regular and targeted construction site inspection and necessary environmental monitoring.

To understand the nature of external monitoring consultant of environmental management plan, the organization structure and working mechanism of the implementation environmental management plan during the construction period are provided as follows:

[pic]

● Task objective

The external monitoring consultants of EMP will act as an independent external authority to monitor whether construction activities fully meet the requirements of EMP. The external monitoring consultant will report the work results to the Owner directly.

● Working scope

1. Assess the ready work for sub-projects according to the indicators specified in EMP prior to implementation.

2. Assist the Owner to update EMP, when necessary, according to the detailed design of the project, update monitoring plan including extra environmental mitigation and monitoring measures, budget and institutional arrangements etc, to make sure that meet the requirements of domestic environmental laws, regulations and safeguard policies of the World Bank.

3. If some changes during the detailed design phase of project (For example, there has been a major change in the project content ) can lead to unfavorable environmental impacts, and these impacts, which have been approved, are not included in environmental impact assessment report, when necessary to update environmental impact assessment report.

4. Provide support and prepare the bidding documents for the Owner, to ensure the relative provisions included in bidding documents and civil work documents, and ask contractors to comply with mitigation measures in EMP. The corresponding chapters in EMP (or updated EMP) should be integrated into the bidding documents and contract documents.

5. Conduct the regular and compliant EMP assessment, inspect on-site in accordance with the requirements, to determine the implementation problems related to environment and provide the necessary corrective measure recommendations, respond to these issues in corrective action plan. The consultant shall adjust the site inspection plan according to the actual situation and schedule of the project construction.

6. Assist PMO to prepare annual environmental monitoring and progress report and submit to World Bank.

7. Provide environmental laws, regulations and safeguard policies of the World Bank, the training of EMP implementation etc. to PMO, the Owner and contractor in accordance with the training plan specified in EMP.

8. Assist PMO and the Owner to hold shareholders’ public consultant meeting, to report them about upcoming construction activities and the latest progress of the project.

9. During the period of the contract, in case of any environmental pollution accident, to provide the independent investigation and report to the Owner at the request of the Owner.

10)Assist the Owner and construction supervision entities to investigate and assess to environmental complaints at the request of the Owner.

● Staffs

The hired Environmental monitoring consultant (EMC ) must have at least five years of experience in environmental management, environmental supervision, training and monitoring, and be familiar with relevant environmental laws, regulations, technical standards, specifications and guidelines, familiar with safeguard policies of the World Bank project, participated in at least two times of the World Bank loan projects with similar consult services.

● Reporting

The regular report: report will be submitted environmental monitoring and progress report, quarter

report, half-year report ( June and December in each year ) and annual report..

Non regular report: report will be submitted after completing task individually (within a week after completing task)

-----------------------

EPB

World Bank

PMO of Tianjin Construction Commission

Independent EMP EMC retained by Owner

Construction Superviser (contractor)

PMO of Tianjin Construction Commission

PMO

Construction Commission

EPB

†Å

ˆÅ

ŠÅ

˜Å

šÅ

Ç

Ç

Í

















Ø

[?]Ø

ˆÜ

‰Ü

ŠÜ

‹Ü

Ά

ŽÜ



‘Ü

’Ü

ӆ

•Ü

—Ü

φ



íÙÕÐÕ»Õ·¯¡·™·™‘™·ÕÐÕŠ‚{sosososocVh2o?5?aJnHo([pic]tHh$¤h2o?5?aJo([pic]h˜X

jh˜X

U[pic]

hž#©hfÀjh±OãU[pic]

håc¹World Bank BBBanBankBank

CSE

(EMC)External monitoring consultant of EMP hired by the project Owner

Tianjin Construction Commission World Bank Finance Project Management Office

Figure 1 Organization structure chart of environmental management plan in construction stage