BIM PROJECT EXECUTION PLAN For: - USF

The Design Team shall be responsible for providing a fully coordinated and assembled BIM in a collaboration software format (Navisworks or approved) as well as separate copies of each technical discipline model in the original software authoring tool, as well as a 2D plan set, derived from the assembled BIM, for construction. ................
................

In order to avoid copyright disputes, this page is only a partial summary.

Google Online Preview   Download